TUTORIAL SURPAC NIKEL LATERIT PART 1 - DISPLAY SURFACE, CREATE DTM, PENJELASAN DATA GEOLOGI

NESW CHANNEL
15 May 202108:28

Summary

TLDRIn this video, the host walks viewers through a project focused on calculating the volume of laterite nickel ore using advanced software. The process involves exploring data from drilling, surface surveys, and geotechnical information, as well as visualizing the results through 3D displays. Viewers are guided step-by-step on how to manage project data, create contours, and analyze ore quality. The video also offers practical insights into creating accurate volume calculations for high-grade and low-grade nickel ore, with useful data files provided for further exploration.

Takeaways

  • ๐Ÿ˜€ The video introduces a project on the exploration and calculation of nickel laterite volume.
  • ๐Ÿ˜€ The project involves using software to analyze and display the results of nickel ore data.
  • ๐Ÿ˜€ The video highlights the difference in nickel ore quality, marked by varying colors and grades like high-grade and low-grade.
  • ๐Ÿ˜€ A key part of the project is the calculation of ore volume and its tonnage based on its grade and quality.
  • ๐Ÿ˜€ The video emphasizes using specific datasets like boring data, lithology, and survey data for accurate ore analysis.
  • ๐Ÿ˜€ A walkthrough of setting up a project in software is provided, showing how to import and connect data.
  • ๐Ÿ˜€ The project relies on multiple types of data, such as borehole depth, XYZ coordinates, and lithology types.
  • ๐Ÿ˜€ The software used allows for creating contour intervals and other visualizations of the survey data.
  • ๐Ÿ˜€ There are mentions of handling data formats like CSV, DXF, and other file types during the project setup.
  • ๐Ÿ˜€ The video discusses the process of designing and displaying 3D models of the ore bodies and volume calculations.
  • ๐Ÿ˜€ The video concludes with a reminder to subscribe for future updates and more videos on similar projects.

Q & A

  • What is the main focus of the project discussed in the video?

    -The main focus of the project is the exploration and volume calculation of nickel laterite deposits using geological data and specialized software.

  • Which software is used for processing the geological data in this project?

    -The specific software used for processing the data is not mentioned by name, but it is a software designed for handling geological data, likely used to visualize and calculate ore volumes.

  • What types of data are required for the project?

    -The project requires several types of data, including borehole data (such as coordinates, depth, and lithology), survey data, and DXF files for designing the geological models.

  • How is the volume of the nickel laterite ore calculated?

    -The volume is calculated by using the software to create 3D models based on the data. The software helps in displaying and analyzing the oreโ€™s grade and volume, allowing for an estimation of its tonnage.

  • What is the significance of creating geological models in this project?

    -Creating geological models is crucial for visualizing the deposit's size, grade, and structure, which helps in accurately calculating the volume and understanding the potential of the nickel deposit.

  • What does the video suggest about the role of data string in the project?

    -The video shows that data strings, once imported, are used to visualize the project area. These strings are essential for displaying the borehole data, which is integral to creating accurate models and calculations.

  • What is the purpose of contouring in the project?

    -Contouring is used to refine the volume estimation by creating detailed intervals that help visualize the distribution of ore, including its grade and thickness. This step enhances the accuracy of the final model.

  • How does the software help in visualizing the geological data?

    -The software helps visualize the geological data by displaying borehole information, creating 3D models of the deposit, and allowing users to view various attributes of the ore, such as its grade and volume.

  • What does the video mention about the importance of updating the model?

    -The video emphasizes that updating the model is important for incorporating new data and refining the calculations, ensuring that the project's estimates remain accurate as more information becomes available.

  • What is the final outcome of the project after completing all steps?

    -The final outcome is a refined 3D model displaying the volume and grade of the nickel ore, which helps in estimating the tonnage and determining the economic potential of the deposit.

Outlines

plate

This section is available to paid users only. Please upgrade to access this part.

Upgrade Now

Mindmap

plate

This section is available to paid users only. Please upgrade to access this part.

Upgrade Now

Keywords

plate

This section is available to paid users only. Please upgrade to access this part.

Upgrade Now

Highlights

plate

This section is available to paid users only. Please upgrade to access this part.

Upgrade Now

Transcripts

plate

This section is available to paid users only. Please upgrade to access this part.

Upgrade Now
Rate This
โ˜…
โ˜…
โ˜…
โ˜…
โ˜…

5.0 / 5 (0 votes)

Related Tags
Nickel MiningOre CalculationMining SoftwareVolume ModelingGeologyMining IndustryProject GuideData ProcessingHigh-Grade OreExplorationEngineering