Kemijen Bergerak Subtitle Bahasa Indonesia
Summary
TLDRThe transcript covers a community discussion about construction issues in a district of Indonesia, focusing on corruption and poor building practices. There is frustration over inadequate materials and faulty construction in a public facility (MCK), with concerns that it could endanger residents. The community wants to report the responsible parties, and seeks official documents to investigate the project. There's a plan to monitor and advocate for improvements, involving local officials and contractors, with an emphasis on transparency and accountability. The dialogue reflects a push for citizen involvement in public oversight.
Takeaways
- 🛠️ There has been a corruption issue in the community involving a 120 million Rupiah budget for development projects.
- 👀 The community is actively monitoring construction projects, including those in Kemijen, which have faced setbacks and rejection due to poor quality.
- 🚧 Concerns were raised about the quality of a public restroom (MCK) project, as leaks were detected in the structure.
- 📝 The community is seeking support to access data and information from the local government to improve monitoring of ongoing projects.
- 🏗️ A formal request has been submitted to the city officials to obtain documents related to the MCK project and to ensure compliance with regulations.
- 📊 Discrepancies were found between the original construction plans and the materials used, such as changes in the size of reinforcement bars, which could impact the building's durability.
- 📣 The community is determined to take action and report any irregularities in the construction projects to the authorities.
- 👥 A meeting is scheduled between the local government, construction consultants, and the community to address the issues with the MCK project.
- 🔍 The community’s involvement in monitoring the projects has been officially acknowledged, marking a positive change in how citizen oversight is perceived.
- 🔧 The goal is to ensure that public infrastructure projects meet the necessary standards and are beneficial to the residents, preventing future issues and maximizing their lifespan.
Q & A
What issue regarding corruption is highlighted in the transcript?
-The speaker mentions a case of corruption involving 120 million in a specific kelurahan (village) in Indonesia over the past two years.
What concern is raised about the construction in Kemiren?
-The speaker expresses concern that the construction in Kemiren is substandard and has been rejected due to poor quality.
What problem is related to the community’s sanitation facility (MCK)?
-There are issues with leaks in the MCK facility, particularly from the columns, which may hinder the functionality of the sanitation system.
How is the community involved in monitoring the construction project?
-The community is involved in monitoring the project by reporting issues to officials and seeking access to construction data through intermediaries like local representatives and consultants.
What are the risks mentioned regarding the MCK structure near the sea?
-The speaker mentions that due to unstable soil and strong winds near the sea, there is a risk that the poorly constructed MCK could collapse, posing a danger to the community.
What is the role of the consultants and contractors in this situation?
-The consultants and contractors are responsible for overseeing the construction, but the community suspects they are not meeting the required standards and are calling for changes.
What action has the community taken to address the construction issues?
-The community has sent a letter to local officials requesting documentation about the construction and is preparing to follow up with further action, including filing complaints if necessary.
Why is the community dissatisfied with the quality of construction materials?
-The community is frustrated because smaller diameter steel bars (6mm instead of the specified 8mm) were used in the construction, raising concerns about the integrity and durability of the structure.
How has the community’s monitoring been recognized by local authorities?
-Local authorities, including the dtkp and bawasda, have acknowledged the community's role in monitoring the project, which is significant because the community was previously regarded as interfering with government projects.
What is the community’s main concern moving forward with the project?
-The community’s main concern is ensuring that the project is completed with the correct materials and standards to avoid further issues and that their involvement in monitoring is taken seriously by the authorities.
Outlines
Этот раздел доступен только подписчикам платных тарифов. Пожалуйста, перейдите на платный тариф для доступа.
Перейти на платный тарифMindmap
Этот раздел доступен только подписчикам платных тарифов. Пожалуйста, перейдите на платный тариф для доступа.
Перейти на платный тарифKeywords
Этот раздел доступен только подписчикам платных тарифов. Пожалуйста, перейдите на платный тариф для доступа.
Перейти на платный тарифHighlights
Этот раздел доступен только подписчикам платных тарифов. Пожалуйста, перейдите на платный тариф для доступа.
Перейти на платный тарифTranscripts
Этот раздел доступен только подписчикам платных тарифов. Пожалуйста, перейдите на платный тариф для доступа.
Перейти на платный тарифПосмотреть больше похожих видео
FILM PENDEK ANTI KORUPSI " GRATIFIKASI "
૨૪૬ ગામના વડીલો મળીને રોજગાર અને વિકાસ વિશે PM ને મળવા..... ચૈતર વસાવા
Internal Affairs: Protecting the Integrity of the Badge
Wirtschaftsminister Aiwanger zum Bürgerentscheid gegen Windräder | BR24
Muddyach Bola Pimpri-Chinchwad : भ्रष्ट्राचाराच्या आरोपांवर भाजपचं उत्तर काय? मविआच्या आरोपांत तथ्य?
Rapat Kerja, 2 Maret 2020
5.0 / 5 (0 votes)