TLDRThe Commission on Audit's report highlighted the ineffective implementation of the National Greening Program (NGP) by the Department of Environment and Natural Resources (DENR) from 2013 to 2015. Issues like poor tree monitoring, animal damage, and the planting of trees in unsuitable or private lands plagued the program. Despite efforts to replant and monitor trees, challenges such as road widening and lack of coordination with local governments resulted in significant tree losses. The report calls for better planning, protection, and long-term maintenance of planted areas to ensure the survival of trees.

Takeaways

  • 🌳 The COA reported that from 2013 to 2015, the DENR did not have an effective system for implementing the National Greening Program (NGP).
  • 🌱 In Barangay Langkaan, Dasmariñas, Cavite, around 2,000 trees were said to be planted, but issues arose regarding their survival.
  • 🐂 The trees planted in Sitio Humayao in 2011 were destroyed by animals like cows and carabaos, as there was insufficient protection for the seedlings.
  • 👎 The DENR was criticized for lacking proper monitoring and care of the trees, especially during the critical first three years of growth.
  • 💧 Some efforts were made for monitoring and watering the trees, but funding for maintenance was inconsistent, affecting the program's success.
  • 🚧 A road-widening project by DPWH resulted in the destruction of trees planted in certain areas, including Barangay Kabuko, Cavite.
  • 🏞️ Due to the lack of available public land for planting, some trees were planted in private lots, posing a risk of future removal.
  • 🌡️ Many trees died because they were planted during the dry season, further highlighting the need for better timing and planning in the program.
  • 🪵 In Barangay Kabuko, some residents illegally cut trees like ipil-ipil for profit, undermining the goals of the NGP.
  • 📊 Forest Foundation Philippines doubted the DENR's reports, emphasizing that the true measure of success is the survival of the trees after three years, not just the quantity planted.

Q & A

  • What was the main issue identified by the Commission on Audit (COA) regarding the National Greening Program (NGP) from 2013 to 2015?

    -The COA report revealed that the Department of Environment and Natural Resources (DENR) lacked an effective and efficient system for implementing the National Greening Program (NGP) during this period.

  • What happened to the trees planted in Barangay Langkaan, Dasmariñas, Cavite, under the NGP?

    -The trees planted in Barangay Langkaan were reportedly destroyed or eaten by animals, while others died due to inadequate care, particularly from livestock like cows and carabaos.

  • What specific challenges did the DENR face in monitoring and maintaining the trees planted under the NGP?

    -The DENR faced challenges such as the destruction of planted trees by animals and insufficient monitoring, especially during the critical first three years of tree growth, which are vital for the survival of the plants.

  • How did the local government of Dasmariñas respond to the problem of animals destroying the trees?

    -The local government of Dasmariñas passed an ordinance in 2015 that required animals to be tied up to prevent them from damaging the planted trees.

  • Why were many of the trees planted in Cavite destroyed by road widening projects?

    -A lack of coordination between the DENR and the Department of Public Works and Highways (DPWH) led to trees being planted along roadsides, which were later destroyed by road widening projects.

  • What problem did Barangay Kabuko face with regards to planting sites under the NGP?

    -Barangay Kabuko had limited planting areas, which led them to plant trees along roadsides and private lots. This posed a risk to the survival of the trees, as they were more susceptible to being cut down during road projects.

  • How does the NGP define appropriate planting areas for trees?

    -The NGP specifies that trees should be planted on public land, with careful consideration of the site's suitability for tree growth and the establishment of forests.

  • What measures did the DENR take to prevent the cutting of roadside trees under the NGP?

    -The DENR instructed its field offices to limit tree planting along roadsides and instead focus on planting in mountains and coastal areas to avoid the trees being cut down for road development.

  • Why did many trees planted during the summer season under the NGP die?

    -Many trees planted during the summer season died because they were not properly watered and maintained, a common issue raised in several areas participating in the NGP.

  • What was the main criticism of the NGP from the Forest Foundation Philippines?

    -The Forest Foundation Philippines criticized the NGP for focusing too much on the number of trees planted rather than ensuring the survival of the trees over the critical first three years.

Outlines

00:00

🌳 Challenges in Implementing the National Greening Program (NGP)

The Commission on Audit (COA) reported that from 2013 to 2015, the implementation of the National Greening Program (NGP) by the Department of Environment and Natural Resources (DENR) was ineffective. The report highlights discrepancies in the number of trees planted, with issues in the Langkaan area in Dasmariñas, Cavite. It was noted that the trees planted in 2011 were either destroyed or eaten by animals. Poor maintenance, especially in the first three years of planting, and lack of funding for monitoring contributed to the failure of the program. Local authorities like the barangay officials tried to mitigate the impact by tying animals to prevent them from damaging the trees. However, a lack of coordination between DENR and the Department of Public Works and Highways (DPWH) led to planted trees being affected by road widening projects, undermining reforestation efforts.

05:01

🌱 Replanting and Relocation Efforts Amid Challenges

Due to limited planting sites, the barangay planted trees along roadsides, which eventually led to their removal because of road widening projects. The DENR was criticized for selecting inappropriate locations for planting, which were not suitable for tree growth and survival. There were efforts to replant dead trees, with barangay officials trying to maintain them, but many trees were planted on private lots, which put them at risk. Moving forward, DENR aimed to focus planting in suitable areas such as mountains and coastal regions instead of roadsides. The Barangay Kabuko faced problems such as residents illegally cutting ipil-ipil trees for profit. The report also mentioned the issues with maintaining the planted trees in General Trias Sports Park, as the number of surviving trees fell short of the target, with several areas still overgrown and lacking proper care.

Mindmap

Keywords

💡National Greening Program (NGP)

The National Greening Program (NGP) is a reforestation initiative by the Department of Environment and Natural Resources (DENR) aimed at planting trees across the Philippines. It plays a central role in the video, with discussions on the effectiveness of its implementation and challenges like lack of monitoring and tree survival rates. The program's goal is to enhance the country's forest cover and combat climate change.

💡DENR (Department of Environment and Natural Resources)

The DENR is the government agency responsible for managing the Philippines' environment and natural resources. In the video, the DENR is criticized for failing to properly implement and monitor the NGP. Issues such as trees being destroyed by animals or development projects are highlighted as shortcomings of the agency's oversight.

💡Barangay

A Barangay is the smallest administrative unit in the Philippines, akin to a village or community. The video frequently mentions Barangays such as Langkaan and Kabuko, which were involved in the tree planting efforts under the NGP. However, these communities faced challenges like animal interference and land limitations, affecting the program's success.

💡Tree Planting

Tree planting is a central activity of the NGP, with the goal of restoring forests by planting various species of trees. In the video, it is reported that thousands of trees were planted, but many did not survive due to factors such as poor monitoring, lack of maintenance, and interference from animals.

💡Mahogany

Mahogany is one of the tree species mentioned in the video that was planted as part of the NGP. However, many of these trees did not survive due to destruction by animals like cows and carabaos. This highlights the broader issue of ensuring that the planted trees thrive after initial planting.

💡Penro (Provincial Environment and Natural Resources Office)

Penro is the provincial branch of the DENR responsible for overseeing local environmental programs. The video discusses the role of Penro in implementing the NGP in areas like Humayao Road. However, their efforts were hampered by external factors such as animal interference and road widening projects.

💡Monitoring

Monitoring is a key issue in the video, with the COA (Commission on Audit) reporting that a lack of proper monitoring by the DENR led to the failure of many tree planting efforts. Monitoring involves ensuring that the planted trees are maintained, protected from animals, and given proper care like watering and weed removal.

💡Road Widening Project

The road widening project refers to infrastructure developments that led to the destruction of trees planted under the NGP. In the video, trees planted along Governor's Drive were cut down to make way for road expansion, highlighting the conflict between environmental programs and urban development.

💡Seedlings

Seedlings are young trees that are planted in reforestation efforts like the NGP. The video mentions that many seedlings were distributed and planted, but their survival rate was low. The problem is partly attributed to poor care and environmental factors like animals eating or trampling the seedlings.

💡Forest Foundation Philippines

Forest Foundation Philippines is mentioned as an organization that questions the accuracy of the DENR’s reports on the success of the NGP. They emphasize that the number of trees planted should not be the primary metric of success, but rather the number of trees that survive after three years. This critique is central to understanding the shortcomings of the NGP.

Highlights

COA reported from 2013 to 2015 that there was no proper and effective system in implementing the National Greening Program (NGP) by the Department of Environment and Natural Resources (DENR).

In the NGP accomplishment report, 2,000 trees were said to have been planted in Barangay Langkaan, Dasmariñas, Cavite.

The DENR was criticized for lack of monitoring, as many planted trees were destroyed or eaten by animals, while others simply did not survive.

The local government of Dasmariñas implemented an ordinance in 2015 requiring animals to be tied up to prevent them from destroying plants.

The COA report highlighted a lack of coordination between the DENR and the Department of Public Works and Highways (DPWH), leading to trees being destroyed during road widening projects in Cavite.

The DENR planted 3,000 trees in Barangay Kabuko in 2011, but some were cut down due to a road widening project along Governor's Drive.

Barangay Kabuko planted trees along roadsides due to a lack of available planting sites, but some of these trees were at risk of being cut down because they were planted on private lots.

The NGP accomplishment report claimed that over a thousand trees were planted in General Trias Sports Park, but only a fraction survived.

Sports Park management has maintained the remaining trees by watering them and removing vines and weeds, but not all trees survived.

Forest Foundation Philippines expressed doubts about the accuracy of the DENR's tree planting reports, criticizing the focus on the quantity of trees planted rather than the number of trees that actually survived.

Critical monitoring was lacking during the first three years after planting, which are crucial for tree survival.

Private landowners cutting down ipil-ipil trees for profit became an issue in Barangay Kabuko, violating NGP regulations.

The COA noted that NGP funds allocated for monitoring and maintaining planted trees were insufficient or not properly utilized.

The DENR responded by adjusting its planting strategy, focusing more on planting in mountainous and coastal areas instead of along roadsides.

In some cases, the DENR planted trees during the dry season, contributing to their low survival rate.

Transcripts

play00:00

ayon sa report ng Commission on audit o

play00:02

coa mula 2013 hanggang 2015 walang

play00:06

maayos at epektibong sistema sa

play00:09

pagpatupad ng national greening program

play00:12

ang

play00:14

DNR sa accomplishment report ng ngp hal

play00:18

2000 puno raw ang itinanim Nil sa

play00:22

mahigit t ektaryang lupa sa Barangay

play00:25

langkaan do Dasmariñas Cavite

play00:30

isa raw sa mga pataniman ng provincial

play00:33

environment and natural resources office

play00:36

OP penro ay ang humayao Road Noong

play00:40

2011

play00:42

itinango ng Barangay dahil sila ang

play00:45

nagpan

play00:47

dito lahat ng puno ng Naran ay

play00:50

nanggaling sa Department of agriculture

play00:53

lahat na yan humayo Road lah makik

play00:57

nquest department agriculture ng

play01:00

seedlings na pantanim sa aming

play01:05

barangay itinuro ng Barangay na sa

play01:08

bahaging ito ng sityo humayao nagtanim

play01:11

ang DNR Noong

play01:14

[Musika]

play01:16

2011 wala ka ngang makikitang bakas ng

play01:19

tanim na puno mula sa

play01:22

ngp ang mga itinanim sinira at kinain ng

play01:27

mga hayop yung ibang itinanim hindi nila

play01:30

doon na mahogani papunta rin doon sa

play01:32

amin ah yun n ano rin yan Ganon din

play01:34

namatay din gawa nga rin ng mga bakat

play01:36

kalabaw na sinisira ng bakat kalabaw Ah

play01:40

yung iba kasi noong araw maraming mga

play01:42

hayop sa aming gala yung mga baka

play01:44

kalabaw maraming gala kahit merong

play01:47

trigard yung puno nasisira pa rin ng ano

play01:50

ng baka atsaka

play01:53

kalabaw ayon sa kaa nagkulang sa

play01:56

pagbabantay sa mga itinatanim na puno

play01:59

ang

play02:00

DNR lalo pa't kritial ang unang tatlong

play02:04

taon para mabuhay ang isang halaman

play02:07

Meron naman kaming time na ginaganap

play02:10

yung monitoring namin and then

play02:13

ah pag kami naman ay nagmo-monitor

play02:17

naka coordinate din kami sa mga barangay

play02:20

At yang

play02:22

ah sinasabing mayong mga nasira o Yun

play02:26

nga hindi masyadong nakaki or what

play02:28

namamatay kasi nga kung may Presence ng

play02:31

Uh mga hayop possible na maapakan kainin

play02:36

kaya kung kaya nilang kainin So yun mga

play02:38

talagang isa sa mga naging problema

play02:41

namin dito sa pagpapatupad ng ngp pero

play02:43

hindi naman lahat ng

play02:45

lugar kailangan May pondo para i-monitor

play02:49

at para i-maintain yung mga itinanim

play02:52

natin ano sa loob ng tatlong taon dapat

play02:55

binibisita mo ung mga itinanim mo

play02:57

tinatanggalan mo ng ung mga

play03:00

damo at iba pang tumutubo na maaaring

play03:02

makapatay dito ah kung kailangan bilig

play03:06

ah lalo na agag sobrang init dinidiligan

play03:08

din yan sa pagkaalam namin meron namang

play03:11

nailang pondo diyan yung DNR ano base sa

play03:14

mga budgets na naipakita sa amin hindi

play03:16

ko lang alam kung papaano At bakit

play03:19

walang pondo na naibibigay dito sa mga

play03:22

adaptors nitong

play03:24

mga planting areas under the national

play03:27

greening

play03:28

program bilang tugon ng lokal na

play03:30

pamahalaan ng dasmari sa problema

play03:33

nagpatupad sila ng ordinansa noong 2015

play03:37

na kailangang nakatali ang mga alagang

play03:40

Hayop para hindi makapanira ng

play03:43

halaman sa report ng kaa sa calabarzon

play03:46

region nagkulang daw ang DNR sa

play03:50

koordinasyon sa

play03:52

DPWH kaya sa huli ang mga itinanim na

play03:55

puno sa Cavite nasagasaan lang ng road

play03:58

widening project

play04:01

sa ulat ng penro noong nakaraang taon

play04:04

nasa 3000 ang puno na naitanim sa

play04:07

barangay kabuko sa 1 Martires Noong

play04:11

2011 nabuhay daw ang mga tanim taliwas

play04:16

ito sa kaa report noong

play04:18

[Musika]

play04:20

2013 may mga naputol daw na puno sa road

play04:23

widening project governor's drive

play04:28

2011 sa tabing kalsada na lang kasi

play04:31

nakapagtanim ang barangay kabuko dahil

play04:34

pribado ang mga bakanteng lote sa

play04:37

Barangay kasi po Ma'am Wala pong kaming

play04:40

area na pagtataniman ng mga puno kaya

play04:44

yung mga tabing daan ang aming

play04:46

tinataniman hindi rin naman namin kasi

play04:48

Ma'am alam kung kailan ang Road

play04:50

widening iyan kasi sa totoo lang

play04:55

kung masasab gusto ko ah kung pwede kong

play04:58

sabihin yan ang isang naging problema sa

play05:01

Cavite talagang kulang na kami sa mga

play05:03

planting sites so Itong mga Road ses na

play05:06

sa aming assessment ay pwede pang tamnan

play05:10

pero at least pinipili din namin hindi

play05:12

basta-basta magtanim ka na

play05:15

magtanim ang mga punong namatay

play05:18

pinalitan naman daw ng Barangay gaya

play05:21

niyang mahan e eh kami ho ang may tanim

play05:24

nian at saka yung mga akasya rito simula

play05:26

po sa boundary ng tanawan sa hanggang sa

play05:30

boundary namin dito sa Barangay San

play05:32

Agustin may mga tanim po kami

play05:37

diyan ang problema itinanim sa pribadong

play05:41

lote ang ibang mga puno kaya nanganganib

play05:44

din itong

play05:45

maputol nakasaad sa ngp na kailangang

play05:49

pampubliko Ang lupang tataniman ng mga

play05:52

puno dapat ang unang pag-iisipan ay yung

play05:55

lugar kung saan tayo magtatanim Ano yun

play05:58

ang first consideration Saan ba tayo

play06:00

magtatanim Ito ba ay ah angkop na

play06:03

palakihan at tubuan ng ng puno o

play06:06

magkaroon ng Gubat kung hindi Hwag tayo

play06:08

doon magtanim ano kasi nagsasayang lang

play06:10

tayo ng pera ng tao pera ng gobyerno at

play06:13

at pawis ng mga tao para maiwasan na

play06:17

yung pagpuputol nagkaroon tayo ng

play06:18

instruction sa field offices natin as

play06:20

much as possible lilimitahan na natin

play06:22

yong pagtatanim ng puno along Road sides

play06:25

no dadalhin na natin yung pagtatanim ng

play06:27

puno doon sa ating mga kabundukan or

play06:29

even d sa Coastal

play06:33

areas sinit rin ng kaa ang pagkamatay ng

play06:37

mga puno dahil itinanim ito sa panahon

play06:40

ng tag-init

play06:42

problema rin sa Barangay kabuko ang

play06:45

pagpuputol ng mga residente ng puno ng

play06:48

ipil-ipil para

play06:51

pagkakitaan tulad ng mga kahoy na ito na

play06:53

nakumpiska ng mga tanod nitong

play06:57

Hunyo labag sa batas ang magputol ng

play07:02

puno batay rin sa ngp accomplishment

play07:05

report mahigit is libong puno ang

play07:08

naitanim sa mahigit dalawang ektaryang

play07:11

lupa ng General Trias sports Park kasi

play07:15

ito naman very evident naman na wala

play07:16

naman 2 hectares Ong area eh so hindi ko

play07:20

alam kung paano nila ni-report basta

play07:22

kami sumuporta lang doon at nag

play07:25

nag-request kami ng mga seedlings na

play07:26

binigay naman nila kaya lang

play07:29

katulad nga ng sabi natin na hindi lahat

play07:31

nag-survive

play07:32

sa aming pagbisita wala pang is libo ang

play07:37

puno na nasa sports

play07:39

Park may espasyo sa sports Park na

play07:42

walang tanim masukal na rin ang

play07:45

bakanteng lote ah sa ngayon po kasi

play07:49

eh araw-araw po ang pag-ulan kaya po

play07:52

mabilis ang ang ang pag ano ng damo pero

play07:55

Yan po ay aming nililinis naman simula

play07:58

po nung nag tree planting mine-maintain

play08:00

po namin ang mga puno po dito sa

play08:03

pamamagitan ng pagdidilig ng

play08:09

halaman inaalisan po ng mga baging sa

play08:12

ilalim para po Patuloy ang pagyabong ng

play08:14

mga halaman

play08:17

[Musika]

play08:23

dito inaalagaan naman daw ng sports park

play08:27

ang mga natirang puno rito

play08:30

sa kabuuan ng report ng ngp sa Cavite

play08:33

Noong 2011 nakapagtanim daw ng halos 100

play08:38

at

play08:39

54 puno ang DNR sa higit t ektarya ng

play08:44

lupa sa

play08:46

probinsya hindi naniniwala ang forest

play08:49

foundation Philippines sa report na ito

play08:52

ang sa isip nila Kapag nagtanim sila ng

play08:56

madaming ah Punla madaming seedlings yun

play09:00

na ang National greening program naging

play09:03

paramihan ng maitatanim sa paramihan ng

play09:05

lugar Hindi po paramihan ng ng seedlings

play09:08

na Itatanim kundi paramihan ng nabubuhay

play09:12

ng seedlings pagkatapos ng tatlong taon

play09:15

ganun po yung batayan namin

Rate This

5.0 / 5 (0 votes)

相关标签
National GreeningTree PlantingEnvironmental IssuesCaviteDNRRoad WideningAudit ReportDeforestationPublic PolicyLocal Ordinance
您是否需要英文摘要?