Siding, Windows & Doors Installation (COST REVEALED!) | 60 Day Home Build Challenge!

Case Lucas Robinson
7 Sept 202316:03

Summary

TLDRIn this engaging home-building video, the creator shares their experience with the 23rd day of their second home build project. The focus is on installing siding, windows, and exterior doors. They use James Hardy fiber cement siding for its durability and water resistance, opting for a mix of lap and panel siding. The construction team faces challenges such as a cracked window, which the builder decides to cover due to the workers' hard labor and slim profit margins. The builder also emphasizes their choice of black aluminum windows from Ply Gem and a high-quality front door, which adds a significant cost but is expected to enhance the home's curb appeal and longevity. The video concludes with a look at the completed siding, windows, and doors, and a teaser for upcoming videos on spray foam insulation and a standing seam metal roof.

Takeaways

  • 🏡 The home build project is on day 23, focusing on installing siding, windows, and exterior doors.
  • 📦 James Hardy fiber cement siding is chosen for its durability, water resistance, and non-flammability.
  • 🔨 The builder is using a combination of lap siding and panel siding for different sections of the house.
  • 🧱 Half-inch OSB 716 is used for wall sheathing, which is stronger than cheaper alternatives.
  • 🛠️ Scaffolding is utilized for installing siding, with a system that can be raised as work progresses upwards.
  • 🖼️ Ply gem is the manufacturer for the black on black aluminum windows, chosen for their quality and appearance.
  • 💰 The decision to upgrade windows and the front door adds to the cost, but is expected to improve the property's performance and curb appeal.
  • 🚪 A high-quality front door is installed, costing significantly more than a standard door, to enhance the first impression of the house.
  • 📏 The builder opted for an 8-inch fascia and a larger roof overhang for a more grand appearance.
  • 🔩 The back door is a more economical choice, as it does not affect the curb appeal and is functionally sufficient.
  • 🏗️ The construction process experienced delays due to heat, material shortages, and the need for extra shipments.
  • 📈 The total cost for windows, doors, and siding materials is detailed, along with the labor costs for installation.

Q & A

  • What type of siding is being installed in the video?

    -The siding being installed is called James Hardy fiber cement siding, which is neither wood nor vinyl but made of fiber cement.

  • What are the advantages of using fiber cement siding over wood or vinyl?

    -Fiber cement siding is advantageous because it is fire-resistant, highly water-resistant, and generally stronger than wood or vinyl.

  • What is the name of the window manufacturer being used in the home build?

    -The window manufacturer being used is Ply Gem.

  • What is the difference between the windows used in the last build and the current one?

    -In the last build, black on white vinyl windows were installed. In the current build, black on black aluminum windows are being installed, which are more expensive but offer higher quality and better performance.

  • How much additional cost was there for upgrading the windows to black on black aluminum?

    -The additional cost for upgrading to black on black aluminum windows was about $500 to $600.

  • What is the role of the OSB 716 in the construction process?

    -OSB 716 is used for the wall sheathing, providing a stronger and more durable base for the walls compared to cheaper, more cardboard-style materials.

  • What is the issue with the window that was discovered during the build?

    -A window was found to be cracked, which likely occurred during the installation process.

  • How does the builder plan to handle the broken window?

    -The builder is considering talking with the subcontractor about the issue but is also prepared to cover the cost of the broken window if it amounts to a few hundred dollars, as they understand the small margins the installers work with.

  • What is the cost of the front door that was installed?

    -The front door cost $2,863, which is a significant upgrade from a previous build where a $500 front door was installed.

  • What is the difference in the overhang size between this house and the builder's other house?

    -This house has a 24-inch overhang, which is 8 inches larger than the 16-inch overhang on the builder's other house.

  • What is the next step in the construction process after the siding, windows, and doors are completed?

    -The next step is to install spray foam insulation on the inside and proceed with a standing seam metal roof on the exterior.

  • What is the total cost for the windows, front door, back door, and siding material?

    -The total cost for the windows was $5,975, the front door was $2,863, the back door was $546, and the siding material was $6,595.

Outlines

00:00

🏗️ Home Construction Update: Siding, Windows, and Doors Installation

This paragraph discusses the ongoing home construction process on day 23, focusing on the installation of siding, windows, and exterior doors. The siding material, James Hardy fiber cement, is highlighted for its fire-resistant and water-resistant properties. The builder shares the progress made on the first day, including the delivery of siding materials, the installation of wall sheeting, and the use of a scaffolding system to facilitate the siding installation. The choice of black on black aluminum windows from Ply Gem is explained, noting the higher quality and cost compared to previous builds. The paragraph concludes with an update on the installation progress and the anticipation of the arrival of window materials.

05:00

🚪 Door and Window Installation Challenges

The second paragraph details a setback encountered during the construction process—a cracked window installed by the workers. The builder decides to address the issue with the subcontractor responsible for the siding, windows, and door installation. It is mentioned that the work initially planned for 2-3 days has extended due to various reasons, including the need for additional materials and the intense heat affecting the workers' pace. The builder also discusses the decision to cover the cost of the damaged window, considering the small margins and hard work of the subcontractors. The paragraph concludes with a look ahead to upcoming tasks such as installing the roof deck and starting the interior plumbing.

10:02

🏡 Aesthetic and Structural Upgrades in Home Construction

This paragraph describes the aesthetic and structural choices made during the construction process. The builder opted for a panel siding for the front of the house, providing a distinct look, and chose black aluminum windows for their visual appeal and efficiency. A significant upgrade was made to the front door, with a decision to invest in a high-quality, black steel door for a better first impression. The builder also discusses the decision to extend the roof overhang for a more grand appearance and the choice of wider fascia for a more substantial look. The paragraph concludes with a mention of the completed electrical, HVAC, and plumbing rough-in work, setting the stage for the next steps in the construction process.

15:04

💵 Cost Breakdown and Upcoming Construction Phases

The final paragraph provides a cost breakdown for the materials and labor involved in the construction project. The builder lists the expenses for the windows, front door, back door, siding materials, and installation labor. The total costs for the windows and doors are detailed, along with the decision to prioritize quality over cost savings in certain areas. The paragraph concludes with a preview of the upcoming construction phases, including spray foam insulation and the installation of a standing seam metal roof, and an invitation to subscribers to stay tuned for the next video updates.

Mindmap

Keywords

💡Home Build

Home Build refers to the process of constructing a house from the ground up, which is the central theme of the video. The video documents the various stages and tasks involved in building a home, such as installing siding, windows, and exterior doors. The home build process is showcased through the daily progress and challenges faced by the builder.

💡James Hardy Siding

James Hardy Siding is a specific brand of fiber cement siding material used in the construction project. It is chosen for its durability, resistance to fire, and water resistance, which are important considerations for the home's exterior. The video mentions James Hardy as an alternative to wood or vinyl siding, highlighting its superior qualities in the context of the home build.

💡OSB Sheathing

OSB, or Oriented Strand Board, is a type of engineered wood used as sheathing for walls in construction. The video emphasizes the use of half-inch OSB sheathing for added strength compared to cheaper, inferior products. It is an essential component in the home build process, providing structural integrity to the walls.

💡Lap Siding

Lap Siding is a type of siding material that overlaps horizontally, creating a flush surface on the exterior of a house. In the video, lap siding is used on one section of the house and is differentiated from panel siding by its width and installation method. It contributes to the overall aesthetic and design of the home's exterior.

💡Exterior Doors

Exterior Doors are the entry points to a home from the outside and are crucial for security, insulation, and aesthetics. The video discusses the installation of exterior doors, emphasizing the choice of a high-quality front door for its 'wow factor' and a more basic back door, reflecting different priorities for different parts of the house.

💡Ply Gem Windows

Ply Gem is the manufacturer of the windows chosen for the home build. The video highlights a shift from vinyl windows to black aluminum windows, which are more expensive but offer a higher quality and better performance. The choice of Ply Gem windows is tied to the long-term maintenance and appearance of the rental property.

💡Scaffolding System

A Scaffolding System is a temporary structure used to support a work crew and materials during the construction process. In the video, it is used to facilitate the installation of siding as workers raise the scaffolding to reach higher sections of the house. The scaffolding system is essential for accessing hard-to-reach areas during the siding process.

💡Fascia and Soffit

Fascia and Soffit are parts of a house's exterior that are part of the roof edge system. Fascia is the vertical board that trims the rafter ends, while the soffit is the material that vents the attic underneath the roof overhang. The video discusses an 8-inch fascia and a larger roof overhang to give the house a more grand appearance.

💡Rough-in

Rough-in refers to the initial phase of installing electrical, plumbing, and HVAC systems within a home before the walls are closed in. The video mentions the completion of the rough-in phase for plumbing, electrical, and HVAC, which is a critical step before proceeding to the next stages of construction.

💡Standing Seam Metal Roof

A Standing Seam Metal Roof is a type of roofing material that features raised seams created by the interlocking of metal panels, providing a weather-tight seal. The video mentions plans to install a standing seam metal roof on the exterior of the home, indicating an upcoming phase in the home build process.

💡Spray Foam Insulation

Spray Foam Insulation is a type of insulation material that is sprayed in place to fill wall cavities and provide a high level of insulation. The video mentions the upcoming task of installing spray foam insulation on the interior of the home, which is an important step for energy efficiency and thermal performance.

Highlights

Day 23 marks the second home build's installation of siding, windows, and exterior doors.

James Hardy fiber cement siding is chosen for its fire-resistant and water-resistant properties.

A combination of lap siding and panel siding in 4x8 sheets is used for different sections of the house.

Half-inch OSB 716 is used for wall sheathing, offering more strength than cheaper alternatives.

Scaffolding system with foot pedestals is utilized for efficient siding installation as the house construction progresses.

Windows are upgraded to black on black aluminum for a better long-term performance and appearance.

A cracked window incident occurred, and the builder decided to cover the cost instead of penalizing the workers.

The siding, windows, and doors project extended beyond the initial 2-3 days' timeline due to various factors.

A larger 24-inch roof overhang and 8-inch fascia were chosen to give the house a more grand appearance.

The builder opted for a high-quality front door, investing an additional $2,000-$2,500 for a better first impression.

A $500 back door was installed, saving costs as it does not affect curb appeal.

The builder shares the costs for windows, doors, siding materials, and labor.

Rough-in work for HVAC, plumbing, and electrical systems is completed within the construction timeline.

Spray foam insulation and a standing seam metal roof are the next steps in the construction process.

The builder emphasizes the importance of curb appeal and the strategic investment in high-quality materials for long-term value.

Despite the challenges and extended timeline, the builder remains committed to quality and workmanship in the home build.

Transcripts

play00:00

so today is day number 23 of my second

play00:02

home build and in this video we're going

play00:04

to be installing the siding the windows

play00:06

and the exterior doors let's get into

play00:08

the

play00:08

[Music]

play00:28

video

play00:31

all right so we're halfway through day

play00:32

number one of the siding windows and

play00:34

doors and let's go check it

play00:37

out so yesterday we got all of the

play00:40

siding material delivered this is the

play00:43

actual sighing it's a it's called James

play00:45

Hardy not sponsored wish they would but

play00:48

James Hardy sighing it's a fiber cement

play00:50

siding so it's not wood it's not vinyl

play00:53

it's fiber cement um basically it's like

play00:56

cement it doesn't catch on fire super

play00:58

water resistant you'll see later in the

play00:59

video but I'm using a combination of

play01:01

this lap siding that's here on this wall

play01:03

as well as a panel siding that comes in

play01:06

a big 4x8 sheet on another section of

play01:08

the house so got the siding material

play01:10

here as well as we got the OSB uh 716

play01:14

OSB for the wall sheathing a lot of

play01:16

Cheaper Builders use like real inferior

play01:18

product there like a cardboard style

play01:20

piece of wall sheathing and I'm

play01:23

using half2 inch OSB it'll make the

play01:25

house a little bit stronger it's about

play01:26

2:00 through day one it's supposed to

play01:28

only take 2 days to finish all of the

play01:29

sighing and the corness the windows and

play01:31

the doors and we haven't made too much

play01:34

progress to be honest but as you can see

play01:36

we've installed the wall sheeting that

play01:38

is behind this white underlayment then

play01:40

we installed the the H home wrap uh

play01:43

underlayment now the guys are installing

play01:46

the lap siding they use this um

play01:49

scaffolding system where they set the

play01:52

post on the ground goes up and they

play01:55

anchor it into the top of the house and

play01:58

they use that foot

play02:00

pedestal

play02:02

idly they use the foot pedestal to pump

play02:04

up each side of the uh scaffolding to

play02:06

raise them higher and higher so they can

play02:08

install the siding as they go up um so

play02:11

right now we've got this side

play02:14

done so as of right now we just had half

play02:17

of that right side done and on the back

play02:19

side looks like we got about half of it

play02:21

it appears that they're going to install

play02:23

the bottom floor and then go up finish

play02:25

all the siding then go up to the top

play02:27

floor put the sheeting the paper and the

play02:30

sighting so anyways making progress we

play02:33

got probably got speed it up to finish

play02:34

by the end of the day tomorrow the

play02:35

exterior doors will be here soon I'm

play02:37

sure they'll get those installed later

play02:39

today and then tomorrow the window

play02:41

material is uh scheduled to arrive yeah

play02:44

we're on

play02:53

track on they said sound like they

play02:55

wanted

play02:58

to

play03:14

so these are the the windows I'm

play03:15

installing the manufacturer is ply gim

play03:18

and one thing I decided to do on this

play03:20

build in comparison to my last build my

play03:22

last build I installed they're called

play03:24

black on white vinyl windows that means

play03:26

black on the outside white on the inside

play03:29

and and then the frame is vinyl whereas

play03:32

this time around I'm installing black on

play03:35

black aluminum so black on the outside

play03:37

black on the inside and then the frame

play03:39

is made of aluminum obviously that came

play03:41

with an upgraded cost um I'm paying an

play03:44

additional about $500 or $600 for that

play03:47

upgrade but I think over time a I know

play03:51

they're higher quality they're going to

play03:52

perform better they're going to look

play03:53

better but you know this is going to be

play03:55

a long-term rental property or I'm going

play03:57

to hold it for 10 20 years and hopefully

play03:59

that prevents having problems in the

play04:01

future with having to do maintenance and

play04:02

you know pay for costs that could come

play04:04

up so these are the windows I'm I'm

play04:07

happy with how they look now some of

play04:08

them are already installed they're

play04:09

looking

play04:28

good

play04:33

[Music]

play04:37

oh 107° I don't know how these guys do

play04:40

this all

play04:41

day end of day number three of the

play04:45

windows siding and doors last time I

play04:48

came by they told me they were going to

play04:49

install siding on the left in those

play04:51

three middle windows and then be done so

play04:54

let's finish up day number

play04:58

three

play05:00

[Music]

play05:18

oh

play05:20

sh I don't know if y'all can see that

play05:22

but uh got a cracked window can you'all

play05:25

see you right here B oh okay well

play05:28

let's go uh try to find out who did this

play05:32

cuz they were fine whenever they were

play05:33

delivered so that means the installer

play05:35

did it let's see if uh they're going to

play05:37

act like they don't know what happened

play05:39

or they're going to lie or they're going

play05:40

to tell the truth let's

play05:46

seeana

play05:52

Daniel

play05:56

no a

play05:58

ke

play06:00

too

play06:09

bedra pop so that is all for day number

play06:12

three so the installers said that the

play06:15

other worker he was the one who

play06:17

installed the window and I think he left

play06:19

just because they didn't really need him

play06:20

and they could have got done what they

play06:21

needed to without him today these three

play06:23

guys said that of course the one who

play06:25

isn't here I saw him installing the

play06:27

window I didn't notice he broke it but

play06:28

they said whenever he set the window in

play06:31

and installed it or whatever that it

play06:33

broke so it is what it is um I'm going

play06:36

to talk with the subcontractor that I

play06:38

hired the main boss that I hired to do

play06:40

the siding windows and door installation

play06:42

I want to talk to him and and see if if

play06:44

I can get him to cover you know at the

play06:46

end of the day if it's a couple hundred

play06:47

bucks or 100 bucks I'll probably just

play06:49

cover it because these guys are out here

play06:50

working hard and I know they have very

play06:52

small margins they can't afford to make

play06:54

mistakes you know like that that could

play06:55

cost them a couple hundred bucks cuz at

play06:57

the end of the day they're working on

play06:58

such small margin you know they make

play07:00

good enough money with the volume they

play07:01

do but they just can't afford to have

play07:03

mistakes on a job or it'll go bad so

play07:05

anyways I'll keep you updated today is

play07:07

Saturday evening this is the uh status

play07:10

of the building Monday I had to uh

play07:12

deliver some more material so they can

play07:13

finish the sighting and so that'll be

play07:15

here Monday afternoon and then these

play07:17

guys will be back on Tuesday to finish

play07:19

all the sighting between now and then

play07:20

we're going to install the roof deck

play07:22

we're going to start the uh rough in

play07:24

Plumbing on the inside at the inside of

play07:25

the walls but that's for another another

play07:28

video so I'll pick get up back Tuesday

play07:30

whenever we're finishing the siding and

play07:32

the exterior doors all right today is

play07:34

finally the last day of the windows and

play07:36

the siding and the exterior doors it was

play07:38

planned to only last 2 or 3 days and it

play07:40

it's lasted much longer than that for a

play07:42

couple reasons um I'll go over later in

play07:44

the video but I'm actually going to turn

play07:46

my truck around so we can load up this

play07:47

exterior door they got the installers

play07:49

are pretty much all the way done they

play07:50

just need to install this exterior door

play07:51

that I've been stowing in my garage so

play07:53

it doesn't get stolen uh my garage is a

play07:55

wreck so uh don't judge

play07:58

me

play08:06

okay

play08:14

good so looks like we have maybe 10 more

play08:17

pieces of siding and install the front

play08:19

door and siding will be

play08:23

done you see

play08:26

it

play08:28

ouch I was pulling a sticker off this

play08:30

window went to look over here and saw a

play08:31

broken window you know as a builder

play08:34

stuff always goes wrong it's my decision

play08:36

on how I want to handle it I've uh you

play08:38

know hired these guys that with a pretty

play08:39

low labor rates instead of kind of penny

play08:41

pinching them and making them pay for it

play08:43

I'll probably just go ahead and pay for

play08:44

it I don't want to be that guy anyway so

play08:46

that's a problem we'll have to get that

play08:56

fixed termin see

play09:05

oh say

play09:24

qu day 30 of the build um we're finally

play09:27

finished with the siding window those

play09:29

doors this uh seemed to last way too

play09:32

long I think we're only planning for

play09:34

this to last like 2 to 3 days and I

play09:36

think it ended up lasting over a span of

play09:40

8 n 10 days way too long anyway so

play09:44

here's what it looks like we've got

play09:45

everything finished up pertaining to the

play09:47

siding windows and doors there really

play09:48

wasn't too many problems with this this

play09:50

kind of trade other than you know it was

play09:52

hot the guys couldn't work too fast I

play09:54

had to make get it get some extra

play09:56

material shipped out here two or three

play09:58

times it seemed like so

play09:59

um it is what it is that's construction

play10:01

so on this side of the house only in

play10:04

this portion of the front of the house

play10:05

we're we're installing this uh panel

play10:07

siding it comes in or it came in 4x8

play10:10

sheets um it's a little different look

play10:12

it's only going on this front part of

play10:14

the house on the right and on the left

play10:16

over here is the uh lap siding this lap

play10:20

siding comes in different widths I think

play10:23

we installed like a 6 in wide lap siding

play10:26

and I know they come in like 7 in 8 in

play10:28

or 9 in so they come like pretty wide I

play10:30

decided to go with the shorter one cuz I

play10:32

think it kind of gives it a more

play10:34

contemporary look here's the windows I

play10:37

decided to

play10:38

install black aluminum windows the

play10:41

manufacturer is called ply gim and I

play10:43

don't know anything about the efficiency

play10:45

but they look good they're aluminum I

play10:46

ended up paying about $500 for the

play10:49

aluminum window option instead of the

play10:50

vinyl windows option so that's the

play10:52

windows here's the front door I decided

play10:55

to pay

play10:56

$2,800 I'll go over the cost here in a

play10:58

minute but I decided to make quite the

play11:01

upgrade here on this front door on my

play11:02

last home build I installed like a $500

play11:04

front door and I was not happy with the

play11:06

quality I didn't think it gives it you

play11:08

know like a real wow factor but I think

play11:10

whenever this house is all finished and

play11:11

you walk in this front door you know

play11:13

this is your first impression I decided

play11:15

to pay an extra $2,000 or $2,500 for

play11:18

this kind of door instead of a cheaper

play11:20

door it's a black steel door that I

play11:21

purchased from A supplier here in

play11:22

Houston um I've got to buy the hardware

play11:24

it's nice so there's that one thing I I

play11:28

decided to do on this build that kind of

play11:30

gives it a little different look it's

play11:31

not too common is this overhang where uh

play11:35

the fascia the front board is called the

play11:37

fascia and then underneath that is

play11:39

called the sopit that is called the roof

play11:41

overhang and I decided to do a twt

play11:44

overhang twoot 24 in most houses if you

play11:47

zoom in on my other house up there at

play11:49

the top that house I believe has a 16in

play11:51

overhang whereas this house here is has

play11:54

a whole another 8 in so it makes it much

play11:57

larger so there's one thing I did and of

play11:59

course comes with that comes with extra

play12:01

cost as far as material you got to buy

play12:03

wider material more square footage of

play12:04

material also something I did is 8 in

play12:07

fascia so on the very front part of that

play12:10

roof overhang it's 8 in tall 8 in in

play12:14

comparison to 6 in on the other house is

play12:16

6 in this one is 8 in it just gives it a

play12:19

more Grand feeling uh is a gives it just

play12:22

you know a bigger look bigger overhangs

play12:24

I don't know I like it I'm happy with

play12:25

how it turns out I think it looks good

play12:26

okay so now we're on the the I guess

play12:28

what's the right side of the house more

play12:30

lap sighting on this side this uh I had

play12:33

to pay extra in the previous video I

play12:35

explained I had to pay extra to get this

play12:36

wall framed up because it's quite a drop

play12:40

off to over there and it might affect

play12:42

the structural Integrity if we didn't do

play12:44

that so anyways we frame that up and

play12:47

right side of the house here's the back

play12:49

we got one bath uh one window in the

play12:51

bathroom up there in the shower tub

play12:54

combo and some more lap sighting here's

play12:57

the back of the house not not really

play12:59

tooo interesting but we have some dryer

play13:01

vents and some bath bathroom fan vents

play13:04

up there here's the back door all of

play13:06

this will get like regraded we'll come

play13:08

back we'll use some of that dirt to

play13:10

somewhat gradually grade this a little a

play13:12

little better I'm think I'm going to put

play13:14

some concrete steps here for you to walk

play13:15

into the back door there's a guest uh

play13:18

bedroom window up there here's the the

play13:20

back kitchen

play13:22

window and here's the other side of the

play13:24

house more lap siding there's the Jack

play13:27

and Jill bathroom with a uh

play13:29

little small window up there so here is

play13:32

the back door this was a $500 back door

play13:35

I could have installed a door just like

play13:37

this on the front which is much smaller

play13:39

less quality material and you know it

play13:41

cost $500 in comparison to $2,000

play13:43

something dollars I paid for that front

play13:44

door so I could have saved $2,000 by

play13:46

installing this there but this isn't

play13:48

something I'm you know too proud of as

play13:50

far as high quality or performance it's

play13:51

a piece of honestly so I'll install

play13:54

on the back because it's not going to

play13:56

affect the curb appeal you know the the

play13:58

curb herb pill comes from the street of

play14:00

course whenever people are driving by or

play14:01

people are coming to look at the house

play14:03

they they want to be proud of what it

play14:04

looks like from the street what everyone

play14:05

else sees but on the back of the house

play14:08

there ain't nothing back here no one's

play14:09

going to see it it's going to do its job

play14:11

it's going to be a door functioning door

play14:13

and it'll work for the back door we've

play14:15

installed the HVAC rough and the

play14:18

plumbing rough in and the electrical

play14:20

rough in so as you can see we have HVAC

play14:23

Ducks right there over here we have some

play14:25

Plumbing pipes we have some electrical

play14:27

wires this is going to be the kitchen so

play14:29

you have the water supply lines the sink

play14:32

drain lines um electrical everywhere

play14:35

electrical plugs for the refrigerator

play14:38

allow outlet boxes then up here you have

play14:40

these blue deals it's going to be the uh

play14:42

disc lights which are referred to as can

play14:45

lights but they don't really have a can

play14:46

anymore they're just like a disc LED

play14:48

disc so all of the electrical rough in

play14:52

agac work is done I'm not really making

play14:53

a video specifically for that because

play14:55

it's not too interesting part of the

play14:57

build um it's not worth making a video

play14:59

on but that is done so the cost for this

play15:01

part of the build was the windows

play15:04

material the 10 windows cost $5,000

play15:08

975 the front door cost

play15:13

$2,863 the back door cost

play15:16

$546 the sighting material which

play15:18

consisted of all the Hardy lap sighing

play15:21

um the fascia the S boards all that cost

play15:26

$6,595 and the labor to install all of

play15:29

that the doors the windows and the

play15:31

siding the same contractor did it and I

play15:33

paid him

play15:35

$475 now that uh we have the rough end

play15:38

done all the the siding and the coris is

play15:40

done all the electrical HVAC and the

play15:44

plumbing is done on the inside we can

play15:46

proceed with next will be the on the

play15:48

inside will be the insulation where I'm

play15:50

going to do spray foam insulation so

play15:52

stay tuned for that video that'll be the

play15:53

next video then on the exterior I'm

play15:55

going to be doing a standing seam metal

play15:57

roof um I'm not sure which video will

play15:59

come first but make sure to subscribe so

play16:01

you don't miss out on either one of

play16:02

those thanks for watching

Rate This

5.0 / 5 (0 votes)

相关标签
Home ConstructionFiber CementBlack AluminumWindows InstallationDoor InstallationSiding TechniquesDIY ProjectLong-term RentalQuality UpgradeHome ExteriorBuilding Process
您是否需要英文摘要?