Critical Chain Project Management (CCPM): Method, Scheduling & Example - AIMS Education

AIMS Education, UK
17 Feb 202104:59

Summary

TLDRCritical Chain Project Management (CCPM), developed by Eliahu M. Goldratt in 1997, is a resource-focused approach that contrasts with traditional PERT and Critical Path Management. It emphasizes leveling resources like people and equipment, expects flexibility in task start times, and uses buffers for project control. CCPM minimizes project changes, reduces overrun costs, and improves schedule performance. It's particularly effective for large-scale projects with significant resource requirements, like those in IT and semiconductor industries, helping to reduce delivery times and stay within budget.

Takeaways

  • 📚 **Critical Chain Project Management (CCPM)** is a method that focuses on resources required for project tasks.
  • 👨‍🏫 Developed by Eliahu M. Goldratt in 1997, CCPM is based on his Theory of Constraints.
  • 🛠 It contrasts with traditional PERT and Critical Path Management (CPM) which are more rigid in scheduling.
  • ⏱️ CCPM uses 50% of the probable activity time and buffers to account for uncertainties.
  • 🔄 It aims to improve schedule performance and reduce the cost of project overruns.
  • 💡 The method is designed to enhance team performance and resource utilization.
  • 🚀 It helps in minimizing resource constraints before project commencement.
  • 🔗 Projects are linked to company resources using buffers, considering factors like variability.
  • 🛠 **Critical Chain Scheduling** is based on resource leveling, especially useful for resource-intensive projects.
  • 📉 CCPM is less effective for smaller, quick-turnaround projects due to the need for additional buffers.
  • 🆚 The main difference between **Critical Path** and **Critical Chain** is the focus on resource utilization versus task sequencing and deadlines.

Q & A

  • What is Critical Chain Project Management (CCPM)?

    -Critical Chain Project Management (CCPM) is a method of planning and managing projects that emphasizes the resources, such as people, equipment, and physical space, required to execute project tasks. It was developed by Eliyahu M. Goldratt in 1997 and is based on his earlier creation, the Theory of Constraints.

  • How does CCPM differ from traditional project management methods like PERT and Critical Path Management?

    -CCPM differs from traditional methods like PERT and Critical Path Management by focusing on resource leveling and expecting more flexibility during start times, rather than rigid scheduling and task order.

  • What is the main objective of CCPM?

    -The main objective of CCPM is to minimize project changes, reduce the cost of project overruns, and improve schedule performance by changing the project control and management system as well as the project plan.

  • How does the critical chain method work in terms of resource utilization?

    -The critical chain method emphasizes the critical chain, not the critical path, as the project constraint. It uses 50 percent of the probable activity time and employs buffers to account for the uncertainty of activity performances.

  • What is the purpose of using buffers in CCPM?

    -Buffers in CCPM are used to account for the uncertainty of activity performances and estimates. They can be used as a highly effective measurement tool for controlling the project schedule.

  • How does CCPM affect the behavior of the project team?

    -CCPM aims to modify and improve the behavior of the project team by enforcing early reporting of activities and eliminating multitasking.

  • What is critical chain scheduling and how does it benefit resource management?

    -Critical chain scheduling is a method based on resource leveling that helps manage projects with limited resources efficiently. It ensures that the company can manage their deliveries in an organized manner.

  • What are the merits of using critical chain scheduling in a project?

    -The merits of critical chain scheduling include better resource mapping, easier collaboration on tasks, and improved project control through the use of buffers.

  • What are the demerits of critical chain scheduling?

    -Critical chain scheduling may not be very useful for smaller projects that require a quick turnaround time, as it requires additional buffers at different stages of the project.

  • How does the critical path method differ from the critical chain method in terms of project focus?

    -The critical path method focuses on deadlines and milestones, while the critical chain method emphasizes resource utilization and ends at the start of the buffer allocated to the project, referred to as the project buffer.

  • In which industries is CCPM commonly applied and why?

    -CCPM is commonly applied in the IT industry, semiconductor industry, and high-tech projects, where it helps bring down delivery times, ensure projects are completed within budget, and prevent overrunning of budget and delivery times.

Outlines

00:00

🔗 Introduction to Critical Chain Project Management

Critical Chain Project Management (CCPM) is a resource-focused approach to planning and managing projects, emphasizing the allocation of people, equipment, and physical space. Developed by Eliyahu M. Goldratt in 1997, it contrasts with traditional methods like PERT and Critical Path Management by prioritizing resource leveling and flexibility. The method aims to enhance schedule performance, minimize project changes, and reduce cost overruns. It seeks to optimize team performance and resource constraints through the use of buffers for project control.

Mindmap

Keywords

💡Critical Chain Project Management (CCPM)

CCPM is a project management methodology that focuses on resource allocation, emphasizing people, equipment, and physical space required for project tasks. Developed by Eliyahu M. Goldratt in 1997, it is based on his earlier work, the Theory of Constraints. Unlike traditional methods like PERT and Critical Path Management, CCPM is more flexible and resource-oriented, aiming to level resources and improve schedule performance. The script mentions that CCPM 'minimizes the project changes and tries to bring down the cost of project overruns by improving the schedule performance'.

💡Theory of Constraints

The Theory of Constraints is a management theory that focuses on identifying and optimizing the most restrictive step in any process. It forms the basis for CCPM and is used to improve overall efficiency. In the script, it is noted as the precursor to Goldratt's development of CCPM.

💡PERT Algorithm

The PERT (Program Evaluation and Review Technique) Algorithm is a project management tool used to analyze the tasks involved in completing a given project. It is based on the critical path method, which is more rigid in scheduling compared to CCPM. The script contrasts CCPM with PERT, highlighting the latter's focus on 'rigid scheduling and the task order'.

💡Critical Path Management

Critical Path Management is a traditional project management approach that focuses on the sequence of project network activities which are dependent on one another. The script mentions that CCPM differs from this method by emphasizing resource leveling and flexibility 'while the critical chain method is about keeping the resources leveled and expects more flexibility during the start times'.

💡Resource Leveling

Resource Leveling in project management involves the allocation of resources in a way that balances the workload across available resources. CCPM uses resource leveling to manage projects with limited resources efficiently. The script states that 'resource leveling is an important factor in any project' and CCPM can be very useful for projects requiring a huge amount of resources.

💡Buffers

Buffers in CCPM are used to account for the uncertainty of activity performances and to manage the variability in project schedules. They are a key tool for effective project control. The script explains that CCPM 'makes use of buffers for effective project control' and that these buffers consider factors such as activity duration variability.

💡Multitasking

Multitasking is the practice of working on multiple tasks or projects simultaneously, which can lead to inefficiencies. CCPM aims to eliminate multitasking to improve project performance. The script mentions that CCPM 'enforces early reporting of activities and eliminates multitasking'.

💡Project Buffer

A Project Buffer in CCPM is a buffer allocated at the start of a project to manage the variability of the entire project. It is different from the buffers used in the Critical Path Method. The script distinguishes the critical chain, which 'ends at the start of the buffer allocated to the project, referred to as the project buffer'.

💡Resource Utilization

Resource Utilization refers to the efficient use of resources in a project. CCPM emphasizes resource utilization over strict adherence to deadlines and milestones. The script notes that 'the critical chain emphasizes resource utilization', contrasting it with the critical path method which is more deadline-focused.

💡Activity Sequencing

Activity Sequencing is the process of arranging project activities in a logical order. It is a key component of the Critical Path Method but not as emphasized in CCPM. The script mentions that 'in the critical path method we make use of activity sequencing', whereas CCPM uses critical chain scheduling.

💡Delivery Times

Delivery Times refer to the scheduled dates by which project tasks or the entire project should be completed. CCPM helps in managing delivery times effectively by reducing project overruns. The script gives examples of how CCPM has been used in the IT industry to 'bring down delivery times' and ensure projects are completed within the pre-decided budget.

Highlights

Critical Chain Project Management (CCPM) focuses on resources required for project tasks.

Developed by Eliyahu M. Goldratt in 1997, based on his Theory of Constraints.

CCPM contrasts with traditional PERT and Critical Path Management.

Emphasizes resource leveling and flexibility in project start times.

Aims to minimize project changes and reduce costs of overruns.

Improves schedule performance by changing project control and management systems.

Objective is to enhance project team and staff performance.

Buffers are used for effective project control, considering resource constraints.

50% of probable activity time is used in CCPM scheduling.

Buffers account for uncertainty in activity performance estimates.

Projects are linked to company resources using buffers for schedule control.

CCPM modifies team behavior, enforces early reporting, and eliminates multitasking.

Resource leveling is crucial for managing projects with limited resources.

CCPM is beneficial for resource-intensive projects, ensuring efficient delivery.

CCPM may not be suitable for smaller, quick-turnaround projects due to additional buffers.

Critical Path focuses on activity sequencing and deadlines, while CCPM emphasizes resource utilization.

CCPM is widely applied in the IT industry to reduce delivery times and stay within budget.

Also used in the semiconductor industry to prevent budget and delivery time overruns.

Transcripts

play00:01

[Music]

play00:08

critical chain

play00:09

project management critical chain

play00:12

project management or

play00:13

ccpm is defined as a method of planning

play00:17

and managing projects that emphasizes

play00:19

the resources

play00:20

that is people equipment and physical

play00:22

space required to execute project tasks

play00:26

it was eliahu m goldratz the brilliant

play00:29

business management expert and renowned

play00:31

writer who developed critical chain

play00:33

management in 1997.

play00:36

gold rat's ideas on critical chain

play00:38

project management are based on one of

play00:40

his earlier creations

play00:41

the theory of constraints the critical

play00:44

chain method is different from the more

play00:46

traditional management philosophies

play00:48

based on the pert algorithm and critical

play00:50

path management

play00:52

these methods are focused on rigid

play00:54

scheduling and the task order

play00:56

while the critical train method is about

play00:58

keeping the resources leveled and

play01:00

expects more flexibility during the

play01:02

start times

play01:04

understanding the critical chain method

play01:07

the critical chain method has a strong

play01:09

focus on the project's schedule

play01:11

it minimizes the project changes and

play01:13

tries to bring down the cost of project

play01:15

overruns by improving the schedule

play01:18

performance

play01:19

it aims to bring about a more positive

play01:21

result by changing the project control

play01:23

and management system as well as the

play01:25

project plan

play01:27

one of the objectives is to extract a

play01:29

better performance from the project team

play01:31

and the supporting staff this method can

play01:34

help minimize

play01:35

most of the resource constraints before

play01:37

the start of a project

play01:38

and makes use of buffers for effective

play01:40

project control

play01:43

how the critical train method works it

play01:46

emphasizes the critical chain

play01:48

and not the critical path as the project

play01:50

constraint

play01:51

here's a look at how it works it uses 50

play01:54

percent of the probable

play01:55

activity time it makes use of buffers to

play01:58

account for the uncertainty of activity

play02:00

performances

play02:01

and estimates the buffers can be used as

play02:04

a highly effective measurement tool for

play02:06

controlling the project schedule

play02:08

the projects are linked to the

play02:10

constraining company resource using

play02:12

buffers

play02:12

which consider factors such as the

play02:14

activity duration variability

play02:17

and the method aims to modify and

play02:19

improve the behavior of the project team

play02:21

enforces early reporting of activities

play02:23

and eliminates multitasking

play02:27

critical chain scheduling critical chain

play02:30

scheduling is a method that's based on

play02:32

resource

play02:33

leveling for any company the perfect

play02:35

scenario is when there is absolutely no

play02:38

shortage of resources

play02:39

but such situations are never the case

play02:42

in reality

play02:43

most of the projects that are run by a

play02:45

company have to be managed with limited

play02:47

resources

play02:48

resource leveling is an important factor

play02:50

in any project

play02:52

critical chain scheduling can be very

play02:54

useful for projects that require a huge

play02:56

amount of resources

play02:57

so that the company can manage their

play02:59

deliveries in an efficient manner

play03:02

the merits of critical chain scheduling

play03:05

since the resources are mapped out

play03:07

you will know what is available for

play03:08

different stages of the project

play03:10

this makes collaboration on tasks easier

play03:14

demerits of critical chain scheduling

play03:17

not very useful for smaller projects

play03:19

that require a quick turnaround time as

play03:21

it requires additional buffers at

play03:23

different stages of the project

play03:26

critical chain versus critical path the

play03:29

difference between critical path and

play03:31

critical chain

play03:32

is that the former goes from the start

play03:34

of the project to the conclusion

play03:36

while the latter ends at the start of

play03:38

the buffer allocated to the project

play03:40

referred to as the project buffer in the

play03:42

critical path we make use of activity

play03:45

sequencing

play03:46

while in the critical chain method we

play03:48

use critical chain scheduling

play03:50

the critical path method is more focused

play03:52

on deadlines and milestones

play03:54

and the critical chain emphasizes

play03:56

resource utilization

play03:59

examples of critical chain project

play04:01

management

play04:02

many ccpm examples and applications can

play04:05

be found in the it industry

play04:08

application of this principle has helped

play04:10

many it companies bring down delivery

play04:12

times

play04:12

and ensure that the projects are

play04:14

completed within the pre-decided budget

play04:17

it is also used to prevent overrunning

play04:19

of the budget and delivery times in the

play04:21

semiconductor industry

play04:23

embedded systems projects and other

play04:25

high-tech projects

play04:58

you

Rate This

5.0 / 5 (0 votes)

Связанные теги
Project ManagementResource AllocationCritical ChainCCPMGoldrattEfficiencyIT IndustryResource LevelingProject SchedulingBuffer Management
Вам нужно краткое изложение на английском?