cara pasang rangka hollow plafon gypsum
Summary
TLDRThis tutorial guides viewers step-by-step on how to install a hollow frame for a gypsum ceiling. Starting with the preparation of materials and tools, the video demonstrates how to measure, level, cut, and secure the hollow profiles for both horizontal and vertical framing. It also covers the installation of ceiling hangers and the importance of spacing them correctly for added stability. The tutorial emphasizes clear instructions and practical tips, ensuring viewers can easily follow along to achieve a sturdy, professional ceiling installation.
Takeaways
- đ Prepare all necessary materials and tools before starting the installation process, including hollow profiles, measuring tape, drill, hammer, and screws.
- đ Start by marking the level for the ceiling frame using a level tool, ensuring a precise and even height.
- đ Cut the hollow steel profiles (2x4 and 4x4) to the required lengths based on the dimensions of the gypsum sheets (typically 240 cm).
- đ Secure the hollow profiles to the wall by nailing them at intervals of 50-60 cm to ensure stability and strength.
- đ Install horizontal hollow profiles at 60 cm intervals to form the frame structure, ensuring correct alignment and support for the gypsum sheets.
- đ Repeat the same process on both the left and right edges of the ceiling, making sure to keep the profiles level and consistent.
- đ Create a guiding pattern between the right and left hollow profiles to ensure uniformity across the entire ceiling installation.
- đ After positioning the hollow profiles, screw the 4x4 profiles securely into place to create a sturdy frame that will support the gypsum ceiling.
- đ Install suspension hooks at 120 cm intervals (or 90 cm for additional strength) to support the weight of the gypsum sheets.
- đ Ensure all screws and nails are tightly secured, checking for stability and durability before moving forward with the gypsum sheet installation.
Q & A
What is the purpose of using hollow sections in ceiling installation?
-Hollow sections are used to create a framework for securing gypsum ceiling panels. They help provide a solid support structure for the gypsum, ensuring stability and strength.
What tools and materials are required to install a hollow frame for gypsum ceiling?
-The required tools and materials include a measuring tape, drill, hammer, scissors, concrete nails, gypsum screws, a hollow section (2x4 and 4x4), and a level.
How do you ensure the correct height for the hollow frame installation?
-The correct height is ensured by using a level and measuring the distance from a reference line, which can be measured either from the top or the bottom for accuracy.
What is the recommended distance between nails for securing the hollow sections?
-The nails should be spaced approximately 50-60 cm apart to ensure the hollow frame is securely attached and strong enough to hold the gypsum.
Why is it important to measure the 60 cm distance when installing the hollow frame?
-The 60 cm distance between the hollow frame sections is crucial for maintaining the correct alignment and ensuring the proper support for the gypsum panels, particularly when the panels are 240 cm long.
What is the purpose of the 4x4 hollow section in this installation process?
-The 4x4 hollow section is used to create connections at the ends of the gypsum panels, helping to maintain the overall structure and alignment of the ceiling.
How do you install the suspension system for the ceiling frame?
-To install the suspension system, you first measure the distance from the wall (typically 1 meter for strength) and attach the suspension hangers to the hollow frame. The hangers should be secured to the ceiling with screws, and their spacing should not exceed 120 cm for optimal support.
How do you ensure the stability of the suspension system once installed?
-The stability is ensured by making sure the suspension hangers are spaced correctly (no more than 120 cm apart) and securing them firmly to the ceiling with screws. Additionally, attaching the suspension hangers to the concrete ceiling beams or supports is essential for long-term stability.
What is the importance of creating a pattern or guide for the hollow frame sections?
-Creating a pattern helps ensure the hollow frame sections are aligned properly across the entire ceiling. It acts as a visual guide, helping to maintain uniform spacing and proper structural integrity.
What should you do after securing the hollow frame and suspension hangers?
-After securing the hollow frame and suspension hangers, the next step is to check the alignment and level of the frame. Then, the gypsum panels can be installed by attaching them to the frame, ensuring they are properly secured with gypsum screws.
Outlines
Cette section est réservée aux utilisateurs payants. Améliorez votre compte pour accéder à cette section.
Améliorer maintenantMindmap
Cette section est réservée aux utilisateurs payants. Améliorez votre compte pour accéder à cette section.
Améliorer maintenantKeywords
Cette section est réservée aux utilisateurs payants. Améliorez votre compte pour accéder à cette section.
Améliorer maintenantHighlights
Cette section est réservée aux utilisateurs payants. Améliorez votre compte pour accéder à cette section.
Améliorer maintenantTranscripts
Cette section est réservée aux utilisateurs payants. Améliorez votre compte pour accéder à cette section.
Améliorer maintenantVoir Plus de Vidéos Connexes
Cara pasang Plafon PVC Drop ceiling berongga, Renov ruang tamu part.04
cara membuat dan pasang pintu sliding aluminium
CARA INSTALL WINDOWS 10 PRO 2021 - LENGKAP (Cara Download, Buat Bootable,Cara Install, Cara Partisi)
TUTORIAL pasang papan gypsum plafon sendirian.
Tutorial Lengkap Cara Tap dan Snei
How to Make a Hydroganic/Aquaponic Installation with Tilapia Fish Ponds
5.0 / 5 (0 votes)