Smartsheet Tutorial: How to Create Automations, Build Workflows, & Set Up Conditional Formatting

Echo Consulting
24 Aug 202225:14

Summary

TLDRIn this webinar, Charlie Roy, an implementation consultant from Echo Consulting, provides an in-depth tutorial on utilizing conditional formatting and automations within Smartsheet to enhance project management. The session covers setting up conditional formatting rules to improve sheet organization and readability, alongside constructing simple automations to streamline processes, reduce manual data entry, and ensure timely updates. The webinar is interactive, allowing participants to ask questions, with a recording made available post-event. Additionally, Echo Consulting's upcoming webinars on risk management and leading impactful meetings are introduced.

Takeaways

  • 📌 Conditional formatting in Smartsheet helps in better organization and easier viewing by changing formats based on specified conditions.
  • 🛠 Automations in Smartsheet can reduce manual data entry, keep stakeholders updated, and streamline processes for increased efficiency.
  • 📝 Recording of the webinar will be available post-session, making it easy for attendees to revisit the content.
  • 📰 Conditional formatting rules can be created to highlight specific rows or cells, such as phases or overdue tasks, improving readability.
  • 🚨 Automations can be set up to send notifications, like update requests, to stakeholders when certain conditions are met, ensuring timely communication.
  • 💡 The session provides practical examples of creating conditional formatting rules and automations, offering hands-on learning for attendees.
  • 💁‍💼 Echo Consulting is highlighted as a women-owned project management solutions company, showcasing its expertise in the webinar.
  • 💬 Audience engagement is encouraged through the webinar, allowing for real-time questions and interaction.
  • 📢 Upcoming webinars and additional resources from Echo Consulting are mentioned, providing further learning opportunities.
  • 🔧 Tips and tricks for effective use of conditional formatting and automations in Smartsheet are shared, enhancing the utility of the tool.

Q & A

  • Who conducted the webinar on conditional formatting and automations in Smartsheet?

    -Charlie Roy, an implementation consultant for Echo Consulting.

  • What is Echo Consulting?

    -Echo Consulting is a women-owned project management solutions company offering a variety of services to a wide range of organizations and organization sizes.

  • What were the main topics covered in the webinar?

    -The webinar covered the purpose and use cases for conditional formatting and automations in Smartsheet, including how to create conditional formatting rules and simple automations.

  • What is the purpose of conditional formatting in Smartsheet?

    -Conditional formatting aims to provide better organization and easier viewing of content within sheets and reports by changing the format of specific rows, columns, or cells based on specified conditions.

  • How can automations in Smartsheet enhance efficiency?

    -Automations are used to reduce manual data entry, keep stakeholders up to date on relevant tasks, and streamline processes for increased efficiency.

  • What are some examples of conditional formatting rules demonstrated in the webinar?

    -Examples include highlighting phase rows for better visibility and highlighting tasks that are past due and incomplete in red.

  • What types of automations were demonstrated in the webinar?

    -The webinar demonstrated how to create an update request automation for assigned tasks and how to automatically populate cell values in new rows.

  • How can you customize an automation in Smartsheet?

    -You can customize automations by setting triggers, actions, and additional conditions. You can also customize the message that goes out with an alert.

  • What are the benefits of recording dates using automations in Smartsheet?

    -Recording dates automatically when a task's status changes to complete helps in tracking progress and maintaining accurate records over time.

  • What upcoming webinars were mentioned by Echo Consulting?

    -Echo Consulting mentioned upcoming webinars on risk management techniques utilizing a crate log and best practices for leading impactful meetings.

Outlines

00:00

📄 Introduction to Conditional Formatting and Automations

The speaker introduces himself and the purpose of the webinar, which is to explore conditional formatting and automations in Smartsheet. He explains the benefits of conditional formatting for better organization and easier viewing of content, and the advantages of automations for reducing manual data entry, keeping stakeholders informed, and streamlining processes. He then begins demonstrating how to create conditional formatting rules in Smartsheet.

05:00

✨ Creating Conditional Formatting Rules

The speaker walks through creating a conditional formatting rule to highlight phase rows in a project plan sheet. He then demonstrates highlighting rows where the task is past due and incomplete using additional conditions. Next, he applies a rule to gray out completed task rows. By the end of this section, the project plan is visually enhanced to easily identify critical information.

10:04

⚙️ Setting up Automations

The speaker introduces automations and their purpose of streamlining processes. He begins by creating an automation to send an email notification when a task is assigned to someone. The steps involve setting a trigger (when the 'Assigned To' field changes), selecting an action (alerting someone), and customizing the message details. This automation helps keep stakeholders informed about their assigned tasks.

15:06

🔄 Creating Default Values with Automations

The speaker demonstrates how to use automations to reduce manual data entry by pre-populating certain fields when a new row is added. He creates an automation that sets the 'Percent Complete' to 0, 'Status' to 'Not Started', and 'Task Type' to 'Task' whenever a new row is added. This automation streamlines the process of creating new tasks in the project plan.

20:10

📅 Recording Dates with Automations

The speaker showcases an automation to record the date when a task is marked as complete. The trigger is set to fire when the 'Status' column changes to 'Complete', and the action is to record the current date in the 'Complete Date Record' column. This automation helps track task completion dates without manual entry, enhancing project reporting and analysis.

Mindmap

Keywords

💡Conditional Formatting

Conditional formatting refers to the ability to apply specific formatting (such as colors, fonts, or highlights) to cells, rows, or columns in a spreadsheet based on predefined conditions or rules. In the context of this video, conditional formatting is used in Smartsheet to better organize and visualize important information within project plans or sheets. For example, highlighting rows where tasks are past due, bolding phase headings, or graying out completed tasks. By applying conditional formatting, users can quickly identify and focus on the relevant or critical information within their sheets.

💡Automations

Automations are pre-defined actions or workflows that are triggered by specific events or conditions within a Smartsheet sheet. They are designed to streamline processes, reduce manual data entry, and increase efficiency. In the video, examples of automations include sending notifications when a task is assigned to a user, populating default values (such as setting the percent complete to 0% for new tasks), and updating the status of a task based on the percent complete value. Automations help automate repetitive tasks and keep stakeholders informed about relevant updates.

💡Project Plan

A project plan is a comprehensive document or sheet that outlines the tasks, schedules, resources, and other details required for completing a project. In the video, the presenter demonstrates conditional formatting and automations using a basic project plan sheet in Smartsheet. A project plan serves as a central reference point for tracking progress, managing tasks, and ensuring that the project stays on track.

💡Formatting Bar

The formatting bar is a user interface element within Smartsheet that provides access to various formatting options, including conditional formatting. In the video, the presenter navigates to the formatting bar and selects the conditional formatting button to create and apply formatting rules based on specific conditions. The formatting bar is a key tool for customizing the appearance and organization of information within a Smartsheet sheet.

💡Triggers

In the context of automations, triggers are the specific events or conditions that initiate or 'trigger' an automated action or workflow. In the video, examples of triggers include when rows are added or changed, when a date is reached, and when a specific column value changes (e.g., when the status changes to 'complete'). Triggers are the starting point for defining automated workflows, allowing users to specify the conditions under which certain actions should be performed.

💡Actions

Actions are the specific tasks or operations that are performed as part of an automation workflow. In the video, examples of actions include alerting someone (sending a notification), changing cell values (such as setting the percent complete to 0% for new tasks), and recording dates (e.g., updating the complete date record when a task is marked as complete). Actions define the behavior or functionality that should occur when the specified trigger conditions are met.

💡Workflow

A workflow is a series of connected steps or actions that are performed in a specific order to achieve a desired outcome. In the context of Smartsheet automations, a workflow defines the trigger conditions, actions to be taken, and any additional conditions or logic that should be applied. In the video, the presenter creates and configures various workflows to automate tasks such as sending notifications, populating default values, and updating task statuses based on specific conditions.

💡Stakeholders

Stakeholders are individuals or groups who have a vested interest in the successful completion of a project or task. In the context of the video, the presenter mentions using automations to keep stakeholders up-to-date on relevant tasks. By automating notifications or alerts, stakeholders can be informed about important updates, assigned tasks, or changes in project status without the need for manual communication. Keeping stakeholders informed is crucial for effective project management and collaboration.

💡Manual Data Entry

Manual data entry refers to the process of manually inputting or updating data into a system or document. In the video, the presenter highlights the use of automations to reduce manual data entry, such as populating default values for new tasks or updating task statuses based on certain conditions. Automating these tasks not only saves time and reduces the potential for human error but also increases efficiency by eliminating repetitive and tedious data entry tasks.

💡Streamline Processes

To streamline processes means to optimize and simplify workflows or procedures by eliminating unnecessary steps, reducing redundancies, and automating repetitive tasks. In the video, the presenter emphasizes the use of automations in Smartsheet to streamline processes for increased efficiency. By automating tasks like sending notifications, updating statuses, and recording dates, users can focus on more critical tasks while ensuring that important information is captured and shared seamlessly.

Highlights

One of the purposes of conditional formatting is just better organization, and easier viewing of content within your sheets and reports.

You can change the format on specific rows and columns that meet specified conditions and you can highlight certain cells that meet specified conditions.

We like to use automations to reduce manual data entry, keep stakeholders up to date on relevant tasks and streamline processes for increased efficiency.

Creating a conditional formatting rule to highlight phase rows in a project plan to make it easier to digest.

Highlighting rows where the finish date is in the past and the task status is 'not started' or 'in progress' to easily identify delayed tasks.

Graying out completed task rows to focus on upcoming or incomplete tasks.

Using an 'update request' automation to send a notification when a task is assigned to someone.

Creating an automation to pre-populate default values like percent complete, status, and task type when a new row is added to reduce manual data entry.

Recording a date in a separate column when a task's status is marked as 'complete' using an automation.

Creating an automation to update the status to 'complete' when the percent complete reaches 100% to maintain consistency.

Noting that automations only run after they are created, so existing discrepancies may need to be manually updated.

Mentioning that automations can be scheduled to run hourly, daily, or weekly to receive updates in batches instead of individually.

Explaining the importance of setting up columns as the correct data type (e.g., date columns) before creating automations that rely on those column types.

Highlighting the ability to use templates or create automations from scratch in Smartsheet.

Mentioning the availability of a recording and slide deck from the webinar for future reference.

Transcripts

play00:02

conditional formatting and automations

play00:05

in smartsheet

play00:06

my name is charlie roy i'm a

play00:08

implementation consultant for echo

play00:10

consulting

play00:13

echo consulting is a women-owned project

play00:16

management solutions company

play00:19

we offer a wide variety of services to a

play00:23

wide range of organizations and

play00:26

organization sizes

play00:29

just to go through the rules of

play00:30

engagement for this webinar please feel

play00:32

free to unmute yourself at any time to

play00:34

engage and ask questions throughout the

play00:35

webinar

play00:36

there should also be some time at the

play00:38

end

play00:39

to follow up with questions if you have

play00:41

them

play00:43

please feel free to take notes as we go

play00:45

throughout but a recording of this

play00:47

webinar will be made available to you

play00:50

once it's finished

play00:54

so what to expect today

play00:56

we're going to be going through uh kind

play00:58

of the purpose and some use cases for

play01:00

conditional formatting and automations

play01:03

in your smartsheet sheets

play01:06

we'll go through how to use conditional

play01:08

formatting and actually

play01:10

create a few and we'll also go through

play01:13

how to build

play01:14

some simple automations in your

play01:16

smartsheet sheets

play01:18

as we go through we'll be giving a few

play01:21

tips and tricks for conditional

play01:22

formatting and automations

play01:29

so one of the purposes of conditional

play01:31

formatting is just better organization

play01:33

and easier viewing of content within

play01:36

your sheets and reports

play01:40

you can change the format on specific

play01:42

rows and columns that meet specified

play01:44

conditions and you can highlight certain

play01:46

cells that meet specified conditions

play01:51

for automations

play01:53

we like to use them to reduce manual

play01:55

data entry

play01:56

keep stakeholders up to date on relevant

play01:58

tasks and streamline processes for

play02:01

increased efficiency

play02:07

so now we're going to head into

play02:08

smartsheet

play02:10

and as you can see here i just have a

play02:13

basic project plan for you

play02:16

we're going to get started as you can

play02:18

see here it's just all white it's not

play02:20

the easiest to read and we're going to

play02:22

make a few conditional formatting rules

play02:25

just to make this a little bit easier to

play02:28

digest

play02:32

so one of the in order to um

play02:36

use conditional formatting you're going

play02:37

to go up to your formatting bar in your

play02:40

smartsheet sheet and you're going to

play02:42

click on this button here for

play02:44

conditional formatting

play02:48

and to add a new rule you just click add

play02:50

new rule and then you're going to get

play02:53

prompted to set a condition

play02:56

and then

play02:57

under this format that's where you can

play02:59

set the type of formatting whether it be

play03:01

bolding

play03:03

your

play03:04

background fill of the cell or the color

play03:07

of your text

play03:09

and then you're also going to select

play03:11

where that format

play03:13

is highlighted whether it's just a cell

play03:15

or an entire row

play03:18

so we're going to start by i'm going to

play03:20

back out here

play03:21

this card

play03:23

and so

play03:24

i want to highlight all of these phase

play03:27

rows just so that

play03:29

it's a little bit easier to digest

play03:31

within my sheet

play03:32

so i'm going to go here and create a new

play03:34

rule

play03:35

and my condition is going to be that

play03:38

this task type column over here

play03:42

is a phase

play03:47

now i'm just going to

play03:49

change the format to highlight it

play03:51

there we go

play03:53

and i might bold the letters as well

play03:56

okay

play03:57

so now all of my phase headings

play04:00

are going to show up in this light blue

play04:02

and all of the text within those

play04:04

headings is going to be bolded

play04:10

so some other conditional formatting

play04:11

that we like to do is based on

play04:13

conditions within the cells

play04:15

so for instance if

play04:18

a task is past due and the task is

play04:21

incomplete it'd be nice to highlight

play04:23

that row

play04:24

so we're going to do that so we can see

play04:26

here that we have this received lumber

play04:30

delivery in our project plan it has a

play04:32

finish date that is in the past

play04:36

and it is still in progress so we're

play04:39

going to highlight that row

play04:43

we're going to add a new rule

play04:45

so we're going to set the condition

play04:47

that the finish

play04:52

is in the past so you have a whole bunch

play04:54

of options to select from here

play05:00

i'm going to select in the past

play05:03

okay

play05:06

and format it we're just going to

play05:08

highlight that whole row

play05:10

in a red color

play05:13

now

play05:14

we're going to come back in and edit

play05:16

that

play05:17

condition because as we can see here

play05:20

we have ordering the lumber as a task

play05:22

but that's complete so we don't

play05:24

necessarily need to highlight that as

play05:26

red

play05:28

going back into the conditional

play05:30

formatting

play05:31

we're going to take this finishes in the

play05:33

past

play05:34

option here and we are going to

play05:37

add

play05:38

a condition

play05:40

so it's if the finish is in the past and

play05:45

if the status

play05:50

is not started or still in progress

play05:57

so now we can see that it's only

play05:59

highlighting that one row

play06:04

any questions so far is everybody

play06:06

following along

play06:10

all right i'm going to take the silence

play06:12

as everybody's got it

play06:15

so now we're going to go in as well

play06:17

because when you're looking at your

play06:18

project plans it's helpful to look at

play06:21

only the things that are upcoming or the

play06:23

things that you still need to get done

play06:26

so i'm going to add a formatting here

play06:29

to

play06:30

gray out any of the rows that have been

play06:32

completed

play06:34

once again i'll go back up to add

play06:36

conditional formatting i'm going to

play06:39

add a new rule

play06:43

and i'm going to say

play06:44

if the status

play06:47

is complete

play06:53

we're going to apply this format

play07:00

to the entire row

play07:03

okay

play07:05

excellent

play07:06

cool

play07:07

so as you can see by adding some

play07:09

conditional formatting it becomes a lot

play07:11

easier for you to

play07:13

look at

play07:14

um

play07:15

any tasks that are upcoming or the real

play07:18

content of the sheet that matters to you

play07:22

so now we're going to go into how to add

play07:25

some automations here to kind of

play07:27

streamline your

play07:28

processes and one of

play07:31

my favorite automations is using an

play07:34

update request

play07:36

so for instance let's say that

play07:39

we need to schedule a crane in this

play07:41

example and i come over here and i

play07:43

assign the task

play07:45

to myself

play07:48

now what's helpful is

play07:50

in smartsheet by using an automation

play07:53

when i get assigned this task i can have

play07:56

smartsheet send me a notification that

play07:58

i've been assigned so we're going to go

play08:00

through how to build that up

play08:03

this

play08:05

in order to create new automations in a

play08:07

sheet you come up to this automation tab

play08:12

and in our case we're going to create a

play08:14

workflow from scratch

play08:16

however

play08:17

as you can see

play08:19

there's all kinds of templates that

play08:21

smartsheet has available to you

play08:24

we're going to go to create from scratch

play08:28

so here is our workflow we're going to

play08:30

title this

play08:35

sign to

play08:37

alert

play08:38

okay

play08:41

so in an automation

play08:43

there's always going to be a trigger

play08:46

and an action and you're also going to

play08:48

be able to add additional conditions as

play08:52

well

play08:53

so our trigger we have a few options

play08:55

here

play08:56

when rows are added or changed

play08:59

uh when a date is reached

play09:01

just when rows are changed or just when

play09:03

rows are added

play09:05

in our case we're going to come down

play09:06

here to when rows are added or changed

play09:13

and we're going

play09:15

to go when the assigned to changes to

play09:20

any value you could also set this

play09:22

condition specifically for yourself or

play09:26

another person on your team

play09:35

now we're going to select our action and

play09:38

there's a large variety of actions that

play09:40

you can choose from

play09:42

in this case we're going to choose to

play09:44

alert someone so this is going to come

play09:46

in the form of an email from smartsheet

play09:50

you could also send an alert to a

play09:52

microsoft teams channel

play09:54

you can alert a slack channel

play09:59

you can generate a document in pdf form

play10:04

request an update

play10:06

request an approval

play10:07

or a variety of other a variety of other

play10:10

things

play10:15

we're going to select alert someone

play10:18

and now with this alert you can choose

play10:20

to send it to specific people whether

play10:23

that be a project manager or someone

play10:25

else

play10:25

or

play10:26

you can send it to

play10:28

contacts in a cell

play10:30

everyone shared to the to the sheet

play10:34

we're going to select contacts in the

play10:36

cell so this alert is going to go to the

play10:38

person

play10:39

that was assigned in that column

play10:42

so we're going to select the field that

play10:46

is the assigned to

play10:48

okay

play10:50

excellent

play10:51

you can also come down here and

play10:53

customize your message with a title

play10:56

you can

play10:59

write a message

play11:01

to go out with the email and you can

play11:03

also select

play11:04

which field so which columns you want to

play11:07

show up in said email

play11:10

we're going to skip that part

play11:13

i'll save this

play11:15

so now that workflow is up and running i

play11:17

can go back to my sheet by hitting this

play11:19

back button up here

play11:22

now let's say down here that

play11:26

i assign charlie roy there we go

play11:30

so you want to hit save

play11:33

and also refresh the sheet

play11:36

and smartsheet will run your automation

play11:40

now the person in this assign to column

play11:44

will get an email that email is going to

play11:46

look something like this

play11:49

here we go

play11:51

it says you have been assigned to a task

play11:53

mark layout on top plate charlie roy and

play11:56

as you can see in this option here i had

play11:58

selected some of the fields that were

play12:00

going to show up

play12:05

okay

play12:07

so you can also use automations to

play12:10

reduce some of the manual data entry

play12:13

that you need to do

play12:15

so let's say that there is an additional

play12:18

task before scheduling a crane that we

play12:20

need to go through

play12:22

i go up here and let's say i add a row

play12:27

and this is my

play12:29

new task

play12:33

now i can use automations to

play12:36

pre-populate some of these fields so

play12:38

that i don't need to go through and

play12:41

check off all of them i'm going to go

play12:43

through how to do that for you

play12:46

so

play12:47

we'll go back up to our automations tab

play12:51

and we're going to once again create a

play12:53

workflow from scratch

play12:55

i will note that i personally just have

play12:58

a preference of creating the workflow

play13:00

from scratch

play13:01

versus using the templates

play13:07

okay

play13:08

so we're gonna create some default

play13:12

values

play13:15

when rows

play13:17

are

play13:18

added okay

play13:25

so i'm going to leave the trigger just

play13:27

as is i'm not going to get specific here

play13:29

so it's just when rows are added or

play13:31

changed actually i'm going to make this

play13:33

just when rows are added

play13:35

and i'm going to

play13:37

just leave it as when any field changes

play13:40

this workflow is going to run

play13:42

when that row is added so that's the

play13:45

trigger you can also

play13:47

set these workflows to run say on an

play13:49

hourly basis or a daily basis or a

play13:52

weekly basis so you can set your set

play13:55

your schedule that way if you don't want

play13:56

to

play13:57

get emails all the time you can get them

play13:59

all in one lump say at the end of the

play14:02

day

play14:07

so i'm going to come down here

play14:09

and

play14:10

rather than say alerting someone like

play14:12

last time we're going to come down

play14:14

and we're going to make a change in our

play14:16

sheet and we're actually going to change

play14:18

a cell value

play14:22

so when i add a new

play14:23

[Music]

play14:25

row to the sheet

play14:27

i'm going to want the percent complete

play14:31

just to populate to zero

play14:35

because it hasn't been started yet i

play14:36

just added it so something to note when

play14:39

you are

play14:42

changing a cell value

play14:44

is

play14:45

that as you can see here it says enter

play14:47

the text you would like the sales value

play14:48

to change to when this automation runs

play14:52

so what you enter here is text

play14:56

so when i enter the number zero

play14:59

it's actually reading it as

play15:01

text versus a value

play15:03

all right and this comes in

play15:06

um in play importantly if you have a

play15:08

column that is uh for instance a percent

play15:10

complete column so if i put in say

play15:15

100 here

play15:18

it would show up as

play15:22

100 percent

play15:23

and if i put in one it would show up as

play15:26

one percent however

play15:29

if we go back to our sheet

play15:33

i'm gonna

play15:34

save this here

play15:36

okay

play15:38

back

play15:39

and i come over to the percent complete

play15:42

column

play15:43

and let's say i put in 100

play15:48

sorry

play15:50

basically if you enter a value in these

play15:52

percent complete columns

play15:55

uh versus having the

play15:56

um

play15:58

like the actual number that you want to

play15:59

appear sometimes when you enter say like

play16:01

100 that would show up as

play16:04

10 000

play16:06

if you understand what i mean so

play16:09

versus putting like 0.3 or 0.4 those

play16:12

would then transfer to 30 or 40

play16:16

so let's go back to our automation

play16:23

go back to that one that we had just

play16:24

created

play16:26

where rows are added

play16:28

we're going to come down to

play16:34

change a cell value

play16:36

so now when rows are added we're going

play16:38

to put percent complete to zero

play16:43

there we go

play16:44

and we're going to change we can select

play16:47

other columns that we want to change as

play16:49

well

play16:50

so we're going to put the

play16:52

status

play16:55

as not started

play16:58

there we go

play17:00

and we'll

play17:02

also

play17:04

put the task type

play17:06

we'll default that to

play17:09

task

play17:10

of course this can be changed at a later

play17:12

date

play17:14

so when rows are added and any field

play17:16

changes

play17:19

we're going to change the cell value in

play17:21

the percent complete column to zero

play17:24

we're going to change the value in the

play17:26

status column to not start it and we're

play17:28

going to change the value in the task

play17:30

type column to task

play17:35

hit save here

play17:39

there we go

play17:41

always good practice to name your

play17:43

workflow as well

play17:45

so

play17:56

there we go next one

play17:59

i'll go back to my sheet

play18:02

and now we're going to try adding a new

play18:04

row again

play18:06

i'll insert above

play18:11

i'm going to put

play18:13

you

play18:19

task one hit enter

play18:21

now

play18:22

the automation

play18:24

does not run

play18:25

until you save and update the sheet

play18:30

and sometimes even then we'll see here

play18:33

it might take just a couple of minutes

play18:35

for it to come along but as you can see

play18:37

here

play18:37

now these cell values have updated

play18:40

without me having to go in and manually

play18:43

do it

play18:45

as you can see these ones are still

play18:47

blank that is because this task was

play18:50

added prior to

play18:52

the automation being in place

play18:54

i'm just going to get that out of there

play18:59

excellent

play19:02

all right so another thing that we

play19:04

really like to do at echo is we like to

play19:06

record dates this is great for tracking

play19:09

down the road

play19:10

this is another um

play19:13

automation option that you have

play19:15

so we're going to go in and create a new

play19:18

automation and what it's going to do is

play19:21

once this

play19:22

um status changes to complete

play19:27

we're going to record a date over here

play19:30

in the complete date record column

play19:34

back over

play19:35

once again we can head up to our

play19:37

automations

play19:39

we're going to create a workflow from

play19:41

scratch

play19:42

now we're going to change our trigger

play19:44

because our trigger is going to be a lot

play19:46

more specific with this one

play19:49

so

play19:50

our trigger is going to be when

play19:53

the status column

play19:56

changes to

play19:58

complete

play20:04

we can come down here for our actions

play20:10

and one of the options is to record a

play20:12

date

play20:15

now it's important that you do have your

play20:17

columns

play20:18

set up as date columns

play20:21

ahead of trying to build your automation

play20:23

because

play20:24

you have to select from a list of

play20:27

date columns

play20:30

so we're going to put it in the complete

play20:31

date record

play20:35

there we go

play20:38

i'm going to put

play20:40

status

play20:41

complete

play20:49

record

play20:51

save

play20:53

excellent so once again we can go back

play20:55

to our sheet here

play20:57

now

play20:58

i come over and i change

play21:01

my status to complete

play21:06

you can see our conditional formatting

play21:08

running

play21:10

i'll refresh it

play21:14

and i should have a date recorded as you

play21:17

can see 8 24 22 that's today

play21:20

in the complete record

play21:23

complete date record

play21:26

excellent

play21:28

right

play21:31

so you can also create automations as

play21:34

well so like as you can see here

play21:37

um whoever is in here may have updated

play21:41

some of these tasks to 100

play21:44

but you can see the discrepancy where

play21:46

the status still says that it is in

play21:48

progress

play21:49

so you can create automations as well

play21:53

just so that you don't run into these

play21:54

inconsistencies in your project plans

play21:57

and create another workflow

play22:00

that

play22:01

when percent complete

play22:09

equals

play22:10

100 percent

play22:14

we can change status

play22:16

to complete

play22:21

once again

play22:22

we can do this when

play22:24

rows are changed

play22:27

and when the

play22:29

percent complete changes to

play22:32

100 percent

play22:40

change your cell value

play22:44

in the

play22:47

status column

play22:52

do complete okay

play22:55

there we go

play22:58

back

play22:59

okay

play23:00

so something to know with automations

play23:04

is that they will run after you have

play23:07

created them

play23:08

so as you can see we still have this

play23:10

discrepancy here

play23:12

that's because our trigger

play23:14

is when this is changed to one hundred

play23:18

percent

play23:19

so this was already at one hundred

play23:20

percent so the trigger didn't run and

play23:23

these are not going to update to

play23:25

complete

play23:26

however if i come down here

play23:29

and i mark this as

play23:31

100

play23:36

save and update it

play23:40

you'll see that the status will then

play23:43

change to complete

play23:46

all right

play23:48

next one so any questions while i still

play23:51

have smartsheet open here or everybody

play23:53

follow along okay

play24:01

all righty

play24:06

great well thanks everybody for uh

play24:09

joining in on this webinar today i hope

play24:12

that you got something out of it like i

play24:13

said we will be making a recording of

play24:16

this webinar available to all of you

play24:19

please feel free to reach out if you

play24:20

have any questions

play24:22

regarding conditional formatting or

play24:24

automations and how you can use that

play24:27

within your smartsheet

play24:29

if you enjoyed this webinar please check

play24:31

out some of echo consulting's upcoming

play24:33

webinars we have one on risk management

play24:36

techniques utilizing a crate log that's

play24:39

coming up on september 7th

play24:42

and

play24:44

we have another one coming up on

play24:45

september 21st that is best practices

play24:48

for leading impactful meetings

play24:54

we will uh also make a copy of this

play24:57

slide deck available to you all at the

play24:59

end so you have this information here

play25:04

thanks for joining