The Rail Revolution That Never Was
Summary
TLDRThis script tells the story of Hungarian Railways' innovative yet underappreciated efforts in the late 1980s and 1990s to revolutionize European passenger rail with the BDV motor 414 series and BV M trains. Despite surpassing other European rail systems in innovation, economic challenges and political shifts led to a decline, with only a few trains produced. The script contrasts Hungary's setbacks with the Czech Republic's successful rail development, highlighting the potential lost due to lack of investment and strategic planning.
Takeaways
- ๐ The Hungarian Railways were once at the forefront of innovation in European rail, developing trains and operational plans that were groundbreaking for their time.
- ๐ In the mid-1980s, Hungary's suburban rail system was outdated, with manual doors and low speeds, but this changed with the introduction of the BDV motor 414 series, which featured automatic doors and state-of-the-art technology.
- ๐ ๏ธ The BDV motor 414 series was a hybrid train design, combining the flexibility of push-pull trains with the improved dynamics of multiple units, making it a versatile and efficient mode of transport.
- ๐๏ธ The Guns Works, a Hungarian domestic rolling stock manufacturer, played a crucial role in developing these innovative trains, despite economic challenges after the fall of the Soviet Union.
- ๐ The 400 34 series, or BV M, was an intercity version of the BDV M, offering upgrades such as increased top speed and air-conditioned interiors, showcasing Hungary's commitment to rail innovation.
- ๐ The potential of the BV M trains was not fully realized due to economic decline and lack of investment, resulting in only three units being built and a reliance on conventional trains.
- ๐ค๏ธ The Inter City Plus program was an attempt to revitalize long-distance rail traffic without significant investment, but it resulted in a backlog of maintenance and substandard new cars.
- ๐ The cancellation of the new long-distance Push Pull trains due to lack of funds further hindered Hungarian Railways' progress, leaving them to rely on outdated rolling stock.
- ๐ In contrast, the Czech Railways managed to save their domestic train manufacturing and invest in rail infrastructure, developing their own versions of the innovative trains Hungary had once pioneered.
- ๐ The Austrian and Swiss rail systems are highlighted as examples of successful, modern rail networks, with standardized, high-quality services and innovative operational concepts.
- ๐ The script emphasizes the importance of forward-thinking operational concepts and modern rolling stock for the future of rail transportation, something Hungary had the potential to achieve but ultimately fell short due to various challenges.
Q & A
What was the state of European rail in the mid-1980s?
-The mid-1980s in Europe marked the last golden age of European rail, which was about to end with the dark ages of the '90s characterized by stagnation, managed decline, line closures, and budget cuts.
What is a 'classic set' in the context of trains?
-A 'classic set' refers to a train configuration where a locomotive is at the front, pulling passenger cars behind it.
What is the difference between a 'push-pull' train and a 'multiple unit'?
-A 'push-pull' train has a locomotive at one end that can be remotely controlled from a driver's cabin at the other end of the train, allowing for direction changes without moving the locomotive. A 'multiple unit' has no separate locomotive; instead, the motors are built into the train cars, with driver's cabins at both ends, providing better operational flexibility and performance.
What was the innovative concept introduced by Hungarian Railways for suburban rail in the 1980s?
-The innovative concept introduced by Hungarian Railways was the creation of a new train design and operational plan that combined existing concepts and improvements, resulting in trains and operational plans that were groundbreaking for their time.
What were the key features of the BDV motor 414 series trains?
-The BDV motor 414 series trains featured automatic doors, rapid acceleration, and state-of-the-art automatic couplers. They also allowed for the synchronization of engines in multiple car units from a single driver's cabin and could be extended with additional cars for greater capacity.
How did the BDV MZ cars contribute to the flexibility of Hungarian Railways' operations?
-The BDV MZ cars were interoperable with other trains in the Hungarian Railways fleet, allowing them to be used as part of regular trains if needed. They also featured double swinging doors for high passenger flows and could be extended with up to four additional cars for increased capacity.
What was the significance of the BV M 4034 series trains?
-The BV M 4034 series, also known as the intercity version of the BDV M, were significant because they were push-pull multiple unit hybrids with important upgrades, including increased top speed, air-conditioned interiors, and innovative seating layouts, making them comparable to modern high-speed trains.
What is the 'Railjet' and how does it compare to the BV M?
-The 'Railjet' is a high-speed train service by Austrian Federal Railways, known for its flexibility, operational characteristics, and standardized high-quality service. The BV M was very close to the Railjet in terms of design and functionality, having been introduced 14 years earlier, but lacked some modern amenities like power sockets and LCD screens.
What happened to the plans for a nationwide intercity train system using BV M models in Hungary?
-The plans for a nationwide intercity train system using BV M models were shelved due to the economic collapse following the fall of the Soviet Union, which affected investment in rail and led to a period of decline in the rail industry.
What was the 'Intercity Plus' program and why was it considered a failure?
-The 'Intercity Plus' program was an attempt to revitalize long-distance rail traffic without significant investment. It involved refurbishing old trains with new cars. However, it was considered a failure because the project was obsolete from the start, faced funding issues, and resulted in a maintenance backlog and poor-quality trains.
How did the Czech Railways differ from Hungarian Railways in terms of development post-Soviet Union collapse?
-Unlike Hungarian Railways, Czech Railways managed to save their domestic train manufacturing and invested heavily in rail infrastructure. They created their own versions of the BV M and BDV M models and developed a modern operating concept, positioning themselves as an example of what Hungary could have been.
Outlines
๐ Hungarian Railways' Innovative Leap
This paragraph introduces the often-overlooked Hungarian Railways and its remarkable achievements in the late 1980s. Despite being a smaller and less affluent country compared to its European counterparts, Hungary managed to innovate and nearly revolutionize European passenger rail. The engineers and planners combined existing concepts to create trains and operational plans that were not only groundbreaking at the time but are still competitive with modern systems. The script also outlines the general train configurations of the era, such as classic sets and multiple units, and highlights the Hungarian Railways' new suburban rail concept introduced in the 1980s, which was a significant advancement in technology and safety.
๐ค๏ธ The BDV Motor 414 Series: A Pioneering Train
The BDV Motor 414 series, introduced by the Hungarian domestic Rolling Stock manufacturer, is detailed in this paragraph as a major leap in quality and technology. It surpassed other European rail companies' offerings in the suburban category with its modernity and innovation. The train featured automatic doors, rapid acceleration, and state-of-the-art automatic couplers. It was designed to be interoperable with existing Hungarian Railways infrastructure and could be extended or reduced in length as needed. The paragraph also mentions the political interference from Victor Orban and the promotion of NordVPN as a tool for internet security and privacy.
๐ The BV M and the Unfulfilled Potential of Hungarian Rail
This paragraph discusses the BV M, an intercity version of the BDV M, which was designed for high-speed operation and comfort. Despite the economic challenges following the fall of the Soviet Union, the Guns Works continued to innovate with this train, which was comparable to the Austrian Rail Jets but entered service 14 years earlier. The BV M was envisioned to be the backbone of Hungarian long-distance rail, offering a modern, reliable service. However, due to the economic downturn and lack of investment, only three BV M trains were built, and the nationwide intercity train system using BV M trains was never realized. The Hungarian Railways reverted to conventional trains and later attempted to revitalize long-distance rail with the Inter City Plus program, which ultimately failed due to various issues, including poor build quality and a lack of funding.
Mindmap
Keywords
๐กEuropean Rail
๐กInnovation
๐กPush-Pull Trains
๐กMultiple Unit (MU)
๐กSuburban Rail Traffic
๐กInteroperability
๐กBudapest Vag็บฟ
๐กRail Jet
๐กInter City Plus
๐กAutocracy
๐กCzech Railways
Highlights
In the mid-1980s, Hungary's railways revolutionized European passenger rail with innovative train and operational plans.
Hungarian engineers took existing concepts and improved them, creating trains that were groundbreaking for their time.
The BDV motor 414 series was introduced in 1988, showcasing a leap in quality and technology compared to other European rail companies.
The BDV motor 414 series featured automatic doors, accelerated rapidly, and had state-of-the-art automatic couplers.
Trains could be extended with up to four additional cars, providing flexibility and operational efficiency.
The BDV M series was a hybrid of push-pull and multiple unit trains, offering the benefits of both.
The Budapest-Vรกc line saw such success with the BDV M series that it nearly implemented a clock face scheduling system.
Despite economic collapse in the 1990s, the Gรกns Works continued to innovate with the 400 34 series or BV M, an intercity version of the BDV M.
The BV M intercity trains had top speeds of 160 kmph and innovative features like semi-coupet layouts in first class.
The BV M's flexible design allowed for easy modifications and modernizations on a plug-and-play basis.
The BV M was designed for a modern, reliable, and innovative operational concept, setting a precedent for European rail systems.
The Inter City Plus program was an attempt to revitalize long-distance rail traffic without significant investment, resulting in obsolete rolling stock.
The cancellation of the Inter City Plus project due to lack of funding left Hungarian Railways with a maintenance backlog and outdated trains.
A recent competition for new long-distance Push Pull trains was won by Siemens, but the project was scrapped due to funding issues.
Czech Railways, in contrast, has successfully invested in rail infrastructure and created their own versions of the BV M and BDV M.
Despite setbacks, some of Hungary's original urban trains are still in operation, with some undergoing recent overhauls.
The intercity version of the Hungarian trains is now mostly used as a last resort due to cancellation of further procurement.
Transcripts
when we think of cutting a European rail
we usually imagine Germany Switzerland
Austria maybe France but few people know
that another much smaller and poorer
country not only surpassed them in
Innovation but came close to changing
the face of European passenger rail the
engineers and Transit planners of this
little country took already existing
Concepts and improvements and mashed
them together into trains and
operational plans that were
groundbreaking for their time and are
easily on par with Mod systems today
this is the story of the Hungarian
Railways and the rail Revolution That
Never
[Music]
Was it's the mid 1980s in Europe the
last golden age of European rail is
about to end with the dark ages of the
'90s fast approaching stagnation managed
decline line closures budget cuts under
The Alibi of efficiency pouring money
into highways instead of tracks end of
century neoliberalism at its finest
before we go further though I'll have to
quickly explain trains so we're on the
same page see back in those days trains
were mostly thought of as a locomotive
Dragon cars behind it this is called a
classic set even the much EnV Austrian
or swiss Railways relied on such classic
sets sometimes the end car would have a
driver's cabin that's called a control
car from which the locomotive in the
back could be remote controlled we call
such a train a push pull and we like it
because it allows us to change direction
without needing to switch the locomotive
saving lots of time money and fuel
Germans were particularly big on this
concept the step above the push PS is
the multiple unit here there is no
locomotive the motors are built in and
there is a driver's cabin on both ends
by default this allows for much better
operational flexibility acceleration and
braking meaning better punctuality and
shorter travel times among others so
1980s Suburban rail traffic in Hungary
is done by locomotives hauling old cars
with manual doors with old BDT control
cars hooked on the ends everything is
done by hand speeds are low and
operation is rather unsafe you could
just open these doors mid journey and
jump out if you wanted it was at this
time that someone at the Hungarian
Railways headquarters found themselves
sober on a Monday morning so sober that
they created a brand new operating
concept for Suburban rail the guns works
the Hungarian domestic Rolling Stock
manufacturer at the time thus received a
Monumental task designing and building a
brand new train that would Propel
Suburban rail not just to the present
but to the Future via the railway's
brand new experimental operational
concept and in 1988 they were ready to
present their creation
the bdv motor 414 series was a massive
jumping quality and Technology compared
to anything else Hungarian rail had and
surpassed or at least was on par with
anything any other European rail company
was Fielding at the time in the Suburban
category it beat the austrians in
quality of modernity who were just
putting into operation their next gen
Suburban push PS at that point it beat
the austrians the trains had automatic
doors accelerated like mad and were even
equipped with automatic couplers which
was state-of-the-art Tech at the time
you you could hook two four car units
together even and operate both their
engines synchronously from one driver's
cabin you could also extend individual
trains with up to four fer cars instead
of two making a six carar unit nowadays
there is even Wi-Fi on them but oh no
what's this Victor Orban is listening in
on you he actually does it's a Well
documented thing be gone orbon for
thanks to nordvpn you can now keep
malicious actors out of your private
life available both on Android iOS and
PC nordvpn is the number one VPN
provider on the market their virtual
private network service keeps you
Anonymous on the Internet by hiding your
physical location and encrypting your
personal data one of their main features
is of course the elimination of region
blocks want to check out that new show
on that streaming platform Hoops
unavailable in your country except no
it's not nordvpn is a useful tool if you
travel a lot like I do on trains and
connect often to public Wi-Fi networks
for example if access is limited by time
or amount of data now you can pretend to
be someone else digitally and use those
limits all over again nordvpn also has a
special feature called threat protection
Pro included in the subscription plan
threat protection Pro blocks fake
websites scans the links you click and
the things you download and even blocks
ads and web trackers for you threat
protection Pro doesn't need an active
VPN connection and can be turned on and
off independently so you can sit back
and enjoy an internet free of annoyances
any time get nordvpn's 2-year plan plus
4 months free using my link nordvpn.com
adom something which you will also find
in the description subscribing is
risk-free since you also get a 30-day
money back guarantee thanks to nordvpn
for sponsoring today's video
[Music]
so is the bdv m a multiple unit or a
push pull both actually it's a hybrid
with regular UIC cars between a
motorized car and a control car this was
a great compromise the flexibility and
interoperability of push pulls with the
improved dynamics of multiple units the
cars had double Swinging Doors in the
middle designed for the high passenger
flows of suburban traffic the bdv MZ
cars were also interoperable with
everything the Hungarian Railways had at
the time the fer cars could be run as
part of regular trains should the need
arise giving you unprecedented flexib
across the network a total of 24 car
units were delivered to the Hungarian
Railways for starters their operation on
the Budapest vat line turned out to be
such a success that they almost
instituted clock face scheduling on the
line that's when trains depart at the
same time every hour leading to an easy
to remember passenger friendly schedule
though it didn't work out due to
internal resistance we had to wait until
2004 when it was instituted nationally
now the guns Works had already built
similar trains a few years back like the
creation 6111 series but those were toy
trains compared to the bdv mod designed
for smaller lines with low traffic the
trains themselves were really not
interoperable with anything else as far
as I know in comparison the bdv mod was
real heavy duty stuff built to easily
handle the busiest Suburban lines around
the capital by 1990 all 20 trains had
been delivered it was a time of economic
collapse however as the fall of the
Soviet Union affected Eastern Europe
severely the guns Works were no
exception but despite that they were far
from done in that climate of economic
Decline and tried up funding they
decided one Quantum Leap wasn't enough
so they did it again with their next
creation the 400 34 series or BV M the
inter city version of the bdv M these
trains are great they're the same Push
Pull multiple unit hybrids but with
important upgrades among them their top
speed having been increased to 160 kmph
with its four treaure motors which sound
like the Millennium Falcon jumping to
line speed during acceleration
[Music]
w
they have single automatic doors at the
ends of each car and their interior is
air conditioned speaking of interior the
trains contained Innovations like the
semi coupet layout in first class where
the four seaters are inside their own
compartments next to the row of single
seats you only saw this kind of stuff in
places like Germany and even there it
was quite rare these trains could even
be run in so-called tgv mode by hooking
up a second motor car on the other side
instead of a control car operating both
synchronously from one end with one
motor car you could extend the set with
two more cars which made a six-car inter
city train just one car less than the
rail jet now in select videos I tend to
Rave about the Austrian rail Jets
because they represent the current
Cutting Edge of up to higher speed
long-distance rail rail jets are push
pull sets meaning no locomotive
switching and the cars are permanently
coupled uniformly so if you know the car
order one rail jet you know all of them
because of this their interior is also
more spacious and quiet with the rail
Jets flexibility and operational
characteristics Austrian rail put
together a world class passeng rail
network providing a consistent
Dependable standardized high quality
service the railjet network is the
absolute Pinnacle of current
higher speed ra Transit and I will find
anyone on
that the Hungarian rail BV mode was very
very close to the rail jet it was 95%
there if Austrian long distance traffic
was made up purely of BV muds today no
one would complain all right so Gunworks
made a train as good as seens and what's
the big deal well rail Jets entered
service in 2008 the BV mode
1994 a full 14 years earlier of course
the BV mod didn't have stuff like power
sockets or LCD screens but those can
always be built in during maintenance
due to its extreme flexibility you could
also plug in new cars if you wanted a
mixed use car with spaces for bikes and
wheelchairs a b or restaurant car for
international connections a car with a
family section the BV Mod's flexible
design allows for all sorts of modding
and modernizations on a plug andplay
basis no need to take the train apart to
bits just put the car in boom now it's
good for 20 more years the BV Ms were
envisioned as the backbone of Hungarian
long-distance rail providing a reliable
high quality service to every major city
gradually replacing the Aging
conventional Fleet the proposed system
was a version of today's Austrian rail
jet or swiss inter city systems
basically this is why the BV mods were
truly Forward Thinking and Innovative
they weren't just good Rolling Stock
they were designed and built for a type
of modern reliable and Innovative
operational Concept in the regular speed
category that would not be seen in
Europe until a decade later since these
trains were also made up of UIC standard
cars that meant if there is some sort of
issue with the trains you could
immediately fall back on locomotives as
your backup they can also pull the BD
mod cars since they are also cross
compatible with everything else this is
ooh this is great the train people in my
audience right now are going like oh
okay that's pretty cool with that
Hungary was ready to join The Cutting
Edge of European regular speed
longdistance rail surpassing it even a
world-class system with a Forward
Thinking operational concept and
excellent Rolling Stock plans were made
to have the BV mod produced and mass but
the orders never came it was still the
1990s the Soviet Union and just fell
apart investment into rail cratered a
long period of decline ensued which took
the guns works with it because of this
only three BV mods were ever built this
did not allow for working out the bugs
so the trains remained unreliable
maintenance remained very pricey since
you have to custom manufacture spare
parts in small quantities as opposed to
mess manufacturing them economically
like seens does for rail Jets the plans
for a nationwide inter city train system
using BV mods were sheld with that the
Hungarian Railways went straight back to
the 1940s in terms of thinking opting to
operate its longdistance network with
conventional trains without even control
cars a decade later thanks to EU funding
the Hungarian Railways could buy new
trains for local traffic like sems desos
or stet flirts and kisses but as far as
long distance is concerned they went for
the do-it-yourself route enter the inter
city
[Music]
plus the inter city plus program was an
attempt to Breathe new life into
long-distance rail traffic without
actually investing any significant funds
into it the original plan of running
newly built cars with an eventual
control car were something at least it
was basically a shitty rail jet but it
was something and the first two
prototype cars weren't half bad they
were quite good actually as far as
obsolete Rolling Stock goes and that L
part was the problem the inter city plus
project was obsolete from the moment of
its conception every developed country
on Earth even America is going either
for permanently coupled push pulls or
multiple units those are the future of
long-distance rail transportation and
into this environment enters the
Hungarian Railways with a
conventional set because those control
cars they promised were never built the
200 or so cars they planned on were
never built either only a grand total of
92 cars until the project was scrapped
due to a lack of funding and the factory
that built them was no Factory at all it
was one of the repair bases in solok
which was already under sted and
overloaded even before they got the
order to build brand new cars the end
result a huge backlog in overhauls where
the Hungarian railway's best cars were
left to rot on sidetracks for years
meanwhile the inter city plus cars they
built were awful they come with
a comical amount of defects and the
build quality is well let's just say
questionable after the Hungarian
government kept forcing the ic+ project
and then consequently abandoned it the
Hungarian Railways were left in a shape
arguably worse than before no
operational concept no developmental
plans just a pile of shitty new cars a
huge maintenance backlog all the while
desperately trying to keep their
decaying Rolling Stock alive up until a
few years ago it seemed The Glory Days
of Hungarian rails were truly over for
good but then a miracle happened someone
within the Hungarian government found
themselves sober on Monday morning and
ordered the Hungarian Railways to
announce a competition for brand new
long-distance Push Pull trains which
seens won with their new generation rail
jet 39 trains with at least seven cars
with 10 more trains on option this
amount of trains could cover most major
International connections and could free
up enough cars from those lines to
stabilize the domestic Rolling Stock
situation for a good 20 years it seemed
that after all if not being The Cutting
Edge Hungarian rail will at least get to
keep up with the times but then the
project was scrapped due to a lack of
funds because the EU won't give Orban
money because they don't like the fact
that he's turning Hungary into an
autocracy and so the Hungarian Railways
are and will remain oh well those
new rail Jets ended up going to the
Czech Railways instead who for some
reason insisted on calling them Comfort
Jets because every godamn train of
theirs has to have its own separate name
still in this story czechia is the good
example what Hungary could have been a
country that started out in a similar
spot as Hungary after the fall of the
Soviet Union they managed to save their
domestic train manufacturing and have
been investing heavily into their rail
infrastructure they even created their
own version of the BV mode and bdv mode
called theod inter pter and theod Regio
pter though the first one definitely
needs some more Buck fixing still the
check Railways put together a pretty
good operating concept aiming to replace
most domestic connections with multiple
units and the occasional push B while
running rail Jets on International
connections just like Austria so the
check system and their domestic Rolling
Stock are pretty great except when they
aren't like the check rail director
having a fetish for not expending track
capacity yes we've been reconstructing
the busiest Mainline for two years and
didn't Ed a third track it's completely
unnecessary hey why is the network so
congested right so aside from some
issues in the end Chia has become what
Hungary was supposed to be in the 1990s
and onward I just wish they stopped
trying to name all their train types we
got Panther Fox shark Mouse elephant
spider we got pendolino rail jet
Interjet comfor jet reg onova anyway
where was I going with this Swiss rail
Austrian rail A+ Czech rail getting
there Hungarian rail yeah it
sucks as for the guns workor ex trains
this urbon ones are still running and
some recently even went through overhaul
the inter city version however is a lost
cause at this point and are only
deployed as Replacements strictly on a
we didn't have anything else basis which
is an increasingly common occurrence
because they canceled the
procurement for trains that would
actually
[Music]
Browse More Related Video
The Self Balancing Monorail
How Japan's Maglev Train Works
Mexico tore up the $4.4 billion high speed rail contract with China, why?
Will Rail Nationalisation Work?
้ฟ็พ ๅใๆฅ็ตฑๆฅ้ฃๅ้ง๏ผ็บไฝๅฎข้ๆฅญๅฟซใๆไธไฝไบใ๏ผ้ๆ่พฆๆณๆๅ๏ผใๅฐ็ฃไบค้ๆ้บผไบ๏ผใEP 018๏ฝๅฟ็ฅบไธไธ
Rail Electrification Systems - Learn EVERYTHING About Them!
5.0 / 5 (0 votes)