How To Load And Unload Bulk Liquids

Liquid Trucking Companies (OFC/Schmidt/Barto)
14 Dec 201603:18

Summary

TLDRThis transcript details the procedures and safety measures involved in liquid trucking operations. It explains the importance of verifying product delivery, inspecting equipment, and using different pumping methods for unloading. Key safety precautions are emphasized, such as wearing protective gear and ensuring all connections are secure to prevent spills. The coordination between drivers, dispatchers, and customers is crucial, with the use of Qualcomm technology for tracking hours and locations. Overall, the unloading process typically takes about an hour to an hour and a half, depending on efficiency.

Takeaways

  • 🚚 The delivery process involves verifying the product and ensuring it meets customer specifications.
  • 🔧 It's crucial to inspect the area around the truck and trailer before starting operations to identify any potential issues.
  • 🔗 Properly connect the pump and hoses, ensuring all safety protocols are followed before proceeding.
  • 💨 There are different unloading methods: using air pressure or a Roper pump to create suction from the trailer.
  • ⚠️ Always vent the top of the trailer when starting to prevent collapse due to pressure changes.
  • 🛡️ Safety gear is essential, including a hard hat, face shield, goggles, rubber suit, gloves, pants, and rubber boots.
  • 🔥 A single drop of corrosive material can cause serious skin burns, emphasizing the need for safety precautions.
  • ✅ Before unloading, pressurize the hoses and check for leaks, especially at gaskets and valves.
  • 📱 The dispatch center uses Qualcomm for tracking drivers' hours and locations to optimize delivery operations.
  • ⏱️ The entire loading or unloading process typically takes about one to one and a half hours if executed smoothly.

Q & A

  • What is the primary focus of the delivery process described in the transcript?

    -The primary focus is on the safe and proper delivery of products to customers, ensuring that all equipment and safety protocols are followed during the unloading process.

  • What safety gear is required for the delivery process?

    -The required safety gear includes a hard hat, face shield, goggles, rubber suit, gloves, pants, and rubber boots to protect against corrosive materials.

  • What are the two methods of unloading product mentioned in the script?

    -The two methods of unloading are using air pressure to pressurize the trailer and using a Roper pump to create suction from the trailer.

  • Why is it important to vent the top of the trailer during the unloading process?

    -Venting the top of the trailer is crucial to prevent it from collapsing due to the vacuum created during suction unloading.

  • What should be checked before starting the unloading process?

    -Before starting, it is essential to check for leaks in the hoses and valves, ensure all connections are secured, and that safety gear is worn.

  • How long does the loading or unloading process typically take?

    -The loading or unloading process typically takes about one to one and a half hours from start to finish.

  • What role does the Qualcomm system play in the delivery process?

    -The Qualcomm system is used for tracking drivers' hours of service, locations, and coordinating with the dispatch operations center to ensure timely deliveries.

  • What is the consequence of not wearing the appropriate safety gear?

    -Not wearing the appropriate safety gear can lead to serious injuries, such as burns from corrosive materials, as even a single drop can penetrate the skin.

  • What must be verified with the customer before delivering the product?

    -It must be verified that there is enough room in the customer's tank for the amount of product being delivered.

  • What measures are taken to prevent spills during the unloading process?

    -Measures include ensuring all cam locks are secured and checking for leaks before opening valves to start the pump.

Outlines

plate

このセクションは有料ユーザー限定です。 アクセスするには、アップグレードをお願いします。

今すぐアップグレード

Mindmap

plate

このセクションは有料ユーザー限定です。 アクセスするには、アップグレードをお願いします。

今すぐアップグレード

Keywords

plate

このセクションは有料ユーザー限定です。 アクセスするには、アップグレードをお願いします。

今すぐアップグレード

Highlights

plate

このセクションは有料ユーザー限定です。 アクセスするには、アップグレードをお願いします。

今すぐアップグレード

Transcripts

plate

このセクションは有料ユーザー限定です。 アクセスするには、アップグレードをお願いします。

今すぐアップグレード
Rate This

5.0 / 5 (0 votes)

関連タグ
Liquid TruckingSafety ProtocolsDelivery ProcessEquipment ChecksCustomer RelationsTrucking IndustryOperational EfficiencyHazardous MaterialsDispatch OperationsLoading Procedures
英語で要約が必要ですか?