New Home Rough-In Stage (2020)
Summary
TLDRBoris the Builder from London Foam Construction updates on a three-story building project in Brisbane. The frame and roof are completed, moving to the 'roughing' stage where essential services are installed behind walls, ceilings, and floors. This includes plumbing, electrical work, air-conditioning, and gas lines. Plumbing is prioritized, followed by electrical wiring for power, telecommunication lines, and smart home systems. Ducted air conditioning is also integrated. Once all roughing components are inspected and adjusted, the project moves to internal plastering.
Takeaways
- 🏗️ The video is about the 'roughing' stage of construction in a three-story building in Brisbane.
- 🛠️ The roughing stage involves installing hidden services such as plumbing, electrical, air-conditioning, and others behind the walls, ceiling, and floor systems.
- 💧 Plumbing is the first service to be installed, starting with vertical stacks that connect all points from the laundry, kitchen, and bathrooms to the under slab waste plumbing system.
- 🚰 Water supply pipes are then installed to provide fresh water to showers, basin taps, kitchen mixers, toilets, and external taps.
- 🔥 If required, gas lines for natural or LPG gas are installed to supply cooktops, hot water systems, external barbecues, and fireplaces.
- 🔌 Electrical roughing follows, with power cables running from the external meter box to the internal switchboard and throughout the house to various fixtures.
- 📺 Along with power cables, telecommunication lines, TV antenna cables, NBN provisions, intercoms, security systems, and exhaust ducts are also installed.
- 🌡️ Concealed air conditioning components, most commonly ducted systems, are installed during the electrical roughing, with insulated ducts run throughout the sealing spaces.
- 🔄 The ducted air conditioning system has a central control unit that can be integrated with a smart home setup for seamless control.
- 🔍 After all roughing components are completed, a careful inspection is conducted to make necessary adjustments and changes.
- 🛋️ The completion of the roughing stage prepares the building for the next phase, which is internal plastering.
Q & A
Who is Boris the Builder and what is his profession?
-Boris the Builder is a professional involved in the construction industry, specifically in foam construction, and he is based in London.
What is the current status of the three-story building in Brisbane mentioned in the script?
-The three-story building in Brisbane has its frame and roof completed, providing some protection from the elements, but the construction process is not yet finished.
What does the term 'roughing' refer to in the construction process?
-In construction, 'roughing' refers to the stage where all the hidden services, such as plumbing, electrical, and air-conditioning, are installed behind the walls, within the ceiling space, and within the floor system.
Why is the roughing stage considered important in construction?
-The roughing stage is important because it is the last point at which clear access to the house frame is available before the internal linings are installed, making it crucial to plan and execute each aspect carefully.
What are the main services that are installed during the roughing stage?
-The main services installed during the roughing stage include plumbing, electrical systems, air-conditioning, and other necessary utilities that will make the home comfortable and functional.
Why are plumbing pipes installed first during the roughing stage?
-Plumbing pipes are installed first during the roughing stage because they can be bulky, require specific positioning, and need to be installed with appropriate force.
What are 'stacks' in the context of plumbing during the roughing stage?
-'Stacks' refer to the vertical runs of pipes that extend from the under-slab waste plumbing to the upper floor bathrooms, connecting various points such as the laundry, kitchen, and every bathroom.
What is the role of water supply pipes during the roughing stage?
-Water supply pipes are responsible for feeding fresh water to showers, basin taps, kitchen mixers, toilets, and external taps in the home.
How does the electrical roughing process work in a construction project?
-During the electrical roughing process, power cables are installed from the external meter box to the internal switchboard and throughout the house, branching off to supply power to lights, fans, switches, power points, appliances, and other fixtures.
What are the components of a ducted air conditioning system that might be installed during the roughing stage?
-The components of a ducted air conditioning system installed during the roughing stage include insulated ducts that are run throughout the sealing spaces and connected to rooms as required, along with a central control unit to manage the system.
What is the final step after completing all the roughing components in a construction project?
-The final step after completing all the roughing components is to carefully inspect the work, make any necessary adjustments and changes, and then proceed to the internal plastering stage.
Outlines
Dieser Bereich ist nur für Premium-Benutzer verfügbar. Bitte führen Sie ein Upgrade durch, um auf diesen Abschnitt zuzugreifen.
Upgrade durchführenMindmap
Dieser Bereich ist nur für Premium-Benutzer verfügbar. Bitte führen Sie ein Upgrade durch, um auf diesen Abschnitt zuzugreifen.
Upgrade durchführenKeywords
Dieser Bereich ist nur für Premium-Benutzer verfügbar. Bitte führen Sie ein Upgrade durch, um auf diesen Abschnitt zuzugreifen.
Upgrade durchführenHighlights
Dieser Bereich ist nur für Premium-Benutzer verfügbar. Bitte führen Sie ein Upgrade durch, um auf diesen Abschnitt zuzugreifen.
Upgrade durchführenTranscripts
Dieser Bereich ist nur für Premium-Benutzer verfügbar. Bitte führen Sie ein Upgrade durch, um auf diesen Abschnitt zuzugreifen.
Upgrade durchführenWeitere ähnliche Videos ansehen
PLUMBING SYSTEMS - PART 1
Sistem Utilitas / MEP (Mekanikal Elektrikal Plambing) pada Perancangan Bangunan Tinggi
Renovar um apartamento! Básicos e valores !
Transformational Building Technologies - DFMA (Prefab MEP) and BIM
Siding, Windows & Doors Installation (COST REVEALED!) | 60 Day Home Build Challenge!
Central air conditioning system working Animation
5.0 / 5 (0 votes)