Ilmu Ukur Tanah Basic (Part 2)
Summary
TLDRThe video script discusses various measurement techniques and tools used in civil engineering and surveying. It covers the conversion of grades to decimals, direct and indirect distance measurements, and the use of scales in map readings. The script also introduces different surveying equipment such as tape measures, total stations, and GPS devices. It explains practical applications like contour mapping and land leveling, emphasizing the importance of accurate measurements in engineering projects.
Takeaways
- 😀 The script discusses converting measurements from one unit to another, specifically from grades to centimeters and vice versa.
- 📏 It mentions the use of specific formulas to calculate distances, such as using tape measures and surveying tools like theodolites.
- 📐 The concept of map scales is explained, highlighting the difference between large and small scales and their applications.
- 🗺️ The importance of choosing the appropriate map scale based on the project's needs is emphasized.
- 🏗️ Civil engineering calculations are mentioned, including the use of scales in civil engineering to determine distances and sizes.
- 🔍 The script describes the use of surveying equipment like total stations and GPS for accurate measurements in the field.
- 🛠️ It provides examples of how these tools are used in real-world civil engineering projects, such as bridge height measurements.
- 📊 The process of converting field measurements to scale drawings is outlined, which is crucial for planning construction and land development.
- 📈 The script touches on the significance of contour lines and cross-sections in understanding land surfaces for engineering and construction purposes.
- 🔧 Practical applications of surveying and measurement tools are discussed, including their use in land surveying, road construction, and tunneling projects.
Q & A
What is the process of converting a grade value to its equivalent in degrees and percent?
-The process involves converting a grade value to degrees by subtracting the grade from 100 and multiplying the remainder by 100. Then, to convert to percent, multiply the decimal part by 100. For example, 255.3456 grade is converted to 255 degrees and 34.56 percent.
How do you calculate the distance using direct and indirect methods?
-Direct methods use measuring tapes, meter rods, and wheel measures with readings from surveyor's rods. Indirect methods involve using formulas based on readings from benchmarks and other surveying techniques.
What is the formula for calculating distance in surveying?
-The formula for calculating distance in surveying is the difference between the upper and lower readings multiplied by 100.
What are the differences between large and small scales in mapping?
-Large scale maps have larger numbers but are less detailed, while small scale maps have smaller numbers and cover more extensive areas with less detail.
How do you determine the scale of a map?
-The scale of a map is determined by comparing a distance on the map to the actual distance on the ground. For example, a scale of 1:1000 means 1 unit on the map represents 1000 units in reality.
What is the significance of the red line in the context of map scales?
-The red line is used to illustrate the difference between various map scales, showing how the level of detail changes with different scales.
How do you calculate the distance on paper for a given scale and actual distance?
-To calculate the distance on paper, you convert the actual distance to centimeters and then divide by the scale's denominator.
What is the purpose of using a total station in surveying?
-A total station is used for precise measurements in surveying, allowing for accurate distance, angle, and elevation measurements.
What is the difference between a digital level and a total station?
-A digital level is used for measuring vertical angles, while a total station is a more advanced instrument that combines distance measurement and angle measurement capabilities.
How is GPS used in surveying and civil engineering?
-GPS is used in surveying and civil engineering for positioning, mapping, and navigation. It provides accurate location data that can be used for various engineering tasks.
What is the purpose of contour lines in surveying?
-Contour lines connect points of equal elevation on the ground and are used to represent the shape of the terrain on maps. They are essential for understanding landforms and planning construction projects.
Outlines
📏 Conversion of Measurement Units and Introduction to Surveying Tools
This paragraph discusses the conversion of measurement units, specifically focusing on temperature scales. It explains how to convert a given temperature in degrees Fahrenheit to degrees Celsius and vice versa, using mathematical formulas. The speaker provides an example of converting 255.3456 degrees Fahrenheit to degrees Celsius, resulting in 34.56 degrees Celsius. Additionally, the paragraph introduces the concept of direct and indirect distances in surveying, with direct distances measured using tools like tape measures and wheel measures. The speaker also mentions the use of road signs for direct distance measurements. The paragraph concludes with an introduction to scale conversion in maps, explaining the difference between large and small scales and how they affect the level of detail in a map. The speaker provides examples of different scales and their corresponding map details.
🔍 Surveying Techniques and Tools in Civil Engineering
The second paragraph delves into the practical applications of surveying in civil engineering. It discusses the use of various surveying tools such as total stations and theodolites, highlighting their importance in tasks like measuring the height of structures and creating contour lines for land development. The speaker mentions personal experiences with using these tools, such as measuring a tower in South Sumatra in 2015. The paragraph also covers the use of GPS devices in surveying, including hand-held GPS units and geodetic GPS, which are used for various civil engineering tasks. The speaker describes how data collected from these devices can be transferred to a laptop for further processing and visualization. The paragraph concludes with a brief overview of surveying tasks such as creating cross-sections and calculating areas, which are essential for civil engineering projects. The speaker expresses a hope that the information shared will be beneficial and ends with a farewell message.
Mindmap
Keywords
💡Grade
💡Decimal
💡Surveying
💡Scale
💡Direct Distance
💡Indirect Distance
💡Total Station
💡Contour Line
💡GPS
💡Cross-Section
Highlights
Conversion of grade values to decimal form with an example of 255.3456 grade being converted.
Explanation of converting grade to a percentage by multiplying the decimal grade by 100.
Introduction to direct and indirect distances, with tools like measuring tapes and range finders for direct measurements.
Formula for calculating direct distance using the difference between upper and lower thread readings multiplied by 100.
Discussion on map scales, differentiating between large and small scales and their applications.
Practical example of scale conversion from a real-world measurement to a map representation.
Explanation of the ideal scale for civil engineering calculations, such as 1:11,000 where 1 meter on paper represents 11 meters on the ground.
Conversion of real-world measurements to map measurements using different scales, like 1:2500 and 1:250.
Demonstration of using total stations, a type of surveying instrument, for various civil engineering tasks.
Description of a total station used by first-semester students for surveying tasks.
Examples of field surveying work, including measuring the height of a tower in South Sumatra using a theodolite.
Introduction to the use of GPS devices in surveying and civil engineering, including handheld and geodetic GPS units.
Explanation of how survey data is connected to a laptop for further processing and mapping.
Discussion on contour lines and their importance in land surveying for understanding the terrain's surface.
Overview of land surveying techniques and their applications in civil engineering projects.
Introduction to cross-section and longitudinal section surveys, essential for civil engineering design.
Example of a closed polygon measurement, a common task in surveying and civil engineering.
Closing remarks, summarizing the key points and expressing hope for the usefulness of the information shared.
Transcripts
[Tepuk tangan]
Hai baik lanjutkan di tinggi untuk
contoh yang ketiga yaitu tulis nilai 255
point 3456 grade itu diubah kedalam
bentuk gizi penyelesaiannya adalah anda
ia mengalihkan dengan status esensi
great dalam setiap pengurangannya jadi
25 foin 3456 sisanya 255 Anda jadikan
grade kemudian Sisanya adalah 0,3 456
anda kalikan dengan 100 ya karena satu
great itu 100 CB kemudian sisanya lagi
0,56 dikali 100 centigrade sehingga Anda
ambil angkanya 255 great 34 CB dan 56 CB
untuk soal yang keempat Bisa Anda lihat
disini bahwa dari bentuk eh grade CG dan
sensitisasi grade Saya minta Anda
Tuliskan dalam bentuk desimal jawabannya
adalah e345 Anda simpan yaitu poinnya
berarti 67 Anda bagi dengan 100 kemudian
89 nya Anda bagi dengan Rp10.000 Disini
anda
kau operational in jadinya adalah tiga
empat lima poin 6789
Hai disini saya bicara mengenai jarak
atau distance jarak ada dua yaitu jarak
langsung dan tak langsung untuk jarak
langsungnya Anda menggunakan pita ukur
meteran dan rol meter dengan jarak
langsung menggunakan bacaan rambu ukur
Anda bisa mengetahui rumusnya seperti
ini untuk bacaan benang atas benang
Tengah benang bawah nanti saya ajarkan
pada praktikum perdana kita Anda bisa
save rumus disini bahwa jarak adalah
benang atas dikurang menang bawah dikali
100
Hai general sisa generalisasi peta skala
besar ke skala kecil seperti awal yang
saya bilang tadi bahwa skala besar yaitu
angkanya Tidak besar hanya saja skala
besar adalah Gambarnya terlalu detail ya
di sini anda bisa lihat ada enam gambar
skala 1 banding 10.000 adalah gambar
yang agak depan dibandingkan skala 1
banding 500 ribu rupiah
Hai Anda bisa lihat perbedaannya pada
Red Line atau garis merah ini ya jadi
peta mana yang bagus dalam hal ini skala
besar atau sekolah kecil jawabannya
adalah tergantung kebutuhan gitu
Hai skala di sini eh kita
hitung-hitungan dari Teknik Sipil
menggunakan hitungan dari skala-skala
yang baik atau ideal a-a-a-a dalah
Hai kalau yang baik itu berada dalam
arti
Hai tauhid adalah 1 banding 11 m di bumi
1 meter di kertas lima meter di bumi
lima meter di kertas hanya saja kita
tidak ada kertas lima meter yang akan
menggambarkan peta kita ini sehingga
dibentuklah yang namanya sekala sekala 1
banding 1000 status entrinya berapa
meter gitu jawabannya adalah satu senti
= 10 m jadi ditandai Tulis disini
dibantu dengan coret-coretan anda 10.000
itu berapa senti jadi dari sentiment Uju
m itu Anda naik atau Anda bagi dengan
seri berbagi dengan status kemudian satu
dibagi 100 dikali dengan Rp10.000
hasilnya satu senti = 10 m untuk kasus
yang kedua sekolah 1 banding 2500
artinya jika kita punya ukuran 30 meter
di lapangan berapa senti di kertas
Hai nah caranya adalah 30 meternya
meternya anda kalikan dengan senti dulu
meter ke centi berarti dikali 100 Iya 30
kali 100 Kemudian Anda bagi dengan
kekalahannya yaitu dibagi 2.500 Maka
hasilnya adalah 30 M adalah 1,2 senti di
kertas dengan skala 1 banding 2500
Hai Nah untuk yang soal selanjutnya
yaitu 1 banding 2500
Hai untuk ukuran empat meter di lapangan
berapa senti di kertas untuk skala
tersebut Anda menghitungnya dengan cara
meter ke centi itu dikali dengan 100 ya
berarti empat dikali 100 ya 4 dikali 100
dibagi dengan skalanya Nah untuk soal
yang berikutnya 1 banding 250 32 cm apa
M di lapangannya berarti 32 cm Anda bagi
dengan 100 anda kalikan dengan skala
yaitu satu banyak anda kalikan dengan 25
berarti hasilnya adalah 8 m Nah untuk
soal yang terakhir 1 banding 50 itu 40 m
8 berapa mm dikertas Anda bisa hitung
dengan cara 40 meter dikali dengan 1000
karena menjadi mm dikali dengan 1000
dibagi dengan 50 hasilnya adalah 800 mm
seperti itu Jadi bisa anda kalikan
sendirian
ajarin ulang agar anda Mahir menghitung
contoh alat ukur disini yaitu yang
sebelah kiri adalah gambar rambu ukur
yang sebelah kanan adalah theodolit nah
disini adalah contoh alat ukur yaitu
Waterpark ini adalah Waterpark eh
digital yang sebelah kiri adalah total
section merek layka dan sebelah kanan
adalah total station merek khai
Hai nah oh ini adalah total station yang
digunakan oleh mahasiswa semester 1
contohnya Ini juga eh Waterpark ini
adalah contoh total station merek yaitu
salah satunya merek yang ada dan pada
alat ukur kemudian gambar-gambar ini
adalah gambar-gambar pengukuran yang ada
di permukaan bumi yang langsung
menyentuh dengan obyeknya nya gambar
yang di bawah itu dikirim bawah yaitu
adalah gambar waterpark
Hai ini adalah pekerjaan-pekerjaan
desain rekayasa disini juga ada
pengukuran eh Tower ukuran Tower
hai menggunakan teodolit itu cukup di
sini ah Saya dulu pernah melakukan
melaksanakan pengukuran kelayakan dari
ketinggian suatu Tower yang ada di
Sekayu Sumatera Selatan ini saya lakukan
tahun 2015 ini contoh alat ukur yang
namanya eh total station ini pekerjaan
dari ini juga alatnya total station
namanya pekerjaan desain pekerjaan
teknik sipil pengerukan
Hai pengerukan Tanah ini juga membuat
di saluran air bisa jadi yang sebelah
kirinya adalah membuat terowongan ini
adalah contoh-contoh pekerjaannya
Hai ini adalah GPS
Hai ini GPS yang ini GPS hand held yang
ini adalah GPS geodetik ya Anda bisa
lihat Disini pekerjaan-pekerjaan dari
Hai Teknik Sipil atau trend surveying
Hai contoh alat-alatnya Dit ini tuh mual
di tanah liat
Hai ini adalah gambar pengukurannya jadi
dari pengukuran tadi disambungkan dengan
kabel data dimasukkan kedalam laptop
kemudian bisa digambar seperti ini
hasilnya salah satunya adalah garis
kontur garis kontur ini diperlukan untuk
mengetahui muka tanah eh selanjutnya
akan dilakukan galian dan timbunan
kemudian diatur er Abinya
Hai disini adalah materi ilmu ukur tanah
satu ya
Hai Anda bisa lihat Disini
Hai contoh pekerjaan survei rekayasa
atau long section seperti ini
Hai ini adalah penggambaran penggambaran
survei rekayasanya
Hai ini adalah cross-section dan ada
tiga potongannya potongan atau iritan
nya ini tegak irisan tegak potongan
memanjang
Hai ini lengkap dengan hitungan luasnya
Hai ini adalah pengukuran Polygon
tertutup
Hai nanti ini kita akan praktikum
kemudian ini contoh pekerjaan survei
rekayasa atau lengkung sederhana
Hai kisah nenek disini baik itu saja
yang bisa dapat saya sampaikan semoga
bermanfaat Sampai ketemu di lain waktu
wassalamu'alaikum warahmatullahi
wabarakatuh
Ver Más Videos Relacionados
How does land surveying work?
Theodolite - Measuring Angles
[TUTORIAL 1] DASAR MENGGUNAKAN TOTAL STATION TOPCON GM-101 SERIES | ANAK TEKNIK
Introduction, Methods and Applications - Hydrographic Survey - Advanced Surveying
MEASUREMENT AND EXPERIMENTAL TECHNIQUES | N Level | O Level | Pure Chemistry
Geo X. 46. Mencari & Menghitung Skala Peta
5.0 / 5 (0 votes)