New Home Rough-In Stage (2020)
Summary
TLDRBoris the Builder from London Foam Construction updates on a three-story building project in Brisbane. The frame and roof are completed, moving to the 'roughing' stage where essential services are installed behind walls, ceilings, and floors. This includes plumbing, electrical work, air-conditioning, and gas lines. Plumbing is prioritized, followed by electrical wiring for power, telecommunication lines, and smart home systems. Ducted air conditioning is also integrated. Once all roughing components are inspected and adjusted, the project moves to internal plastering.
Takeaways
- 🏗️ The video is about the 'roughing' stage of construction in a three-story building in Brisbane.
- 🛠️ The roughing stage involves installing hidden services such as plumbing, electrical, air-conditioning, and others behind the walls, ceiling, and floor systems.
- 💧 Plumbing is the first service to be installed, starting with vertical stacks that connect all points from the laundry, kitchen, and bathrooms to the under slab waste plumbing system.
- 🚰 Water supply pipes are then installed to provide fresh water to showers, basin taps, kitchen mixers, toilets, and external taps.
- 🔥 If required, gas lines for natural or LPG gas are installed to supply cooktops, hot water systems, external barbecues, and fireplaces.
- 🔌 Electrical roughing follows, with power cables running from the external meter box to the internal switchboard and throughout the house to various fixtures.
- 📺 Along with power cables, telecommunication lines, TV antenna cables, NBN provisions, intercoms, security systems, and exhaust ducts are also installed.
- 🌡️ Concealed air conditioning components, most commonly ducted systems, are installed during the electrical roughing, with insulated ducts run throughout the sealing spaces.
- 🔄 The ducted air conditioning system has a central control unit that can be integrated with a smart home setup for seamless control.
- 🔍 After all roughing components are completed, a careful inspection is conducted to make necessary adjustments and changes.
- 🛋️ The completion of the roughing stage prepares the building for the next phase, which is internal plastering.
Q & A
Who is Boris the Builder and what is his profession?
-Boris the Builder is a professional involved in the construction industry, specifically in foam construction, and he is based in London.
What is the current status of the three-story building in Brisbane mentioned in the script?
-The three-story building in Brisbane has its frame and roof completed, providing some protection from the elements, but the construction process is not yet finished.
What does the term 'roughing' refer to in the construction process?
-In construction, 'roughing' refers to the stage where all the hidden services, such as plumbing, electrical, and air-conditioning, are installed behind the walls, within the ceiling space, and within the floor system.
Why is the roughing stage considered important in construction?
-The roughing stage is important because it is the last point at which clear access to the house frame is available before the internal linings are installed, making it crucial to plan and execute each aspect carefully.
What are the main services that are installed during the roughing stage?
-The main services installed during the roughing stage include plumbing, electrical systems, air-conditioning, and other necessary utilities that will make the home comfortable and functional.
Why are plumbing pipes installed first during the roughing stage?
-Plumbing pipes are installed first during the roughing stage because they can be bulky, require specific positioning, and need to be installed with appropriate force.
What are 'stacks' in the context of plumbing during the roughing stage?
-'Stacks' refer to the vertical runs of pipes that extend from the under-slab waste plumbing to the upper floor bathrooms, connecting various points such as the laundry, kitchen, and every bathroom.
What is the role of water supply pipes during the roughing stage?
-Water supply pipes are responsible for feeding fresh water to showers, basin taps, kitchen mixers, toilets, and external taps in the home.
How does the electrical roughing process work in a construction project?
-During the electrical roughing process, power cables are installed from the external meter box to the internal switchboard and throughout the house, branching off to supply power to lights, fans, switches, power points, appliances, and other fixtures.
What are the components of a ducted air conditioning system that might be installed during the roughing stage?
-The components of a ducted air conditioning system installed during the roughing stage include insulated ducts that are run throughout the sealing spaces and connected to rooms as required, along with a central control unit to manage the system.
What is the final step after completing all the roughing components in a construction project?
-The final step after completing all the roughing components is to carefully inspect the work, make any necessary adjustments and changes, and then proceed to the internal plastering stage.
Outlines
🏗️ Roughing Stage of Construction
Boris the Builder introduces the roughing stage of construction at a three-story building in Brisbane. This phase involves installing hidden services such as plumbing, electrical, air-conditioning, and others within the walls, ceilings, and floors. The importance of careful planning is emphasized as this is the last chance to access the house frame before internal linings are installed. Plumbing is the first service to be installed, including stacks, water supply pipes, and gas lines if required. The summary explains the installation process for each type of plumbing and highlights the significance of this stage in making the home comfortable and functional.
Mindmap
Keywords
💡Roughing stage
💡Hidden services
💡Plumbing
💡Electrical roughing
💡Air-conditioning
💡Telecommunication lines
💡Internal plastering
💡Gas lines
💡Stacks
💡Ducted systems
💡Smart home setup
Highlights
Introduction to Boris the Builder and the foam construction project in Brisbane.
Description of the building's current state with completed roof and frame.
Explanation of the 'roughing' stage in construction.
Importance of installing hidden services during the roughing stage.
Detailing the types of services installed, including plumbing, electrical, and air-conditioning.
The significance of planning during the roughing stage for future access to the house frame.
Prioritization and installation process of plumbing pipes.
Installation of vertical plumbing stacks and connection to bathroom and laundry systems.
Description of water supply pipes and their distribution throughout the house.
Mention of gas line installation for homes requiring gas supply.
Electrical roughing process, including power cable installation and connection to the switchboard.
Integration of telecommunication and TV antenna cables during the electrical roughing stage.
Installation of concealed air conditioning components and the use of ducted systems.
The potential for smart home integration with air conditioning systems.
Inspection and adjustment process post-installation of roughing components.
Preparation for internal plastering after the completion of the roughing stage.
Transcripts
hey guys I'm Boris the Builder from
London foam construction I'm back again
here at this three-story building Cooper
ooh Brisbane now as you can see behind
me here the frame has not been completed
the roof has also been completed so the
building is now somewhat protected from
the elements the next part of the
construction process is called the
roughen now during this part of the
construction process is when we install
all the hidden services that are hidden
behind the walls within the ceiling
space and within the floor system and
these include the plumbing the
electrical the air-conditioning and
others so let's go see what it's all
about the roughing stage is when all the
main services that run behind the walls
inside the ceiling space and under the
flooring are installed in your new home
these are the services that will make
your home comfortable and keep
everything running behind the scenes it
is important to plan each aspect
carefully because the roughing stage is
the last point at which we will have
clear access to the house frame before
the internal linings are installed we
usually start with the plumbing plumbing
pipes can be bulky require specific
positioning they need to be installed
with appropriate force because of this
they are prioritized and installed first
during the roughing stage we start with
the stacks these are the vertical runs
of pipe which extend the under slab
waste plumbing with the upper floor
bathrooms each point from the laundry
kitchen and every bathroom is connected
to the system including floor wastes
sinks basins bathtubs and toilets we
then installed the water supply pipes
these feed fresh water to the showers
basin taps kitchen mixes toilets and
external taps if the home requires
gasify we'll also install gas lines at
this stage natural or LPG gas is
commonly used to supply cooktops hot
water systems external barbecues and
fireplaces
once the plumbing is completed we move
on to the electrical roughing power
cables are installed from the external
meter box to the internal switchboard
and on throughout the house these cables
branch off to feed the lights vans
switches power points appliances and
other fixtures along with the power
cables we installed telecommunication
lines TV antenna cables NBN provisions
intercoms security systems and exhaust
ducts around the same time as the
electrical roofing we installed the
concealed air conditioning components
most commonly we use ducted systems the
insulated ducts are run throughout the
sealing spaces and fed to rooms
throughout as required
the ducted system will have a central
control unit to manage the various
designs it can be integrated with a
smart home setup creating a seamless and
intuitive system once all the roughing
components are completed we carefully
inspect the work and make any necessary
adjustments and changes we are then
ready for the internal plastering
Ver Más Videos Relacionados
Renovar um apartamento! Básicos e valores !
Transformational Building Technologies - DFMA (Prefab MEP) and BIM
Siding, Windows & Doors Installation (COST REVEALED!) | 60 Day Home Build Challenge!
Bleed Air Systems - Pneumatics - Airframes & Aircraft Systems #38
HVAC Systems : Understanding Components and Functionality | Mr. Smart Explains!
Renovating an Abandoned Mansion Part 9
5.0 / 5 (0 votes)