How to build a LEGAL BASEMENT from START to FINISH 🔨👷

Grow with Nav
9 Jun 202415:58

Summary

TLDRThis video script offers an in-depth look at the process of developing a legal, rentable basement from scratch. It covers the 13 essential steps, including initial consultation, layout approval, permits, framing, inspections, and finishing touches. The host, Naj, interviews Hergy, a civil engineer and realtor who shares expert insights on safety requirements, cost considerations, and the importance of adhering to city guidelines. Viewers are guided through the challenges and benefits of basement development to supplement mortgage payments, with a focus on creating additional living spaces and ensuring compliance with building codes.

Takeaways

  • 🏡 The video discusses the process of developing a legal rentable basement to supplement mortgage payments.
  • 👷 Hergy, a civil engineer and realtor, shares his expertise in construction and basement development.
  • 📝 The development process involves 13 steps, starting with measurements and initial consultation, and ending with final inspections and obtaining an occupancy permit.
  • 🔍 Key considerations for basement development include meeting city guidelines, permit fees, and ensuring fire safety requirements are met.
  • 🔄 Fire separation is crucial, with a minimum of 15 minutes fire separation required between the basement and the upper unit.
  • 📏 Minimum ceiling height for basements is 6' 5", and underpinning may be necessary if the natural height is insufficient.
  • 🛠️ The construction process includes framing, plumbing, HVAC, electrical work, and drywall installation, with inspections at various stages.
  • 💰 Costs for developing a basement can vary, with one example in the video mentioning a cost of $75,000 including HST and permits.
  • 🚪 Egress windows are required for fire exits, and separate entrances for basements may add additional costs.
  • 🔐 Safety features such as duct smoke detectors are essential to prevent the spread of fire and are a critical part of obtaining permits.
  • 👀 The video provides a behind-the-scenes look at basement construction, offering viewers a comprehensive understanding of the process.

Q & A

  • What is the main purpose of developing a legal rentable basement?

    -The main purpose of developing a legal rentable basement is to supplement the homeowner's mortgage payment by providing additional income through renting the space.

  • What qualifications does Hergy have that make him suitable for this project?

    -Hergy is a civil engineer by education, owns a construction company, and is also a realtor, giving him over a decade of experience in construction and expertise in the field.

  • What are the initial steps involved in developing a basement according to the script?

    -The initial steps include measurements and initial consultation, understanding client requirements, city guidelines, and expectations on cost and timelines.

  • Why is fire separation an essential consideration during basement development?

    -Fire separation is essential as per the Ontario Building Code (OBC) to ensure safety. It helps prevent the spread of fire and is a requirement for obtaining permits.

  • What is an egress window and why is it necessary in basement development?

    -An egress window is a larger window that provides a fire exit. It is necessary for safety reasons and is a requirement for basements to meet building codes.

  • What is the minimum ceiling height required for a basement according to the script?

    -The minimum ceiling height required for a basement is 6' 5" as per the building code.

  • What is underpinning and why might it be considered in basement development?

    -Underpinning is a process where the floor is lowered to increase the height of the basement. It is considered when the existing height does not meet the minimum requirement and is an alternative to increasing the overall height of the house.

  • What are the additional costs associated with creating a separate entrance for a basement?

    -The additional costs for creating a separate entrance can range from $12,000 to $15,000, depending on the project, and include the construction of a sidewalk or a below-ground stairwell entrance.

  • Why is the electrical panel capacity important when converting a basement into a legal duplex?

    -The electrical panel capacity is important because it needs to support the increased electrical load from additional appliances like laundry machines and air conditioners. An upgrade from a 100-ampere to a 200-ampere panel may be necessary.

  • What is the estimated cost for a two-bedroom, one-bath basement with separate entrance and laundry?

    -The estimated cost for such a basement, including HST and permits, is about $75,000, and it features top-notch finishes in the kitchen and washroom.

  • What is the role of a duct smoke detector in a basement?

    -A duct smoke detector detects smoke in the system and, if smoke or fire is detected, it shuts off fuel and power to the furnace to prevent the spread of fire or smoke in the upper unit.

Outlines

00:00

🏗️ Basement Development Basics

This paragraph introduces the topic of developing a legal rentable basement from scratch, which can supplement mortgage payments. It covers the importance of permits, processes, challenges, costs, and timelines. The video features Hergy, a civil engineer turned realtor and construction company owner, who shares his expertise in construction and real estate. Hergy's experience and his venture with 'Bricks and Dreams' are highlighted, along with the host's mission to help immigrants achieve financial stability. The video promises to guide viewers through the 13 steps involved in basement development, starting with initial measurements and consultations to understand client requirements and city guidelines.

05:02

📐 Planning and Permits for Basement Renovations

This section delves into the detailed process of basement development, emphasizing the planning and permit stages. It explains the importance of creating a layout that meets legal requirements, including minimum ceiling heights, separate entrances, window specifications, and fire safety measures. The paragraph discusses the necessity of city approvals and the associated permit fees, as well as the critical aspects that city inspectors look for, such as fire separation, interconnected fire alarms, and egress windows for fire exits. It also touches on the challenges of meeting these requirements, such as minimum height restrictions and the option of underpinning to increase basement height legally.

10:02

🛠️ Framing, Inspections, and Finishing Touches

This paragraph outlines the construction process post-permit approval, starting with initial framing to establish room locations and client expectations. It highlights the importance of subsequent inspections for plumbing, HVAC, and electrical systems to ensure compliance with building codes. The paragraph explains the sequence of construction activities, including framing, plumbing, HVAC, electrical work, and drywall installation, followed by mudding to prepare surfaces for a finished look. It also discusses the final stages of construction, which involve flooring, tiling, trims, bathroom installations, priming, and painting, culminating in a final inspection for occupancy permits. Additional costs for separate entrances and electrical panel upgrades are also mentioned, along with considerations for water line sizes to support multiple units.

15:02

🔥 Safety Requirements and Project Showcase

The final paragraph focuses on safety requirements for basement renovations, particularly the installation of duct smoke detectors to prevent the spread of fire. It explains the role of these detectors in shutting off fuel and power to the furnace in case of smoke detection, thereby enhancing fire safety. The paragraph also showcases a completed project by Hergy and his team, detailing the cost and features of a two-bedroom, one-bath basement with a separate entrance and laundry. It emphasizes the high-quality finishes in the kitchen and washroom and invites viewers to follow Hergy's Instagram for more insights into construction processes. The video concludes with a call to action for subscriptions, likes, and comments, encouraging viewers to engage with the content and share their preferences for future videos.

Mindmap

Keywords

💡Basement Development

Basement development refers to the process of transforming an unused or partially used basement into a functional living space, typically by adding bedrooms, bathrooms, and other amenities. In the video's context, it is about creating a legal, rentable basement to supplement mortgage payments. The script mentions various steps involved in this process, from initial consultation to obtaining permits and meeting city guidelines.

💡Permits

Permits are official documents granted by the city or municipality that authorize the commencement of construction work. They are essential for basement development to ensure all work complies with local building codes and safety regulations. The script discusses the process of obtaining permits, including the associated fees and the necessity of city approval for the basement layout.

💡Fire Separation

Fire separation is a construction requirement that involves creating a barrier to prevent the spread of fire between different parts of a building. It is a critical safety feature emphasized in the script, where the city's guidelines mandate a minimum of 30-minute fire separation. The script mentions that interconnected fire alarms and egress windows are also part of meeting fire safety requirements.

💡Egress Window

An egress window is a large window designed to provide a secondary means of escape in case of an emergency, such as a fire. It is a specific requirement for basement development to ensure safety during emergencies. The script describes egress windows as 'bigger windows' that are part of the fire exit strategy for the basement.

💡Ceiling Height

Ceiling height refers to the vertical distance from the floor to the ceiling in a room. It is a crucial aspect of basement development as it affects the comfort and usability of the space. The script specifies a minimum height requirement of 6' 5" for basements and discusses the implications of not meeting this requirement, such as the need for underpinning.

💡Furnace

A furnace is a major appliance used for heating a home. In the context of the video, moving the furnace is a significant step in basement development to create an open-concept living space. The script mentions the cost and effort involved in relocating the furnace to facilitate the basement's layout.

💡Electrical Panel

An electrical panel, also known as an electrical distribution board, is the central point in a building's electrical system where circuits are connected to the main power supply. The script highlights the importance of having an adequate electrical panel, especially when converting a basement into a legal duplex, to handle the increased electrical load.

💡Water Line

A water line is the pipe that carries water from the main supply to a building. The script discusses the need to upgrade the water line from the city's curb stop to the property to support the increased demand of two units, especially in older properties with smaller lines.

💡Mudding

Mudding is a stage in the drywall finishing process where a mixture of joint compound is applied to seams and imperfections in the drywall to create a smooth surface. It is part of the final stages of basement development mentioned in the script, preparing the walls for painting and other finishing touches.

💡Occupancy Permit

An occupancy permit is a document issued by the city or municipality that certifies a building or a part of it is safe for habitation and complies with all building codes and safety regulations. The script mentions the final inspection and obtaining an occupancy permit as the last step in the basement development process.

💡Walk-out Basement

A walk-out basement is a type of basement that has an entrance leading directly to the outside of the house, usually at ground level. The script discusses the advantages of having a walk-out basement, such as easier access and more natural light, and the additional costs associated with creating a separate entrance if a walk-out is not possible.

Highlights

Importance of fire safety in basement development, with a focus on fire separation and interconnected fire alarms.

The cost of moving a furnace to create an open concept living space in a basement renovation.

13 steps involved in developing a legal rentable basement, including permits, process, challenges, costs, and timeline.

Hergy's expertise as a civil engineer, construction company owner, and realtor in basement development.

Naj's mission to retire himself and 1 million immigrants with $5 million through real estate education.

Minimum ceiling height requirements for basements and the option of underpinning to meet these requirements.

Two different floor plans offered to clients for basement development, allowing them to choose based on their preferences.

The process of obtaining permits for basement development, including the timeline and inspections involved.

The importance of electrical panel capacity when converting a basement into a legal duplex.

The necessity of upgrading water lines in older properties to support two units in a basement development.

The mudding stage in basement construction and its role in preparing the walls for final finishes.

The cost of creating a separate entrance for a basement, including the additional expense for below-ground stairwells.

Safety requirements for basements, including duct smoke detectors to prevent fire spread.

The completed project of a two-bedroom basement with separate entrance and laundry, and its cost breakdown.

Hergy's Instagram page as a resource for behind-the-scenes construction insights.

The call to action for viewers to subscribe to the channel, like the video, and comment on their favorite parts.

Transcripts

play00:05

one of the most essential things that

play00:06

they look at is

play00:09

jobs in the furnace the probability of

play00:13

getting a fire are much higher this is

play00:15

crazy so how much money did you spend to

play00:17

move it there it cost me close to this

play00:20

video is the only video you'll ever want

play00:23

to watch if you want to understand how

play00:25

to develop a legal rentable basement

play00:27

from scratch that would help you

play00:29

supplement your mortgage payment we'll

play00:31

talk about permits process challenges

play00:34

costs and timeline as we look at

play00:36

different homes in different stages of

play00:38

development and for this we have hergy

play00:40

with us who is part of bricks and dreams

play00:42

my realtor Partners a civil engineer by

play00:45

education and owns a construction

play00:47

company along with being a realtor tell

play00:49

us a little

play00:50

bit well uh I have over a decade of

play00:53

experience in construction but this this

play00:56

Venture is something we just started

play00:57

over an year ago and that's when I

play01:00

decided you

play01:05

know and you know start to have a second

play01:09

uh Venture where create some income and

play01:12

also help the clients if you are new to

play01:13

this channel my name is Naj and I'm on a

play01:15

mission to retire myself and 1 million

play01:18

more immigrants with $5 million do

play01:21

subscribe to the channel if you have not

play01:22

done that already and let's get started

play01:27

[Music]

play01:34

all right so we are in an amazing

play01:36

basement right now I love it it's a walk

play01:38

out basement and we have with us and

play01:41

he'll explain to

play01:48

us this

play01:53

is we are planning to build a

play01:54

two-bedroom basement here and while also

play01:57

keeping some of the area for the owner's

play01:59

use as a storage and gym area so now

play02:01

let's talk about the 13 steps that are

play02:02

involved in developing a basement number

play02:05

one is measurements and initial

play02:06

consultation where hergy and his team

play02:08

will go to the client and understand

play02:09

what their requirements are whether they

play02:11

want a one bedroom basement or a

play02:12

two-bedroom basement they'll also look

play02:13

at the requirements as for the city

play02:15

guidelines and that's the initial

play02:16

consideration that has to be made first

play02:18

then obviously the expectation on cost

play02:20

timelines all that is discussed then

play02:21

her's team will be building a layout as

play02:23

per legal requirements the third step in

play02:25

this is forwarding the layout after the

play02:27

approvals from the client obviously uh

play02:29

they forward the layout to the city for

play02:31

approval and this includes the permit

play02:32

fees because obviously there's a fees to

play02:34

the uh you know to making changes uh to

play02:36

the house as well there are kitchen

play02:38

requirements their height of the

play02:39

basement you know there has to be a

play02:40

minimum height we'll talk about that

play02:41

separate entrance window requirements

play02:43

fire safety there's so many things that

play02:44

need to be looked at and because they

play02:46

are experts they know exactly what the

play02:48

city requires and they make sure that

play02:50

all the requirements are

play02:52

met important like when you are looking

play02:56

at the plans and everything like is it

play02:57

the ceiling height is it a separate

play02:59

entrance like what what are the three or

play03:01

four things that they are definitely

play03:02

looking at when it comes to approvals

play03:04

well to be honest with you they they

play03:05

look at everything you know they look at

play03:08

okay how are you installing the separate

play03:10

entrance H where are you installing it

play03:13

and one of the most essential things

play03:15

that they look at is fire separation

play03:17

right because uh as per OBC uh we need

play03:20

to have 30 minute fire

play03:24

separation we provide interconnected

play03:27

fire alarms anyway uh which are

play03:29

connected with the upper unit as well so

play03:33

requirement then you're only required to

play03:36

put in 15 minutes fire separation got it

play03:38

but uh we try to do both ah makes sense

play03:42

Mak sense to just and then you also have

play03:45

to have one egress uh window for the

play03:47

fire exit for the fire exit so igress

play03:49

window is basically a bigger window uh

play03:51

which you see uh here these are all

play03:53

igress windows now we talking about

play03:57

[Music]

play04:00

so the minimum height that's required is

play04:03

6' 5 in that's going to be across all no

play04:06

that's the lowest height that they would

play04:08

allow you right just say here we have uh

play04:11

I can just tell you this is 7 fo10 uh

play04:13

and we will most likely remove this

play04:15

uhhuh and uh we would have a roughly 8T

play04:19

sorry 7t 10 ceiling that's more than

play04:21

acceptable okay but the 65 would apply

play04:25

here ah because we have lowered this

play04:27

down and by the time you put a drve ball

play04:29

and framing here this might come down a

play04:31

little bit more M right but in certain

play04:33

cases there's no way you are able to do

play04:35

it sense like like if it's a little bit

play04:38

City would allow it okay right and but

play04:41

if it's if you still can't do it then

play04:44

the other option you have is

play04:55

underpinning so what we are trying to do

play04:56

is we trying to you know not increase

play04:59

the but it used the floor and that's how

play05:01

we increase height that's requires a lot

play05:03

of cost we'll not get into that um not

play05:06

recommended in most cases but um yeah

play05:09

that's how we can make it legal now this

play05:11

basically is the floor plan and her has

play05:13

actually given two floor plans to this

play05:15

client so if you just try to imagine you

play05:18

know we came down from here this is the

play05:20

gym area uh and then there'll be a

play05:22

bedroom here there'll be a laundry here

play05:25

uh and then you know you'll have uh the

play05:27

furnace closet this is the bedroom

play05:28

number two this is the kitchen and

play05:30

here's the you know where the living

play05:32

area will go and here's the bathroom and

play05:34

there's a even a walk-in closet you know

play05:36

if you look at this bathroom um and then

play05:38

you know so this is where you come down

play05:40

and this is where you enter basically

play05:41

and on in the entrance there's a laundry

play05:43

as well so it's a pretty nice you know

play05:45

like very spacious um you know um

play05:48

looking plan uh and this is the walk out

play05:50

basement I think this is the patio door

play05:52

so this is where the entrance will be so

play05:54

it's pretty amazing and then this is

play05:55

basically an alternate plan where the

play05:57

layout is a slightly different uh it it

play05:59

doesn't give you know a walk-in closet

play06:01

it gives a smaller closet but the washer

play06:03

dryer is at a different position it

play06:05

makes the uh house a little bit bigger

play06:08

uh when it comes to bedroom number two

play06:09

so these two options the client can

play06:11

actually choose you know what they like

play06:13

and that's how uh the layout works and

play06:16

depending on you know this is all bu up

play06:17

to building Cod and depending on what

play06:19

the client chooses uh this will actually

play06:21

go to the city uh for permits then

play06:24

number four is of course the permit

play06:26

comes in 2 to 4 weeks then there is

play06:28

framing that will be started now they do

play06:30

not complete all the framing that's what

play06:31

you know harji told me they don't

play06:32

complete all the framing because there's

play06:34

another inspection that happens but what

play06:35

they do is after they do the initial

play06:37

framing so that they know what room uh

play06:39

goes where and what it looks like and

play06:41

the client can also you know imagine a

play06:42

little bit you know because it's very

play06:43

difficult for someone who has not done

play06:45

it you know um himself to know uh or get

play06:48

into the brain and even understand the

play06:49

layout uh when it's made it's just

play06:51

easier if the framing is done to

play06:53

understand how the bedroom would look

play06:54

like and how the kitchen would look like

play06:56

and how the entire layout would look

play06:57

like then obviously uh when the framing

play06:59

happens without doing the drywall it's

play07:01

much easier to do the plumbing HVAC

play07:03

electricals all that happens after the

play07:06

framing and then they basically complete

play07:08

the framing after they've completed the

play07:11

framing then another inspection happens

play07:12

all the greens ones are that are not in

play07:15

control of the construction people these

play07:16

are all and everything that is marked in

play07:18

green these are all inspections it's

play07:20

very much dependent on City and how much

play07:21

time they take to do it uh usually this

play07:23

particular inspection uh you know is

play07:25

happens pretty quickly because the

play07:26

inspector is already assigned uh so

play07:28

inspection happens in need to make sure

play07:30

that the plumbing is as per code uh HVAC

play07:33

is there electricals are there so

play07:34

everything has to be as per code and

play07:36

that's why this particular inspection

play07:37

happens and after the inspection is done

play07:39

then they actually do the drywall

play07:41

because now you cannot make a lot of

play07:42

changes once you have done the drywall

play07:44

so then the drywalling happens then

play07:45

there's something called as mudding and

play07:47

now will explain what mudding actually

play07:58

means out there just to make it look

play08:00

very nice the way we see the finished W

play08:03

after that we are in the final stages

play08:05

where we have to finish the entire you

play08:07

know house we have to do flooring tiling

play08:09

trims bathrooms and then there is

play08:11

priming and painting and plus we also

play08:13

need to do kitchen installations and

play08:15

bathroom installation so all the

play08:16

finishing touches go on step number 11

play08:18

and 12 and finally there's a final

play08:21

inspection that happens just to ensure

play08:22

that everything is to code all the you

play08:25

know fittings have been to code and it's

play08:27

all you know good and once the inspector

play08:28

is satisfied

play08:30

then you get the occupancy

play08:32

permit basement it's very easy to have a

play08:34

separate

play08:36

entrance you just need to make a

play08:38

sidewalk uh what happens if you don't

play08:40

have a walk out

play08:43

basement so then we have to do a below

play08:45

ground stairwell entrance

play08:50

and you know that's the direct cost that

play08:53

gets added to the project uh 12 to

play08:56

$5,000 depending upon project to project

play09:01

there to do

play09:09

it we need to have from your building

play09:11

footprint to your property L you need to

play09:14

have at least 4 foot four if you don't

play09:16

have

play09:20

it this is the thing and the second

play09:22

thing I look for is what type of

play09:24

electrical panel they have why is that

play09:27

important it is important because uh if

play09:29

if you are converting into legal duplex

play09:31

if you have up to 125 ampere panel it

play09:35

will not be able to take the electrical

play09:37

load laundry or plus air conditioner

play09:42

right so you need to upgrade it to

play09:44

almost

play09:47

200 because say we are just doing a

play09:49

project in

play09:51

Brandford 200 possible the maximum we

play09:54

are going to get is uh

play09:58

150 we have recommended the clients to

play10:02

uh install one of their stoves as

play10:05

gas

play10:08

gas makes sense and the the third thing

play10:11

I look for is the size of water line but

play10:16

this is a new property built in

play10:19

2019 but some of the properties which

play10:22

are older 58 in line and that is not

play10:26

enough to support two units M so in

play10:30

those cases you have to upgrade your

play10:32

water line from City's curb stop to your

play10:35

within your property and that's also an

play10:37

additional cost rly uh it can vary from

play10:41

$5 to $8,000 depending upon KY length

play10:45

all right we are in her's basement now

play10:48

which is under

play10:49

construction nice so this is what stage

play10:53

now well this is at mudding stage right

play10:55

now uhhuh and here it's going to be

play10:58

kitchen okay and well this is what

play11:01

upgraded 200 a okay you have upgraded

play11:04

this 200 US like Bel provided 100 we

play11:07

have upgraded it to 200 got it because

play11:10

100 won't support two laundries and two

play11:12

stoves Mak sense and here it will be

play11:16

kitchen very small kitchen M and then uh

play11:19

this is going to be living area mhm and

play11:22

this is going to be bedroom that's going

play11:23

bedroom this is washroom okay this will

play11:26

be washroom this is washroom so

play11:33

con so this is going to be one bedroom

play11:35

this is going to be the bedroom and ab

play11:38

be uh like originally I wanted to have a

play11:41

closet here uh but because I'm doing

play11:44

everything legally so the door has to be

play11:47

at like 32 in wide so I was not able to

play11:50

put a closet so what I have done to C to

play11:54

that is I have I'm going to convert the

play11:57

under stairs portion ah

play12:08

uh this should be easily I think $1,300

play12:11

,300 plus utility is 30% nice

play12:20

yeah so all of this is out yes so this

play12:24

planning happens at uh the stage

play12:27

roughing stage ruffing stage happens

play12:39

inspection so now what we need to do

play12:41

after this is

play12:43

finishing there is one more layer of

play12:46

mudding that they need to do and after

play12:48

that uh I'm going to call in painter to

play12:50

do the priming and right where we are

play12:52

going to call in the finishing team to

play12:54

install flooring and uh washroom

play12:57

instulation and last thing to catchen

play12:59

installation all right time total from

play13:02

starting to let's say end roughly like

play13:08

is but I was also not very aggressive on

play13:12

this because I'm focusing more on my

play13:14

clients better than my own by the way

play13:16

has done something really amazing where

play13:18

her is standing was what heri so so when

play13:21

when when I bought this house from the

play13:22

build so this where we standing I had

play13:25

the furnace and the water heater was

play13:28

there one of the first things when I was

play13:30

visualizing the basement floor plans I

play13:33

was like okay I was always wanting to

play13:35

have open concept living room in order

play13:38

to get that I had to move my furnace

play13:41

pretty much my whole mechanical room had

play13:43

to be moved

play13:46

there this is crazy so how much money

play13:48

did you spend to move it there it cost

play13:50

me close to $5,000 to to move that but

play13:54

this is so much worth it because you got

play13:55

so much space here and this can be a

play13:57

bedroom with a walk-in closet and a

play13:58

laund

play14:11

and this is pretty big awesome amazing

play14:14

are the best thank you now let's go to

play14:16

another project that hergy and his team

play14:18

just completed this is a two-bedroom one

play14:21

bath basement with separate entrance and

play14:23

separate laundry this basement would

play14:24

cost about $75,000 including HST and

play14:27

permits and the finishes are topnotch

play14:30

especially in the kitchen and washroom

play14:33

now let's understand a few safety

play14:35

requirements in this basement because

play14:37

they are so critical to getting the

play14:39

permits this is duct smoke detector and

play14:42

uh in simple terms uh the purpose of

play14:45

this is to detect any smoke in the

play14:48

system in case it detects any smoke or

play14:51

fire it will shut off Fuel and power to

play14:54

this furnace so that to prevent the

play14:57

spread of any further fire or smoke in

play15:00

the upper unit very simple reason in

play15:02

case of any fire it will immediately

play15:04

kick in and you know prevent the spread

play15:07

of fire the utility room is close to

play15:12

60t source of fire usually mechanical

play15:15

room it can be because at the end of the

play15:18

day in the furnace uh the probability of

play15:21

getting a fire are much higher compared

play15:23

to any other uh parts of the house

play15:26

that's awesome hery is a very kind

play15:28

person and a Powerhouse of knowledge do

play15:31

follow his Instagram page to know more

play15:33

about behind the scenes of construction

play15:35

that's all I have for today do subscribe

play15:36

to the channel if you have not done that

play15:38

already do hit the like button if you

play15:39

really love the video and do put in the

play15:42

comments what is the best part of this

play15:44

particular video and what all videos you

play15:46

would want to see in

play15:48

future byebye

play15:51

[Music]

Rate This

5.0 / 5 (0 votes)

相关标签
Basement RenovationLegal RentalConstruction TipsSafety RequirementsPermits ProcessMortgage HelpReal EstateHome ImprovementFurnace SafetyRental Income
您是否需要英文摘要?