Using Civil 3D to Create a Cut & Fill Earthwork Exhibit

Jeff Bartels
29 Nov 201608:21

Summary

TLDRThis tutorial demonstrates how to create a dynamic cut-and-fill earthwork exhibit for a proposed site plan, focusing on a fast-food restaurant project. It covers the process of calculating earthwork volumes, visualizing cut and fill areas through colorization, and labeling elevations using custom grid labels. The earthwork surface updates automatically if any changes are made to the existing or proposed grading surfaces, making the exhibit maintenance-free. This process helps professionals efficiently plan and analyze earthwork volumes in infrastructure projects.

Takeaways

  • 😀 The script demonstrates how to create a cut and fill earthwork exhibit for a proposed site plan, focusing on a fast-food restaurant project.
  • 😀 Existing conditions are represented by a 'survey' surface, while the proposed grading is represented by a 'plot' surface in the site plan.
  • 😀 Earthwork calculations are performed using a 'TIN volume surface,' which shows the difference between existing and proposed surfaces.
  • 😀 The net result of the earthwork calculations shows approximately 2,500 cubic yards of cut for the site.
  • 😀 A custom surface style is created to colorize the areas of cut and fill for better visualization, using red for cut and green for fill.
  • 😀 Elevational analysis is performed to highlight areas of cut and fill greater than 6 inches using a color range system.
  • 😀 The cut and fill analysis uses colorization to visualize the areas where the terrain has been altered, based on elevation differences.
  • 😀 Labels are added to the surface to indicate the elevation at specific grid points, helping visualize the distribution of cut and fill.
  • 😀 A new label style is created with custom settings such as grid spacing and label precision, making the exhibit more informative.
  • 😀 An expression is created to eliminate zero labels, simplifying the grid by removing unnecessary labels for areas with no elevation change.
  • 😀 The earthwork exhibit is dynamic, meaning any changes made to the existing or proposed surfaces automatically update the earthwork calculations and visualization.

Q & A

  • What is the purpose of creating a cut and fill earthwork exhibit?

    -The purpose is to visually represent the earthwork calculations for a proposed site plan, helping to identify areas of cut and fill for construction, specifically for a fast food restaurant in this case.

  • How does the software calculate the earthwork volumes?

    -The earthwork volumes are calculated by creating a TIN (Triangulated Irregular Network) volume surface, which represents the difference between two surfaces: the existing ground (survey) and the proposed grading (plot).

  • What is a TIN volume surface and how is it used in this context?

    -A TIN volume surface is a surface whose elevations are based on the difference between two other surfaces. In this context, it calculates the net cut and fill volume by comparing the existing ground and proposed grading surfaces.

  • What role do surface styles play in the earthwork exhibit?

    -Surface styles are used to control how the surfaces are displayed, such as showing only the surface elevations and applying colorization to highlight areas of cut and fill. This makes it easier to visualize the earthwork quantities.

  • How is the colorization of the cut and fill areas achieved?

    -The colorization is achieved by performing an elevation analysis on the surface, setting different color ranges for cut and fill. Red is used for cut areas, and green is used for fill areas, based on the elevation differences.

  • Why are areas with no significant change excluded from the display?

    -Areas with no significant change are excluded to focus on the relevant cut and fill zones. This helps make the exhibit clearer and more meaningful, especially by eliminating labels showing zero values where there's no elevation change.

  • How are labels for spot elevations added to the surface?

    -Labels for spot elevations are added by creating a new label style and positioning them on a grid. The grid spacing and rotation are adjusted to ensure that labels are placed at consistent intervals across the surface.

  • What is the purpose of using an expression to remove zero values in the labels?

    -The expression is used to eliminate labels that show zero values in areas where there is no change in elevation. This keeps the exhibit focused on areas of interest (cut and fill) and removes clutter from the display.

  • What happens to the earthwork exhibit if changes are made to the existing or proposed surfaces?

    -The earthwork exhibit automatically updates to reflect any changes made to the existing or proposed surfaces. This dynamic relationship ensures that the exhibit is always current without needing manual adjustments.

  • Why is it important to center the grid on the screen when adding labels?

    -Centering the grid helps ensure that the labels are placed in a consistent and organized manner, allowing for easy readability and better visualization of the spot elevations across the surface.

Outlines

plate

This section is available to paid users only. Please upgrade to access this part.

Upgrade Now

Mindmap

plate

This section is available to paid users only. Please upgrade to access this part.

Upgrade Now

Keywords

plate

This section is available to paid users only. Please upgrade to access this part.

Upgrade Now

Highlights

plate

This section is available to paid users only. Please upgrade to access this part.

Upgrade Now

Transcripts

plate

This section is available to paid users only. Please upgrade to access this part.

Upgrade Now
Rate This

5.0 / 5 (0 votes)

Related Tags
EarthworkSite PlanningCut and FillAutoCADGradingCivil EngineeringSurface AnalysisLand DevelopmentSurveyingConstruction