Siding, Windows & Doors Installation (COST REVEALED!) | 60 Day Home Build Challenge!
Summary
TLDRIn this engaging home-building video, the creator shares their experience with the 23rd day of their second home build project. The focus is on installing siding, windows, and exterior doors. They use James Hardy fiber cement siding for its durability and water resistance, opting for a mix of lap and panel siding. The construction team faces challenges such as a cracked window, which the builder decides to cover due to the workers' hard labor and slim profit margins. The builder also emphasizes their choice of black aluminum windows from Ply Gem and a high-quality front door, which adds a significant cost but is expected to enhance the home's curb appeal and longevity. The video concludes with a look at the completed siding, windows, and doors, and a teaser for upcoming videos on spray foam insulation and a standing seam metal roof.
Takeaways
- 🏡 The home build project is on day 23, focusing on installing siding, windows, and exterior doors.
- 📦 James Hardy fiber cement siding is chosen for its durability, water resistance, and non-flammability.
- 🔨 The builder is using a combination of lap siding and panel siding for different sections of the house.
- 🧱 Half-inch OSB 716 is used for wall sheathing, which is stronger than cheaper alternatives.
- 🛠️ Scaffolding is utilized for installing siding, with a system that can be raised as work progresses upwards.
- 🖼️ Ply gem is the manufacturer for the black on black aluminum windows, chosen for their quality and appearance.
- 💰 The decision to upgrade windows and the front door adds to the cost, but is expected to improve the property's performance and curb appeal.
- 🚪 A high-quality front door is installed, costing significantly more than a standard door, to enhance the first impression of the house.
- 📏 The builder opted for an 8-inch fascia and a larger roof overhang for a more grand appearance.
- 🔩 The back door is a more economical choice, as it does not affect the curb appeal and is functionally sufficient.
- 🏗️ The construction process experienced delays due to heat, material shortages, and the need for extra shipments.
- 📈 The total cost for windows, doors, and siding materials is detailed, along with the labor costs for installation.
Q & A
What type of siding is being installed in the video?
-The siding being installed is called James Hardy fiber cement siding, which is neither wood nor vinyl but made of fiber cement.
What are the advantages of using fiber cement siding over wood or vinyl?
-Fiber cement siding is advantageous because it is fire-resistant, highly water-resistant, and generally stronger than wood or vinyl.
What is the name of the window manufacturer being used in the home build?
-The window manufacturer being used is Ply Gem.
What is the difference between the windows used in the last build and the current one?
-In the last build, black on white vinyl windows were installed. In the current build, black on black aluminum windows are being installed, which are more expensive but offer higher quality and better performance.
How much additional cost was there for upgrading the windows to black on black aluminum?
-The additional cost for upgrading to black on black aluminum windows was about $500 to $600.
What is the role of the OSB 716 in the construction process?
-OSB 716 is used for the wall sheathing, providing a stronger and more durable base for the walls compared to cheaper, more cardboard-style materials.
What is the issue with the window that was discovered during the build?
-A window was found to be cracked, which likely occurred during the installation process.
How does the builder plan to handle the broken window?
-The builder is considering talking with the subcontractor about the issue but is also prepared to cover the cost of the broken window if it amounts to a few hundred dollars, as they understand the small margins the installers work with.
What is the cost of the front door that was installed?
-The front door cost $2,863, which is a significant upgrade from a previous build where a $500 front door was installed.
What is the difference in the overhang size between this house and the builder's other house?
-This house has a 24-inch overhang, which is 8 inches larger than the 16-inch overhang on the builder's other house.
What is the next step in the construction process after the siding, windows, and doors are completed?
-The next step is to install spray foam insulation on the inside and proceed with a standing seam metal roof on the exterior.
What is the total cost for the windows, front door, back door, and siding material?
-The total cost for the windows was $5,975, the front door was $2,863, the back door was $546, and the siding material was $6,595.
Outlines
هذا القسم متوفر فقط للمشتركين. يرجى الترقية للوصول إلى هذه الميزة.
قم بالترقية الآنMindmap
هذا القسم متوفر فقط للمشتركين. يرجى الترقية للوصول إلى هذه الميزة.
قم بالترقية الآنKeywords
هذا القسم متوفر فقط للمشتركين. يرجى الترقية للوصول إلى هذه الميزة.
قم بالترقية الآنHighlights
هذا القسم متوفر فقط للمشتركين. يرجى الترقية للوصول إلى هذه الميزة.
قم بالترقية الآنTranscripts
هذا القسم متوفر فقط للمشتركين. يرجى الترقية للوصول إلى هذه الميزة.
قم بالترقية الآنتصفح المزيد من مقاطع الفيديو ذات الصلة
CHALLENGING Myself To Build A House In 60 Days!!
Framing My Next Rental Property | 60 Day Home Build CHALLENGE!!
The Foundation, Permits, Ordering Material | 60 Day Home Build CHALLENGE!
Revealing How Much it Cost to Build My First House for a Rental Property!!
The Cost To Build My Second Home Build! (FULL BUDGET BREAKDOWN)
How To Pressure Wash A House (Start To Finish)
5.0 / 5 (0 votes)