25 steps to design your House | Interior design Construction step by step process | interior Coach
Summary
TLDRThis video provides a comprehensive, step-by-step guide for building a home from scratch, covering everything from initial design and layout to final touches and handover. Key stages include electrical work, plumbing, flooring, waterproofing, false ceiling installation, and painting, alongside tips on organization and protection. The guide emphasizes practical advice, cost-effective methods, and the importance of maintaining quality at every stage. With additional recommendations for post-construction care and maintenance, this video is a valuable resource for anyone planning to build or renovate their dream home.
Takeaways
- 😀 Start with pasting reference designs and 3D drawings on the walls to plan the layout before starting any work.
- 😀 🎯 Mark the floor area with masking tape to ensure furniture and design elements fit properly without cluttering walkways.
- 😀 🛡️ Protect the flooring with branded protection sheets to prevent damage or scratches during the construction process.
- 😀 🛠️ Dismantle any existing structures and ensure proper disposal of debris, especially if you're in an apartment complex.
- 😀 💡 Install electrical wiring, pipes, and switch boxes early on, and always take photos for future reference in case any adjustments are needed.
- 😀 🔧 Complete the framing for false ceilings before proceeding with the electrical wiring and pipe installations.
- 😀 🧼 Ensure all AC and drain piping is completed early, and take photos to avoid any damage during later stages of construction.
- 😀 🏗️ Apply water-proofing coats on bathroom floors, followed by a layer of protective plaster to prevent seepage.
- 😀 🎨 For high-end finishes, use POP (Plaster of Paris) for walls instead of cheaper options like acrylic putty, ensuring smoother finishes.
- 😀 🛁 When doing floorings, always keep the bathroom areas lower in level compared to the rest of the house to prevent water accumulation.
- 😀 🧹 After tiling and flooring, ensure to apply a protection sheet to prevent damage and finish any other adjustments like the kitchen, mirrors, and doors.
- 😀 🏠 Once the main work is done, perform a final deep clean before moving into the house, and create a snag list for minor fixes.
Q & A
What should be the first step when starting a home construction project?
-The first step is pasting references and 3D designs or drawings on the wall. This helps visualize the layout and ensures the design elements align with the physical space.
Why is line marking important during home construction?
-Line marking helps define the dimensions of furniture and fixtures, ensuring the design remains practical and space-efficient. It allows you to visualize the placements and avoid issues like cramped walking spaces.
What is the purpose of protection sheets during the construction process?
-Protection sheets are used to safeguard floors, tiles, or marble from scratches or damage during construction work. They help maintain the quality of your flooring throughout the building process.
Why should photos be taken of electrical box installations?
-Taking photos of electrical box and pipe installations ensures you have a reference for future repairs or adjustments. This helps avoid issues like accidentally damaging hidden electrical work later on.
What are the key points to consider when installing false ceilings?
-When installing false ceilings, you need to first complete the framing, followed by the wiring and piping. Ensure that these are done in advance to avoid later complications. It’s essential to plan ahead for any future installations, like doorbells or lighting.
What is the significance of waterproofing in the bathroom area?
-Waterproofing is crucial for preventing water seepage. Applying multiple coats of waterproofing material, including fiber mesh, ensures that your bathroom remains water-tight and protects other areas from potential damage.
Why is it important to maintain a proper floor level across different areas of the home?
-Maintaining proper floor levels ensures that all areas of the home are aligned. For example, bathrooms, kitchens, and balconies should have a slight slope to prevent water from collecting, while the rest of the house should remain even to avoid drainage issues.
What precautions should be taken when installing modular kitchen units?
-When installing modular kitchen units, ensure that the countertops (granite or quartz) are fixed before other fittings are installed. Additionally, ensure that all kitchen elements are carefully packaged and protected from damage during transport and installation.
How does the final coat of paint impact the overall finish of a home?
-The final coat of paint provides the home with a polished, smooth, and uniform finish. It is important to perform this step after all light fixtures and accessories are installed, to prevent damage and ensure the paint stays pristine.
Why is a 'snag list' necessary after home construction is completed?
-A snag list is necessary to identify minor issues or unfinished work that needs to be corrected. It helps the contractor address any flaws or adjustments needed before the final handover, ensuring the home is in perfect condition.
Outlines
このセクションは有料ユーザー限定です。 アクセスするには、アップグレードをお願いします。
今すぐアップグレードMindmap
このセクションは有料ユーザー限定です。 アクセスするには、アップグレードをお願いします。
今すぐアップグレードKeywords
このセクションは有料ユーザー限定です。 アクセスするには、アップグレードをお願いします。
今すぐアップグレードHighlights
このセクションは有料ユーザー限定です。 アクセスするには、アップグレードをお願いします。
今すぐアップグレードTranscripts
このセクションは有料ユーザー限定です。 アクセスするには、アップグレードをお願いします。
今すぐアップグレード関連動画をさらに表示
Complete House Construction procedure step by step| 30 steps | घर बनाने का सही तरीका |
TAHAPAN BANGUN RUMAH 2 LANTAI: ANIMASI VIDEO JOEN - Part (1/2)
Renovar um apartamento! Básicos e valores !
The Cost To Build My Second Home Build! (FULL BUDGET BREAKDOWN)
How To Build A House: Submitting and Getting The Building Plans Ep 11
Revealing How Much it Cost to Build My First House for a Rental Property!!
5.0 / 5 (0 votes)