SOP 2 PELEBARAN PERKERASAN
Summary
TLDRThe transcript outlines standard operational procedures for road widening and strengthening projects. It details the process of adding width and strength to existing roads according to operational plans, including alignment correction, excavation and disposal of existing materials, and installation of foundation layers. The script emphasizes the importance of meeting design specifications, obtaining directorial approval for material use, and ensuring safety measures are in place. It also discusses the need for proper mixing of new and old materials, maintaining surface conditions, and conducting quality control tests to ensure the road's stability and durability.
Takeaways
- ⚠️ The process involves expanding and strengthening the width of an old road according to standard operational procedures.
- 🛠️ Work includes adding width to the existing road to meet the required traffic lane width as shown in the plan or directed by the board.
- 🔍 Alignment improvement work is necessary to straighten roads and reduce curves and crests.
- 🚧 Excavation and removal of existing materials, as well as trimming the edges of the road, are part of the preparation for the expansion work.
- 🏗️ Installation of a base layer, aggregate, and asphalt layers are required according to the lines and dimensions provided in the drawings or approved by the board.
- 👷♂️ Work begins based on specifications, work drawings or details, design, and approval to start work from the project.
- 🚧 Traffic control measures, including temporary signs and barriers, are implemented when road shoulder work is part of the expansion.
- 🌳 Tree felling is only carried out if absolutely necessary for the road expansion and must be replaced with new plantings.
- 📏 The contractor must maintain the surface of the prepared base in a dry and stable condition until the required asphalt application.
- 🔬 Quality control is emphasized through frequent testing of materials, including plastic index tests, gradation tests, and density tests.
Q & A
What does the term 'pelebaran perkerasan' refer to in the context of the script?
-In the context of the script, 'pelebaran perkerasan' refers to the process of widening and strengthening an existing road according to the standard operational procedure plan.
What are the main activities included in the road widening and strengthening project?
-The main activities include adding width to the existing road, alignment correction, excavation and removal of existing materials, edge trimming, installation of base layers, and ensuring good soil base conditions for the work.
What is the purpose of alignment correction in the road widening process?
-The purpose of alignment correction is to make the road straighter and reduce curves and crests at bends or on gradients to improve road safety and efficiency.
What are the requirements for the materials used in the road widening and strengthening work?
-The materials used must be approved by the director and should not be mixed with the excavated materials. They must also meet the specifications and design requirements, including proper compaction and quality control.
How is the excavation depth determined for the road widening and strengthening project?
-The excavation depth is determined according to the plan shown in the drawings or as directed by the director, and it must be in accordance with the specifications.
What is the significance of the edge trimming process in road construction?
-Edge trimming is significant as it ensures that the exposed edges of the road are hard, stable, and free from cracks or other instabilities, creating a clean vertical surface that meets the specified requirements.
What are the specifications for the width of the road widening work?
-The width of the road widening must be sufficient to accommodate the required traffic lanes as per the design shown in the drawings or as directed by the director.
What is the minimum practical width for road widening as mentioned in the script?
-The minimum practical width for road widening mentioned in the script is 0.5 meters. If the theoretical required width is less than 0.5 meters but more than 0.3 meters, the 0.5-meter width must be implemented.
What are the conditions under which no road widening work is necessary?
-No road widening work is necessary if the theoretical required width is less than 0.3 meters.
What are the requirements for surface preparation before the road widening and strengthening work?
-The surface must be prepared, compacted, and inspected as required by the specifications. The contractor must maintain the surface in a dry and stable condition until the required paving for the widening and strengthening is done.
What are the quality control measures for the asphalt layer in the road widening project?
-Quality control measures include conducting a minimum number of tests for plastic index, gradation, and density, and ensuring that the asphalt layer meets the dimensional tolerances, compaction, and thickness requirements as specified.
Outlines
🚧 Road Expansion and Reinforcement Works
The paragraph discusses the standard operational procedures for road expansion and reinforcement works. It covers tasks such as adding width and strength to existing roads according to operational plans. The process includes improving road alignment to make roads straighter and reducing curves and crests, excavation and removal of existing materials, and preparing the subgrade for good conditions. It also details the installation of foundation layers, aggregates, and base courses according to given dimensions and specifications. The paragraph emphasizes the importance of safety measures for personnel and the surrounding environment, as well as the need for temporary traffic signs during construction. It also specifies the requirements for the approval of materials and the execution of work based on specifications and design details.
🌳 Road Widening and Tree Felling Procedures
This paragraph focuses on the procedures for road widening, including the preparation of the road surface, the minimum practical width requirements, and the conditions under which theoretical widths less than certain measurements necessitate specific actions. It also addresses the need for tree felling when necessary for road expansion, with a stipulation that felled trees must be replaced with new plantings. The paragraph outlines the requirements for the dimensions and geometry of the road expansion area, the maintenance of surface conditions by contractors, and the inspection of prepared surfaces before the application of materials. It also discusses the quality control measures, including the frequency of tests for plastic index, gradation, and density, and the conditions for the application of asphalt layers, ensuring they meet dimensional and density tolerances as per operational standards.
🛠 Asphalt Laying and Road Repair Standards
The final paragraph outlines the standards for laying asphalt and repairing roads. It discusses the use of various asphalt mixtures and the conditions under which temporary traffic signs are removed and the road is reopened. It also covers the procedures for asphalt layer inspection, including the frequency of density tests and the use of core or field tests. The paragraph specifies the tolerances for thickness and density that must be met, as well as the quality control measures that must be in place. It also describes the process for the application of asphalt layers, including the use of mechanical compactors and the requirements for the surface preparation before laying the asphalt. The paragraph concludes with the steps for the final opening of the road to traffic after all repairs and inspections have been completed and approved.
Mindmap
Keywords
💡Standard Operating Procedure
💡Road Widening
💡Strengthening
💡Alignment Improvement
💡Excavation and Embankment
💡Subgrade Preparation
💡Foundation Layer
💡Traffic Control
💡Safety Equipment
💡Environmental Considerations
💡Quality Control
Highlights
The process involves expanding and strengthening the width of old roads according to standard operational procedures.
The expansion work includes adding width to the existing road to meet the required traffic lane width as shown in the design or directed by the board.
Improvement works are carried out to align the road more straightly and to reduce curves and crests on slopes.
Excavation and removal of existing materials are part of the process to prepare the road for expansion.
The road edge is trimmed to ensure a hard, stable, and undamaged surface to form a clean vertical edge.
Installation of a temporary road base layer is required according to the lines and dimensions given in the plan or approved by the board.
The commencement of expansion and strengthening work is based on specifications, work drawings, or design details, and approval to start work.
Safety equipment must be used by all personnel involved, and the work environment must be kept safe.
Temporary traffic signs are installed when road shoulder work is part of the road expansion.
Materials to be used for expansion must first get approval from the board.
The excavation for expansion must provide enough space for normal compaction equipment such as rollers.
If the width of the excavation exceeds the required expansion width, the excavated material must be refilled and compacted with new material.
The materials used for expansion must not be mixed with the excavated material unless approved by the board.
The depth of excavation must be in accordance with the plan, and excavated materials should not be used for expansion unless approved.
Mixing of new and old materials is generally not allowed unless the old material is of good quality and the board allows it.
The expansion and strengthening work must meet all dimensional tolerances and quality requirements specified in the specifications.
The road edge must be trimmed to a stable and undamaged surface to form a clean vertical edge according to specifications.
The width of the expansion must be sufficient for the traffic lane width as per the design shown in the plan or as directed.
The actual required width of expansion varies along the road, and the minimum practical width is considered to be 0.5 M.
If the theoretical required width of expansion is less than 0.3 M, no expansion work is needed.
The surface of the expansion area must be prepared, compacted, and inspected as required by the specifications.
The contractor must maintain the surface in a dry and stable condition until the required expansion is filled with material.
Tree felling is only carried out if absolutely necessary for the road expansion, and felled trees must be replaced.
The dimensions and geometry of the expansion area must meet the specifications and have the required density.
The contractor must repair any part of the expansion area that does not meet the requirements or is damaged.
The asphalt layering process must comply with the specifications regarding production, application, and compaction.
The asphalt layer must meet dimensional tolerances, compaction, and density requirements as specified.
The final stage involves the removal of temporary work and cleanup or restoration of the site.
The last step is the opening of temporary traffic signs.
Transcripts
standar operasional prosedur pekerjaan
pelebaran perkerasan lebaran perkerasan
adalah pekerjaan menambah lebar
perkerasan pada jalan lama sesuai dengan
rencana standar operasional prosedur
pelebaran perkerasan mencakup pekerjaan
pekerjaan sebagai berikut penambahan
lebar perkerasan lama sampai lebar jalur
lalu lintas yang diperlukan dalam
rancangan yang ditunjukkan pada gambar
atau yang diperintahkan direksi
pekerjaan perbaikan alinyemen demikian
hingga sungguh Jalan menjadi lebih lurus
dan lengkung pada tikungan maupun pada
puncak tanjakan dapat dikurangi
penggalian dan pembuangan bahan yang ada
pemangkasan tepi perkerasan jalur lalu
lintas lama sampai bahan yang keras
senyap dan pemeliharaan kondisi formasi
tanah dasar yang baik untuk pekerjaan
pelebaran pemasangan lapis pondasi
agregat dan lap
seasonal menurut garis dan dimensi yang
diberikan dalam gambar atau yang
disetujui oleh direksi pekerjaan
pelaksanaan pekerjaan pelebaran
perkerasan dimulai berdasarkan
spesifikasi dan gambar kerja atau detail
desain serta persetujuan untuk mulai
kerja dari bijektif pekerjaan penggunaan
perlengkapan keselamatan kerja baik bagi
setiap personil yang terlibat maupun
lingkungan kerja dan sekitarnya
pemasangan rambu lalu lintas sementara
apabila pekerjaan bahu Jalan merupakan
bagian pelebaran jalan bahan yang akan
digunakan harus terlebih dahulu mendapat
persetujuan dari direksi pekerjaan
pembentukan badan jalan meliputi
pekerjaan satu lebar galian dan
penggalian bahan yang ada dengan
ketentuan sebagai berikut galian untuk
pelebaran perkerasan harus
menyediakan ruang gerak yang cukup untuk
alat penggilas atau roller normal
bilamana lebar kalian melebihi lebar
pelebaran perkerasan yang diperlukan
maka bahan galian tersebut harus
diisikan kembali dan dipadatkan
bersama-sama dengan setiap bahan yang
akan digunakan untuk pelebaran
perkerasan bahan yang digunakan untuk
pelebaran perkerasan tidak boleh
bercampur dengan bahan galian yang
diisikan kembali kedalaman penggalian
harus sesuai dengan yang ditunjukkan
dalam gambar rencana bahan galian tidak
boleh digunakan sebagai bahan untuk
pelebaran perkerasan baik langsung
ataupun dicampur dengan bahan lain
kecuali jika disetujui oleh direksi
pekerjaan dua pencampuran berbutir yang
baru dan lama dengan ketentuan
pencampuran di tempat antara bahan
berbutir yang baru dengan lama umumnya
tidak diperkenankan bilamana Bang jangan
lama tampak atau
ketahui terbuat dari bahan agregat yang
baik maka direksi pekerjaan dapat
memerintahkan kontraktor menggali lubang
uji atau speed untuk memastikan mutu
penghujan lama dapat digunakan dan
dicampur dengan bahan yang baru dan
dipadatkan kembali bilamana telah
dilaksanakan dengan cara ini pekerjaan
pelebaran perkerasan tetap harus
memenuhi semua toleransi dimensi dan
mutu yang disyaratkan dalam spesifikasi
VGA pemangkasan tepi jalur lalu lintas
dengan ketentuan tepi perkerasan jalur
lalu lintas yang terekspos harus
dipangkas sampai mencapai banyak yang
keras yang tidak lepas atau retak atau
ketidakstabilan lainnya untuk membentuk
permukaan vertikal yang bersih memenuhi
ketentuan yang spesifikasi tentang
pelaksanaan pengembalian kondisi dan
pekerjaannya keempat lebar pekerjaan
pelebaran dengan ketentuan lebar
pelebaran perkerasan harus cukup untuk
lebaran
hai lalu lintas sesuai dengan lebar
rancangan sebagaimana yang ditunjukkan
dalam gambar atau sebagaimana
diperintahkan Jack pekerjaan serta
pelebaran tambahan yang cukup sehingga
memungkinkan setiap lapisannya gempar
bertangga terhadap lapisan dibawahnya
atau terhadap perkerasan lama susunan
bertangga ini diperlukan untuk
memungkinkan penggilasan yang sedikit
keluar dari tepi hamparan dan untuk
memperoleh daya dukung samping yang
memadai dan harus dibuat berturut-turut
selebar 5 cm untuk setiap lapisan atau
overlay yang dihampar pelebaran
perkerasan yang diperlukan seperti yang
ditunjukkan pada gambar untuk setiap
ruas jalan hanya merupakan nilai
rata-rata saja dan lebar pelebaran
aktual yang diperlukan dari m ke m
sepanjang jalan bervariasi sebagaimana
yang diperlukan dan sebagai
Hai sayang diperintahkan direksi
pekerjaan dengan tujuan untuk mencapai
lebar rancangan rata-rata pada setiap
titik bagaimanapun juga lebar pelebaran
0,5 M akan dipandang sebagai lebar-lebar
praktis minimum bilamana lebar pelebaran
teoritis yang diperlukan kurang dari 0,5
M Tetapi lebih besar dari 0,3 M maka
lebar pelebaran 0,5 M harus dilaksanakan
dan bilamana lebar pelebaran teoritis
yang diperlukan lebih kecil dari 0,3 M
maka tak perlu diadakan pekerjaan
pelebaran 5 penyiapan bentuk permukaan
dengan ketentuan formasi kalian pada
lokasi pelebaran perkerasan harus
disiapkan dipadatkan dan diuji
sebagaimana disyaratkan dalam
spesifikasi tentang penyiapan badan
jalan kontraktor harus memelihara
permukaan tersebut dalam keadaan kering
dan stabil sampai penghamparan
yang diperlukan untuk pelebaran
perkerasan yang harus diisi dengan bahan
tersebut segera mungkin setelah
pekerjaan penggalian formasi yang
disiapkan harus diperiksa oleh direksi
pekerjaan sesaat sebelum penghamparan
bahan yang diperlukan untuk pelebaran
perkerasan dan bahan tersebut tidak
boleh dihampar sebelum pekerjaan
penyiapan badan jalan disetujui oleh
direksi pekerjaan 6 penebangan pohon
untuk pelebaran dengan ketentuan
penebangan pohon hanya akan dilaksanakan
bilamana mutlak diperlukan untuk
pelaksanaan pelebaran jalan baik pada
jalur lalu lintas maupun pada bahu jalan
pohon-pohon yang sudah ditebang harus
diganti dengan cara penanaman pohon baru
di daerah bro atau diluar bahu Jalan
penebangan pohon tidak boleh
dilaksanakan bilamana kestabilan reklame
terganggu pemeriksaan formasi daerah
penyebaran dengan Ketua merah pelebaran
harus mempunyai dimensi dan geometri
yang sesuai dengan gambar cerita
mempunyai kepadatan yang memenuhi
kepadatan badan jalan kontraktor harus
memperbaiki setiap bagian formasi
daerah-daerah pelebaran yang tidak
memenuhi syarat atau mengalami kerusakan
dengan cara yang diperintahkan oleh
direksi pekerjaan pengerjaan atau
penghamparan dan pemadatan lapis pondasi
agregat dengan ketentuan yang
disyaratkan Dalam standar operasional
prosedur pekerjaan lapis pondasi agregat
yang terkait dengan penghamparan dan
pemadatan pemeriksaan lapis pondasi
agregat ketua frekuensi pengujian
pengendalian mutu harus ditingkatkan
sedemikian rupa sehingga tidak kurang
dari 5 pengujian indeks plastisitas atau
plastik indeks 5 pengujian gradasi
butiran dan satu pengujian kepadatan
krim maksimum harus dilakukan untuk tiap
500 M3
Khan yang dibawa kelapangan bilamana
lapis pondasi agregat telah dicampur
dengan bahan Lama Maka frekuensi minimum
dari pengujian yang disyaratkan harus
diterapkan pada tiap bahan baru yang
dibawa kelapangan dan Sebagai tambahan
harus diterapkan juga pada bahan yang
telah dicampur di lapangan untuk
pengujian tambahan kontraktor harus
mengambil contoh dari bahan yang telah
dicampur sampai kedalaman rancangan pada
lokasi yang ditunjukkan oleh pekerjaan
frekuensi pengujian pengendalian
kepadatan dan kadar air paling sedikit
harus satu pengujian sesuai SNI 03 28 28
1992 untuk setiap 50meter pekerjaan
pelebaran pada masing-masing sisi dari
Jalan jika diterapkan pelebaran 2xist
diukur sepanjang sumbu Jalan lapis
pondasi agregat pada pekerjaan ini harus
memenuhi toleransi dimensi tebal
kran dan kepadatan yang disyaratkan
Dalam standar operasional prosedur
pekerjaan lapis pondasi agregat
kontraktor harus memperbaiki setiap
lapis pondasi agregat yang tidak
memenuhi syarat atau mengalami kerusakan
dengan cara yang diperintahkan oleh
direksi pekerjaan pengerjaan produksi
penghamparan dan pemadatan lapis
beraspal harus sesuai dengan ketentuan
yang disyaratkan dalam spesifikasi yang
berhubungan dengan produksi penghamparan
dan pemadatan lapisan beraspal kecuali
beberapa hal sebagai berikut ini sebelum
bahan dihampar lapis resap pengikat yang
sesuai harus disemprotkan pada lapis
Pondasi yang sudah dipersiapkan dan
lapis perekat yang sesuai juga harus
tepat pada permukaan vertikal dari tepi
perkerasan lama pada pelebaran yang agak
sempit penghamparan dapat dilakukan
dengan cara manual tetapi dalam
batas-batas temperatur seperti
penghampar
dengan mesin pemadatan harus dilakukan
menggunakan alat pemadat mekanis atau
alat pemadat bergerak bolak-balik yang
disetujui alat pemadat kecil yang
bermesin sendiri dapat digunakan
bilamana lebar pekerjaan pelebaran cukup
untuk menampung seluruh roda alat
pemadat pemeriksaan lapis beraspal
dengan ketentuan pengujian kepadatan
dari bahan terhampar yang ditentukan
dengan pengujian benda uji Inti atau
harus dilaksanakan dengan frekuensi yang
tidak kurang dari satu pengujian setiap
100 m pekerjaan pelebaran untuk
masing-masing sisi jalan atau jika
diterapkan pelebaran dua sisi diukur
sepanjang sumbu Jalan rapist beraspal
pada pekerjaan ini harus memenuhi
toleransi dimensi tebal penghamparan dan
kepadatan yang disyaratkan Dalam standar
operasional prosedur yang sesuai rapi
beraspal pada pekerjaan ini dapat
terdiri atas laporan aspal 1
atau boruto dan leburan aspal dua lapis
atau budak campuran aspal panas Rush tak
dan latasbusir campuran aspal dingin
atau lapisan atas kadang pembersihan dan
pembongkaran lalu lintas apabila
perbaikan telah dilakukan Dan hasilnya
telah disetujui oleh direksi pekerjaan
maka Tahap selanjutnya adalah tahap
pembongkaran pekerjaan sementara dan
perapihan atau pembersihan lapangan
Tahap terakhir adalah pembukaan rambu
lalu lintas sementara
تصفح المزيد من مقاطع الفيديو ذات الصلة
Curso de manipulación higiénica de los alimentos - AGENCIA GUBERNAMENTAL DE CONTROL
How Modern Roads Are Built? Highway Construction Process
Melaksanakan Pekerjaan Pondasi Dangkal - Teknologi Konstruksi dan Properti
QUALITY CONTROL & QUALITY ASSURANCE OF X-RAY MACHINE
Perform a Venipuncture Collect a Venous Blood Sample Using the Vacuum Tube Method
Memelihara dan Memperbaiki Instalasi Listrik Bangunan Gedung - Teknik Instalasi Tenaga Listrik
5.0 / 5 (0 votes)