TLDRThe video script details a meticulous 10-day engine overhaul process aboard a ship. It focuses on the number three generator engine, involving the disassembly of hundreds of parts including cylinder covers, pistons, and valves. The narrative emphasizes the importance of careful planning, preparation, and coordination. The team meticulously cleans, replaces worn components, and checks for cracks, concluding with a thorough cleaning and re-lubrication of the engine. This technical procedure is made accessible by the crew's expertise and prior review of engine schematics, promising a continuation of the overhaul journey in subsequent videos.
Takeaways
- 🛠️ The script describes an engine overhaul process, specifically for a ship's number three generator engine.
- 🔧 The overhaul involves dismantling and reassembling hundreds of parts, requiring careful planning and coordination.
- 📅 The process is expected to take about four to five working days to complete.
- 🧰 The cylinder covers and pistons are key components that will be removed, cleaned, and have worn parts replaced.
- 🔄 The piston rings will be replaced, and the piston crowns will be cleaned or carbonized as part of the maintenance.
- 🔍 A crack check will be performed on the piston crowns, connecting rods, bolts, and bearings to ensure safety and reliability.
- 💧 Old lubricating oil will be drained from the crankcase, and the engine will be cleaned and refilled with fresh oil.
- 🔩 The script emphasizes the importance of organizing small parts like nuts and bolts to prevent loss or confusion.
- 📚 Engineers have prepared for the task by reviewing schematics and planning the course of action before starting the overhaul.
- 🛑 Electronic parts, such as thermocouples for exhaust gas, need to be disconnected before proceeding with the engine disassembly.
- 🔧 The hydraulic nuts securing the cylinder covers require special attention due to the high torque needed for their removal and installation.
Q & A
What is the purpose of the overhaul of the number three generator engine?
-The purpose of the overhaul is to dismantle, clean, replace worn or damaged components, and ensure the engine operates efficiently and safely.
How long is the estimated time to complete the overhaul of the generator engine?
-The estimated time to complete the overhaul is about four to five working days, depending on conditions.
What is the first step in the overhaul process described in the script?
-The first step is to loosen all the attachments before pulling out the bigger parts and disconnecting some electronic parts like the thermocouples for the exhaust gas.
Why is careful planning, preparation, and coordination required for the overhaul of the generator engine?
-Careful planning, preparation, and coordination are required because the job involves dismantling hundreds of parts, ensuring that none are lost or mixed up with parts from other cylinders.
How are the dismantled parts managed to avoid confusion during the overhaul process?
-The dismantled parts for each cylinder are collected in marked containers to ensure that parts are not mixed with those from other cylinders.
What components are removed from the cylinder covers for cleaning and replacement?
-The components removed from the cylinder covers include the exhaust and intake valves and the fuel injection valves, which are cleaned and replaced as necessary.
What is done to the piston rings and piston crowns during the overhaul?
-The old piston rings are removed, the piston crowns are cleaned or carbonized, and new piston rings are installed. A crack check is also performed on the piston crowns and connecting rod.
What is the procedure for dealing with the old lubricating oil from the crankcase?
-The old lubricating oil is drained from the crankcase, the crankcase is cleaned, and then it is refilled with fresh lubricating oil.
How are the cylinder covers secured to the engine frame and how are they loosened?
-The cylinder covers are secured to the engine frame by nuts tightened with intense torque. Hydraulic pressure is needed to release or tighten these nuts.
What is the significance of the engine Workshop in the overhaul process?
-The engine Workshop is where the cylinder covers are taken for further dismantling of components like intake and exhaust valves and for cleaning the internal chambers.
What is the final step described in the script for the overhaul process?
-The final step described is assembling everything back to its original state after all parts have been cleaned, replaced, and checked for cracks.
Outlines
🛠️ Overhauling the Number Three Generator Engine
The video details the process of overhauling a generator engine, which will take about 10 days. The task involves dismantling hundreds of parts, including the top covers, cylinder covers, and pistons. The process includes removing and cleaning the exhaust and intake valves, replacing piston rings, and conducting checks on various components. The old lubricating oil is drained and replaced. The entire job is expected to take around four to five working days.
🔧 Dismantling Small Parts and Cylinder Covers
Engineers begin by dismantling small parts like nuts, bolts, and electronic components. The rocker arms and fuel injectors are also removed. Care is taken to avoid losing any parts, with dismantled components stored in marked containers. The cylinder covers are secured with hydraulic nuts, requiring hydraulic pressure to release. Once removed, the cylinder covers reveal the carbon-covered piston crowns.
🧰 Loosening Piston Rod Bolts and Initial Cleaning
The connecting rod, composed of a piston rod and bearing caps, is loosened to disconnect the piston rod from the bearing caps. Initial cleaning of the piston crown is performed with a wire brush. After loosening and removing the bolts, the pistons are pulled out and placed on racks for easier handling. The overhauling process is manageable with proper education, training, and experience. The next steps will involve removing cylinder liners and bearing caps.
Mindmap
Keywords
💡Overhaul
💡Generator Engine
💡Cylinder Covers
💡Pistons
💡Fuel Injectors
💡Hydraulic Nuts
💡Lubricating Oil
💡Crankcase
💡Exhaust Valves
💡Thermocouples
Highlights
Scheduled overhaul of generator engine number three is underway.
The overhaul involves dismantling hundreds of parts, including top covers, cylinder covers, and pistons.
Exhaust and intake valves, as well as fuel injection valves, are removed, cleaned, and replaced as needed.
Old piston rings are replaced with new ones, and the piston crowns are cleaned and checked for cracks.
The connecting rod, connecting rod bolts, and bearings are inspected and maintained.
Old lubricating oil is drained from the crankcase, which is then cleaned and refilled with fresh oil.
Careful planning and coordination are emphasized due to the large number of small parts involved.
Parts from each cylinder are stored in marked containers to avoid mixing.
Engineers use schematics and a well-planned course of action to facilitate the overhaul.
Hydraulic pressure is required to loosen the hydraulic nuts securing the cylinder covers.
Cylinder covers are taken to the workshop for further dismantling and cleaning of the internal chambers.
Initial cleaning of the piston crown is performed using a wire brush before further inspection.
The overhaul process is systematic and relies on the engineers' training and experience.
All pistons were successfully removed in approximately six working hours.
Future tasks include removing the cylinder liners and bearing caps as part of the complete overhaul.
Transcripts
[Music]
foreign
[Music]
port and is currently underway
[Music]
it will take about 10 days before we
reach our next destination
this gives us plenty of time to carry
out the scheduled overhaul of one of our
generator engines
it is a job that involves dismantling
hundreds of parts so careful planning
preparation and coordination is required
[Music]
so today we are scheduled to overhaul
our number three generator engine
so when I say overhaul that means we'll
be removing all of the top covers the
cylinder covers
and also the Pistons
for the cylinder covers we will later on
dismantle them remove the exhaust and
intake valves and the fuel injection
valves clean them and replace the
components that need replacing
as for the Pistons we will take out the
old piston rings clean up or the
carbonize the Piston crowns and replace
the old piston rings with new spares as
well as do a crack check on the Piston
crowns and also for the connecting rod
connecting rod bolts and also the
bearings
and then we will drain all of the old
Lube oil from the crankcase
clean it and then recharge it with fresh
lubricating oil
after that we will assemble everything
back to its original state all in all
this will take about four maybe five
working days depending on the conditions
but I'm pretty sure we'll be we'll be
able to finish it in about four days
so
let's check it out
as mentioned earlier this job involves
dismantling many parts and a lot of them
are small Nuts and Bolts
so before we get to pull out the bigger
parts we need to loosen all the
attachments first
we also have to disconnect some
electronic parts mainly the
thermocouples for the exhaust gas
before we could take out the cylinder
covers we will need to dismantle the
rocker arms as well as the fuel
injectors and its attachments
for each cylinder alone we will already
need to dismantle dozens of small parts
so we need to be very careful not to
drop or lose any of them
as you can see we collect all the
dismantled parts for each cylinder in
marked containers so as not to mix Parts
with the other cylinders
the sheer number of small parts might
seem intimidating but for us Engineers
we have studied this in school and for
the more experienced ones we have done
this many times over the years
also days before starting the overhaul
we have already reviewed the schematics
and planned our course of action
simultaneously the crankcase doors are
opened and the old lubricating oil is
suctioned out of the sump tank and
drained into the sludge tank
foreign
once the rocker arms and fuel injectors
and other attachments are removed from
the cylinder covers it's time to loosen
the hydraulic nuts
the cylinder covers are firmly secured
to the engine frame by nuts that are
tightened with intense torque
hydraulic pressure is needed in order to
release or tighten these nuts
foreign
now we are ready to pull out the
cylinder covers
the cylinder covers actually take the
most time during dismantling and
assembling as they have a lot of small
attachments as we have seen earlier
but once the cylinder covers are ready
to be lifted it's all downhill from
there
as soon as the covers are lifted we can
already get a glimpse of the surface of
the Piston crown
as you can see it's covered in carbon
the cylinder covers will then be brought
to the engine Workshop
there the intake and exhaust valves will
be dismantled and the internal Chambers
cleaned
now it's time to loosen the Piston Rod
bolts
foreign
the connecting rod is an assembly
composed of a piston rod and the bearing
caps
so for the purpose of pulling out the
Piston we only need to loosen the Piston
Rod bolts and disconnect the Piston rod
from the bearing caps
foreign
while loosening initial cleaning of the
Piston Crown is done using a wire brush
after the bolts are loosened and removed
the Pistons are now ready to be pulled
out
foreign
[Music]
the Pistons will be placed on the rack
where they will be easier to work with
overhauling the generator engine might
seem like a complicated task but proper
education training and experience will
make it quite easy
from the time that we started
dismantling we managed to pull out all
the Pistons in about six working hours
foreign
we will continue with the overhaul and
I'll be showing you how we remove the
cylinder liners and the bearing caps as
well as the other remaining tasks
involved in the overhauling of the
generator engine
[Music]
thank you for watching and stay tuned
for the next one
Voir Plus de Vidéos Connexes
5.0 / 5 (0 votes)