Learning Network Cable Management - A Small Business Open Frame Rack Build
Summary
TLDRIn this instructional video, Derek from TCI demonstrates network cable management for a small office setup. With 73 Cat6 wires to organize, he begins by retrieving cables from the ceiling, then constructs chase pipes for a clean transition into the backboard frame. He meticulously labels, combs, and tapes the cables, emphasizing the importance of a professional appearance. Derek mounts an open frame rack, installs patch panels, and carefully manages cable lengths. He also highlights the use of cable managers and proper termination techniques. The video concludes with the installation of switches, a router, and the neat patching of all connections, showcasing a clean and organized network rack.
Takeaways
- 👷 Derek from TCI is guiding viewers on how to manage network cables in a small office setting.
- 🏢 The project involves managing approximately 73 Cat6 wires for a small office with 25 people and printers.
- 🛠️ Derek emphasizes the importance of using the right tools and safety measures, like using an appropriately sized ladder.
- 📏 The use of a Chase pipe is highlighted as a method to create a clean and professional transition for cables from the ceiling to the wall.
- 🔖 Labeling and organizing cables is crucial for a systematic approach to cable management.
- 📝 The process involves combing and reordering cables to ensure a neat and organized setup.
- 🔩 Derek demonstrates how to install a rack and secure it to a backboard using screws and washers.
- 📡 Proper cable management is shown through the use of velcro, cable combs, and saddle straps to secure cables.
- 🛠️ Terminating cables is done using an all-in-one crimping tool, which is recommended for beginners to reduce mistakes.
- 🔄 The video covers the entire process from cable installation to the setup of switches, routers, and cable managers for a clean and professional finish.
Q & A
What is the purpose of the video?
-The purpose of the video is to educate viewers on network cable management by demonstrating the process of setting up a small office network with Cat6 cables.
How many wires were left for Derek to terminate?
-Derek had to terminate approximately 73 wires that the installers had left.
What is a Chase pipe and why is it used?
-A Chase pipe is a four-inch pipe used to create an entry path from the ceiling space, called the plenum area, into the lower space. It's used to maintain a clean and professional appearance by avoiding ragged holes in the ceiling tiles.
Why does Derek prefer to use a grommet or a Chase pipe when making holes for cables?
-Derek prefers to use a grommet or a Chase pipe to indicate that the hole was intentionally made for cable management, which increases the professionalism of the final product.
What is the first step Derek takes after installing the Chase pipes?
-The first step Derek takes after installing the Chase pipes is to remove the tape on the Cat6 cables that the installers left behind.
How does Derek organize the Cat6 cables?
-Derek organizes the Cat6 cables by labeling them, combing them in groups of 24, and then securing them with Velcro as he pulls them downwards to create a neat bundle.
What is the purpose of the rack that the client supplied?
-The purpose of the rack is to mount and organize network equipment and cables. It's a 12 rack unit open frame with tapped holes instead of cage nuts.
How does Derek secure the frame to the wall?
-Derek secures the frame to the wall by first drilling a single screw on the upper left, then placing the frame's first hole over that screw to hold the weight while he levels it and installs additional screws with washers.
What is the role of the patch panels in the network setup?
-The patch panels are used to organize and terminate the Cat6 cables, allowing for easy connections and reconfigurations of the network.
How does Derek manage the cable slack after termination?
-After termination, Derek rolls the slack back up into the ceiling and secures it with additional Velcro to keep it out of sight and maintain a clean appearance.
What is the final step Derek takes to ensure a clean and professional appearance of the network rack?
-The final step Derek takes is to install cable managers, patch cords, switches, and a router, ensuring that all cables are neatly organized and no extraneous cables are visible.
Outlines
This section is available to paid users only. Please upgrade to access this part.
Upgrade NowMindmap
This section is available to paid users only. Please upgrade to access this part.
Upgrade NowKeywords
This section is available to paid users only. Please upgrade to access this part.
Upgrade NowHighlights
This section is available to paid users only. Please upgrade to access this part.
Upgrade NowTranscripts
This section is available to paid users only. Please upgrade to access this part.
Upgrade NowBrowse More Related Video
Everything I Learned About Home Networking - A Newbie’s Perspective
How To Strip and Terminate Coaxial Cable
Network Tools - CompTIA A+ 220-1101 - 2.8
How a Few Undersea Cables Connect the Entire Internet
Getting Started in Cisco Packet Tracer - 2023
How to Access CCNA Physical Racks: Step-by-Step Guide for Beginners! | #networkershome
5.0 / 5 (0 votes)