TLDRThis video script is an educational guide for the ML120 2x smart addressable fire alarm system. It covers essential pre-operation checks such as wire breakage, short circuits, and grounding issues. The video emphasizes the importance of resolving these problems before system operation. It outlines the specifications for the wiring, including the maximum length for 0.8 mm² and 1.5 mm² wire gauges. The script also discusses the process of identifying and fixing short circuits and grounding issues through project tracking and field reduction methods. Lastly, it explains how to perform voltage measurements for ground leakage, highlighting the acceptable voltage range and the significance of staying within specified tolerances to ensure system integrity.

Takeaways

  • 🔍 Conduct thorough checks for open circuits, short circuits, and ground leakage before operating the ML120 2x Smart Addressed Fire Alarm system.
  • 🛠 Ensure that the ring circuit wire used in the system is not longer than 1200 meters for a 0.8 mm² cross-sectional area, and not longer than 1500 meters for a 1.5 mm² cross-sectional area.
  • 🔌 Check for continuity and proper connections in the ring circuit wiring, including the screen wire, to avoid open circuit issues.
  • 🔍 Perform line checks to identify any open circuits by tracing the project and narrowing down the area with the fault.
  • 🔌 Ensure that there are no missing connections in the ring circuit wiring, as this indicates an open circuit that needs to be resolved.
  • 🔍 When checking for short circuits, verify that there is no direct connection between the positive and negative wires, the screen wire, and the earth wire in the circuit.
  • 🛠 If a short circuit is detected, connections need to be made to the control center to resolve the issue.
  • 🔌 In ground leakage checks, ensure that the positive and negative wires of the circuit do not touch water or ground through the ceiling, walls, or similar points.
  • 🔧 Correct any identified points where the wires are touching water or ground to prevent ground leakage.
  • 🔋 Measure the external voltage of the control center's 24V DC series with a measuring instrument, which should be within the range of 12.30 to 13.50 volts.
  • ⚠️ If the measured external voltage deviates more than 20 millionths from the specified range, it indicates a ground fault that needs to be addressed.

Q & A

  • What is the main topic of the video script?

    -The video script is about the installation and troubleshooting of an ML120 2x smart addressable fire alarm system.

  • What are the initial checks required before operating the fire alarm system?

    -Before operating the system, it is necessary to check for open circuits, short circuits, and ground leakage to ensure there are no issues.

  • What is the recommended cross-sectional area for the circuit wire used in the system?

    -The recommended cross-sectional area for the circuit wire is 0.8 millimeters for a maximum length of 1200 meters, and 1.5 millimeters for a maximum length of 100 meters.

  • What should be checked during the circuit installation?

    -During circuit installation, it is important to check for any missing connections, reversals of positive to negative and vice versa, and the presence of a screen cable in the circuit.

  • What does it mean if there is a missing connection in the circuit?

    -A missing connection in the circuit indicates a wire breakage, which is a problem that needs to be resolved.

  • How is a wire breakage or short circuit identified in the project?

    -Wire breakages or short circuits are identified by following the project and using a narrowing method to locate the faulty cable or connection point.

  • What checks should be performed during a short circuit inspection?

    -During a short circuit inspection, one should check for any shorts between the positive and negative, between the screen and the positive, and between the screen cable and the ground.

  • What is the acceptable voltage range for the external voltage measurement?

    -The acceptable external voltage range is between 12.30 to 13.50 volts, with a tolerance of plus or minus 20 millionths.

  • What does it indicate if the measured external voltage deviates more than the specified tolerance?

    -If the measured external voltage deviates more than the specified tolerance, it indicates a ground fault that needs to be corrected.

  • How is a ground leakage issue identified and resolved?

    -A ground leakage issue is identified by following the project and using a narrowing method to locate the cable or connection point with leakage. The identified points must be corrected.

  • What is the final call to action for viewers in the video script?

    -The final call to action is to subscribe to the channel for more information.

Outlines

00:00

🚒 Smart Addressable Fire Alarm System Installation

This paragraph outlines the training video for the installation of a smart addressable fire alarm system, focusing on the importance of preliminary checks before system operation. It emphasizes the need to ensure there are no short circuits, open circuits, or ground faults by conducting thorough inspections. The video provides technical specifications for the wiring, such as the required cross-sectional area and maximum length of the circuit wires. It also details the checks for continuity and screen wiring, and the troubleshooting process for identifying and resolving any faults, including the use of tracking and area reduction methods to pinpoint the location of issues.

Mindmap

Keywords

💡Smart Addressable Fire Alarm

A smart addressable fire alarm is a type of fire detection system that can identify the specific location of a fire within a building. In the video, it is the main subject, and the script discusses its installation and maintenance, emphasizing the importance of proper wiring and system checks to ensure its functionality.

💡Training Video

The script is for a training video, which is meant to educate viewers on a specific topic. In this case, the video is focused on the installation and troubleshooting of a smart addressable fire alarm system, providing step-by-step guidance and highlighting key points for attention.

💡Circuit Wire Gauge

The circuit wire gauge refers to the thickness of the wire used in electrical circuits, measured in millimeters or square millimeters. In the script, it specifies the wire gauge for the system, indicating that a 0.8 mm wire should not exceed 1200 meters in length, and a 1.5 mm² wire should not exceed certain lengths, which is crucial for ensuring the system's electrical integrity.

💡Short Circuit

A short circuit occurs when an unintended low-resistance path is created in an electrical circuit, which can lead to excessive current flow and potential damage. The script mentions checking for short circuits as part of the system's maintenance, to ensure there are no 'hat kopuk' or breaks in the circuit that could cause such issues.

💡Ground Fault

A ground fault is a condition where an electrical current unintentionally flows through a ground path. The script discusses the importance of ground fault detection, as it can indicate a potential safety hazard in the fire alarm system, and it must be corrected to ensure the system's reliability.

💡Wire Continuity

Wire continuity refers to the uninterrupted flow of electricity through a wire. The script emphasizes checking for wire continuity to ensure there are no breaks or faults in the system's wiring, which is essential for the proper functioning of the fire alarm.

💡Voltage Measurement

Voltage measurement is the process of determining the electrical potential difference between two points in a circuit. The script mentions using a measuring tool to check the external voltage value, which should fall within a specific range to indicate that the system is functioning correctly.

💡Troubleshooting

Troubleshooting is the process of identifying and resolving issues within a system. The script provides a detailed troubleshooting guide for the fire alarm system, including how to detect and fix short circuits, ground faults, and other potential problems.

💡Field Narrowing Method

The field narrowing method is a troubleshooting technique mentioned in the script, used to identify the specific location of a fault within a system. It involves progressively narrowing down the area of the system where a problem is occurring, which helps in efficiently locating and fixing issues like short circuits or ground faults.

💡System Control

System control refers to the management and operation of a system, ensuring it functions as intended. In the context of the script, system control involves checking the fire alarm's wiring, conducting tests for faults, and making necessary adjustments to maintain the system's performance.

💡Installation Check

An installation check is a process performed after setting up a system to verify that all components are correctly installed and functioning. The script describes various checks that need to be made during the installation of the fire alarm system, such as ensuring proper wiring and the absence of short circuits or ground faults.

Highlights

Before operating the system, it is necessary to check for open circuits, short circuits, and ground leakage and resolve any issues.

The loop wire used in the system should not exceed 1200 meters in length with a cross-sectional area of 0.8 mm².

For loop wires with a cross-sectional area of 1.5 mm², the maximum length should not exceed 1000 meters.

When performing wire break checks, it is important to inspect the plus and minus connections in the loop wiring and the screen wire connection.

If any of the connections are missing, it indicates a wire break that needs to be addressed.

Short circuit checks involve verifying the connections between plus and minus, plus and screen, and screen and ground in the loop wiring.

If a short circuit is detected, connections to the control center must be re-established.

Ground leakage checks require inspecting whether the plus and minus wires in the loop wiring are in contact with water or ground.

Any points of contact must be corrected if ground leakage is detected.

During ground leakage checks, the control center should provide energy, and the control panel's 24V DC series should be measured.

The external voltage value measured should be between 12.30 and 13.50 volts with a tolerance of ±20 millivolts.

If the measured value deviates more than ±20 millivolts, it indicates a ground fault that needs to be corrected.

To resolve ground leakage issues, the project should be followed up, and the area should be narrowed down to identify the cable or connection point causing the leakage.

The video provides a step-by-step guide for troubleshooting common issues in the installation of the ML120 2x smart fire alarm system.

The importance of proper wiring and connection checks is emphasized to ensure the system's reliability.

The video covers the technical specifications for the loop wire, including length and cross-sectional area requirements.

Troubleshooting steps include checking for wire breaks, short circuits, and ground leakage to maintain system integrity.

The video instructs on how to measure the external voltage to diagnose potential issues with the system.

Corrective actions are detailed for resolving detected issues, such as wire breaks and ground faults.

The instructional video aims to assist technicians in the proper installation and maintenance of the fire alarm system.

Transcripts

play00:00

abone ol

play00:01

bu ml120 2x akıllı adresli yangın alarm

play00:05

santralleri konusundaki eğitim videomuzu

play00:07

izlemektesiniz bu bölümde tesisat

play00:12

kontrolü ile ilgili bilgiler

play00:13

aktarılacaktır sistem çalıştırılmadan

play00:18

önce hat kopuk kısa devre ve toprak

play00:21

kaçağı kontrollerinin yapılması ve

play00:24

mutlaka sorunların giderilmesi

play00:25

gerekmektedir sistemde kullanılacak olan

play00:29

Çevrim kablosu kesiti 0.8 milimetrekare

play00:33

ise Çevrim hattının uzunluğu bin 200

play00:36

metre aşmamalıdır kullanılacak olan

play00:40

Çevrim kablosu kesiti bir buçuk

play00:42

milimetre kare ise Çevrim hattının

play00:45

uzunluğu mm metreyi aşmamalıdır bir

play00:50

sistemde hat kapı kontrolü yapılırken

play00:53

ama çevrim tesisatında artıran artıya

play00:57

dönüş eksilen eksiye dönüş ve çevrim

play01:00

tesisatında ekran kablosunu dönüş var mı

play01:03

kontrol edilmelidir Eğer bu dönüşlerden

play01:07

Herhangi bir yoksa hat kopuk demektir ve

play01:10

bu problemin giderilmesi gerekmektedir

play01:13

hat kopuk sorunun giderilebilmesi için

play01:16

proje üzerinden takip sağlanır ve alan

play01:19

daraltma yöntemi ile hat kopuk olan

play01:22

kablo veya bağlantı noktası tespit

play01:25

edilir

play01:27

çok kısa devre kontrolü yapılırken

play01:30

Çevrim tesisatında artı ile eksi arası

play01:34

eksiyle ekran tablosu arası artı ile

play01:37

ekran kablosu arası kısa devre var mı

play01:40

kontrol edilmelidir kısa devre sorunun

play01:44

var ise kesinlikle santrale

play01:46

bağlantıların yapılması gerekmektedir

play01:49

kısa devre sorunun giderilebilmesi için

play01:52

proje üzerinden takip sağlanır ve

play01:55

alanlar atma yöntemiyle kısa devre olan

play01:58

kablo veya bağlantı noktaları tespit

play02:00

edilir

play02:02

bu Toprak kaçağı kontrolünde ise Çevrim

play02:06

tesisatının artı ve eksi kablosunun

play02:08

kablo tavasına suya ve tona asma tavan

play02:13

ünitesinde ve benzeri noktaları teması

play02:16

varmı kontrol edilmelidir Eğer varsa

play02:19

teması olan noktalar mutlaka

play02:21

düzeltilmelidir bir toprak kaçan

play02:25

kontrollerinde santrale enerji verir

play02:28

santralin 24 ol dizisi harici besleme

play02:32

çıkışı artık elementi ile santral şasisi

play02:36

ağrısı dizisi Voltaj ölçümü yapılır ölçü

play02:41

aletiyle ölçülecek olan disi volt değeri

play02:44

12.30 mont giysi ile 13 buçuk kondisi

play02:49

aralığında olmalıdır Bu değerinin artı

play02:52

eksi 20 milyon Lisesi sapma payı vardır

play02:56

Eğer belirtilen artık 20 mi Limon dizisi

play03:00

sapma payından fazla

play03:02

Az önce tüm sonucu çıkarsa Toprak hatası

play03:05

var demektir ve bu sorunun düzeltilmesi

play03:08

gerekmektedir Toprak kaçağı sorunun

play03:12

giderilebilmesi için proje üzerinden

play03:14

takip sağlanır ve alan daraltma

play03:17

yöntemiyle Toprak kaçağı olan kablo veya

play03:20

bağlantı noktası tespit edilir

play03:23

abone ol

Rate This

5.0 / 5 (0 votes)

相关标签
Smart AlarmsInstallation GuideTroubleshooting TipsElectrical SafetyFire PreventionTechnical TrainingCircuit ChecksWire TestingSystem MaintenanceSafety Protocols
您是否需要英文摘要?