COSTRUISCO UNA PISCINA INTERRATA - EP.3
Summary
TLDROver the past nine years, a significant project has been underway, involving the transformation of a vineyard into a pool area. The video documents the construction process, including building a pool, a mysterious second structure, and the installation of water and electricity. Despite setbacks due to rain, the project progresses with the completion of walls, walkways, and drainage systems. The video ends with a cliffhanger, hinting at a secret project to be revealed once all construction is complete.
Takeaways
- 🏡 The project involves building a significant structure over nine years, including a pool and another construction.
- 📅 A timeline is being respected with work to be completed before the summer holidays.
- 🏞️ The vineyard area has been cleared and leveled for the construction of the pool.
- 🧱 Work includes building steps, covering the second construction with a roof, and laying pipes for water and electricity.
- 👕 The video is a progress update as of May 31st, showing ongoing construction work.
- 💧 A drainage system is being installed around the pool to collect and filter water.
- 🛠️ Vertical walls are being built to support the pool's walkway and central area.
- 🏊♂️ The pool's steps are being constructed, and the walkway will be covered with terracotta.
- 🌧️ The construction is facing weather challenges as rain continues to affect the work.
- 🚜 Material is being transported and spread around the pool for drainage and structural support.
- 🏗️ June 9th marks the pouring of concrete for the walkway and the smaller children's pool.
- 📦 The construction of the second building involves laying wooden beams for the roof.
Q & A
What is the main project described in the script?
-The main project described in the script is the construction of a swimming pool and an additional building, which is part of a larger project that has been ongoing for nine years.
What was the initial work done on the vineyard to start the project?
-The initial work involved removing a part of the vineyard, leveling the ground, and starting the construction of a swimming pool.
What are the tasks that need to be completed before the summer break?
-The tasks to be completed before the summer break include finishing some construction work, building steps in the pool walkway, covering the second building with a roof, and laying pipes for water and electricity around the entire perimeter of the project.
What was done to the external wall of the pool after the work shown in the previous video?
-After the external wall work shown in the previous video, a pipe was installed around the perimeter to collect overflow water from the pool, direct it to a balancing tank for filtration, and then return it back into the pool.
What is the purpose of the vertical walls built around the pool?
-The vertical walls are built to support the walkway that will be constructed around and in the center of the pool.
What material is used for the deep part of the pool to ensure proper water drainage?
-A special draining material is used in the deepest part of the pool to ensure proper water drainage, which then flows into a drainage pipe to be removed.
What is the purpose of the 'secret project' mentioned in the script?
-The 'secret project' is not explicitly detailed in the script, but it involves additional construction work around the pool area, including the installation of pipes and the creation of a walkway.
Why did the construction of the pool stop temporarily?
-The construction of the pool stopped temporarily because the hydraulic and electrical systems for the balancing tank and technical room have not yet been installed, and they are waiting for the completion of the second building and the surrounding area for the secret project.
What is the current status of the second building in the project?
-The second building is almost complete with all the walls, both perimeter and internal, built, as well as the roof structure.
Why is the pool not going to be opened in the near term despite the construction progress?
-The pool will not be opened in the near term because the hydraulic and electrical systems are still missing, and even if they were installed, they would wait until the second building and the entire surrounding area for the secret project are fully completed.
Outlines
Этот раздел доступен только подписчикам платных тарифов. Пожалуйста, перейдите на платный тариф для доступа.
Перейти на платный тарифMindmap
Этот раздел доступен только подписчикам платных тарифов. Пожалуйста, перейдите на платный тариф для доступа.
Перейти на платный тарифKeywords
Этот раздел доступен только подписчикам платных тарифов. Пожалуйста, перейдите на платный тариф для доступа.
Перейти на платный тарифHighlights
Этот раздел доступен только подписчикам платных тарифов. Пожалуйста, перейдите на платный тариф для доступа.
Перейти на платный тарифTranscripts
Этот раздел доступен только подписчикам платных тарифов. Пожалуйста, перейдите на платный тариф для доступа.
Перейти на платный тарифПосмотреть больше похожих видео
Renovating an Abandoned Mansion Part 9
Újratöltve! Haszon elmaradt, a bosszúság nem. Mégis, fény az alagút végén! Elstartolt a befejezés!
Automatic Rain Detection Smart Roof For Cloth Protection | New Project Idea
I built a flying car! (eVTOL)
New Home Rough-In Stage (2020)
How I-94 ripped apart the Rondo neighborhood and one group's plan to help restore it | FOX 9 KMSP
5.0 / 5 (0 votes)