Sering lihat di jalan tapi tidak tau fungsinya. LBS (Load Break Switch) Manual
Summary
TLDRThe video script details a day in the life of workers at Kintamani, Bali, conducting maintenance on a Load Break Switch (LBS). The team faces a traffic jam due to the manual work required for the LBS. They explain the process of opening the LBS, using a bypass jumper, and the importance of safety measures. The workers demonstrate the use of tools like impact machines and insulating gloves. They also discuss the LBS's role in separating and connecting electrical currents, highlighting its function as a switch. The script includes a light-hearted moment with a worker joking about the abundance of fallen oranges at the worksite. The team concludes by reconnecting the LBS to the network, ensuring a safe and efficient operation.
Takeaways
- ๐ง The video script describes a maintenance job for an LBS (Load Break Switch) in Kintamani, involving manual work and bypass installation.
- ๐ A report from the LBS area indicates a blockage, and the team is working to clear it without causing inconvenience to customers.
- ๐ ๏ธ The team successfully opened the LBS after installation, using a 'jumper by' method, indicating a lack of smoothness in the LBS operation.
- ๐ The script mentions the use of a 'jumper' and 'Ho' (possibly a tool or technique) for disconnecting and reconnecting the LBS.
- ๐๏ธ The work environment includes a lot of citrus orchards, with many fallen fruits, which adds a local context to the job site.
- ๐ทโโ๏ธ Safety is emphasized, with instructions to monitor and instruct workers on the job to ensure they are safe, especially when working at heights.
- ๐งค The use of gloves and isolation methods is mentioned, indicating the importance of personal protective equipment during the maintenance work.
- โ๏ธ The script explains the function of the LBS as a device to separate and connect electrical current, similar to a switch.
- ๐ The maintenance process involves spraying 'Prince' or anti-arcing liquid on moving parts to ensure smooth operation and prevent arcing.
- ๐ The script also describes the reconnection process, ensuring that the LBS is safely and correctly reconnected to the network after maintenance.
Q & A
What is the main task being discussed in the script?
-The main task being discussed is the maintenance work for a Load Break Switch (LBS) in Kintamani.
What is the issue with the LBS that requires maintenance?
-The issue with the LBS is that it is causing a blockage or congestion, which is affecting the service.
What is the purpose of the Bypass mentioned in the script?
-The Bypass is used to bypass the LBS during maintenance to ensure that the service is not interrupted for customers.
What safety measures are being taken during the maintenance?
-Safety measures include using gloves, ensuring proper supervision of workers, and using methods like remote work to avoid direct contact with high voltage.
What is the role of the orange-colored part in the LBS?
-The orange-colored part is the arm of the isolator, which is part of the manual operation of the LBS.
What does the term 'Ho' refer to in the context of the script?
-The term 'Ho' refers to the use of a remote method or tool, possibly a remote control or a pole, to handle the LBS safely.
Why is the 'Prince' or anti-arc liquid being used during the maintenance?
-The 'Prince' or anti-arc liquid is used to clean and protect the moving contacts of the LBS to ensure proper operation and prevent arcing.
What is the significance of the yellow-colored part mentioned in the script?
-The yellow-colored part is part of the installation and is mentioned in the context of the workers being careful not to damage it during the maintenance process.
What is the function of the LBS as described in the script?
-The LBS functions as a switch to separate and connect electrical current, similar to a circuit breaker.
What are the two components of the LBS manual mentioned in the script?
-The two components of the LBS manual are the stationary contacts (diam) and the moving contacts (bergerak).
How is the LBS reconnected after maintenance?
-After maintenance, the LBS is reconnected by removing the Bypass jumper and ensuring that the contacts are properly aligned and functioning.
Outlines

This section is available to paid users only. Please upgrade to access this part.
Upgrade NowMindmap

This section is available to paid users only. Please upgrade to access this part.
Upgrade NowKeywords

This section is available to paid users only. Please upgrade to access this part.
Upgrade NowHighlights

This section is available to paid users only. Please upgrade to access this part.
Upgrade NowTranscripts

This section is available to paid users only. Please upgrade to access this part.