TLDRThe video script outlines a professional approach to window installation in new buildings, adhering to regulations like DIN 18355. It covers preparation, cleaning, measuring, and applying multifunctional tape. The script details the use of BlauGep products for sealing and fixing windows, emphasizing correct installation joint positioning, level adjustment, and sealing with foam and foil for weatherproofing.
Takeaways
- 🏗️ The script outlines a professional method for installing windows in new buildings, emphasizing compliance with regulations such as the installation guidelines under DIN 18355.
- 🔍 A general soil test is required for new buildings, and professional window installation necessitates cleaning the soffit to remove dust and loose parts.
- 📏 Verification of dimensions in the unfinished state is crucial, and reference markers are applied to the masonry.
- 🛠️ The Blaugep multifunctional tape trio STL 600 is used for attaching the window profile, with specific instructions on handling the tape.
- 🔄 Attention to detail is critical, such as not using the first few centimeters of the tape and ensuring corners are filled in completely.
- 💧 The script highlights the importance of proper sealing methods, including using Blaugep all-weather foil and primer for enhanced adhesion.
- 🛁 The installation process involves temporary fixing of the window element using tools like wind bags or mounting clamps.
- 🔩 Secure fastening of the window element is done using Blaugep frame screws, with careful attention to avoid over-tightening.
- 🛑 The script specifies the need for priming the soffit before applying sealing materials and the use of specific products like Blaugep 1C gun foam for sealing.
- 🏡 For fall arrest protection and compliance with DIN 18008 Part 4, the installation guidelines recommend specific components and procedures.
- 🔨 The final steps include sealing the outer side of the joint with products like Blaugep foil duo SL 1050 power plus and installing the window sill.
Q & A
What is the purpose of the Blaugold brand mentioned in the script?
-Blaugold is the customer brand of the Mason, Book Group, and it demonstrates the professional way to install windows in new buildings.
What regulations does the window installation shown in the script conform to?
-The window installation shown conforms to applicable regulations such as the installation guidelines under DIN 18355.
Why is a general soil test required for new buildings?
-A general soil test is required for new buildings to ensure proper preparation for professional window installation.
What is the importance of cleaning the soffit before window installation?
-Cleaning the soffit is important to remove dust and loose parts from the substrate, which is necessary for a proper window installation.
What is the purpose of applying a reference marker to the masonry?
-The reference marker is applied to the masonry to verify the dimensions in the unfinished state and to ensure accurate installation.
Why is it recommended to pull off more material than the length actually required when attaching the multifunctional tape?
-Pulling off more material than required ensures that the corners are filled in completely and set edge to edge for a proper seal.
What is the role of the Blaugold multifunctional tape trio STL 600 in window installation?
-The Blaugold multifunctional tape trio STL 600 is attached to the surrounding sides of the window profile to ensure a proper seal.
How should the window element be temporarily fixed in position during installation?
-The window element should be temporarily fixed in position using wind bags or mounting clamps to achieve a uniform joint appearance.
What is the purpose of using Blaugold spacer blocks underneath the window element?
-Blaugold spacer blocks are used to transfer the load as specified in the installation guidelines and to ensure millimeter-precise level adjustment.
Why is it important not to overtighten the screws when fastening the window element?
-Overtightening the screws can cause the frame to bulge vertically, which can compromise the integrity and appearance of the window installation.
What is the function of the Blaugold all-weather foil in the window installation process?
-The Blaugold all-weather foil is used to seal the connection to the floor and provide protection against non-pressing water.
How should the corners be formed when sealing with the Blaugold foil?
-Corners should be formed separately with prefabricated corners for a professional finish, and the foil must be attached to the masonry with sufficient pressure using a pressure roller.
Outlines
🏗️ Professional Window Installation
The script outlines a professional method for installing windows in new buildings, adhering to regulations such as the installation guidelines under Dean 18355. It emphasizes the importance of preparation, including a general soil test and cleaning the soffit to remove dust and loose parts. The dimensions of the unfinished state are verified, and a reference marker is applied. The script details the use of the BlauGep multifunctional tape trio STL 600, which must be attached to the window profile with extra length set at the end to ensure corners are filled. The window element is temporarily fixed in position, and spacer blocks are used for load transfer as per guidelines. The script also covers sealing the connection to the floor using PlowGet all-weather foil, priming the soffit, cutting the foil to size with overlaps, and using blow gap foam for the lower joint. Finally, the inner side of the joint is sealed with BlauGep foil duo SL 1050 power plus, with a recommendation to form corners separately for a professional finish.
🔩 Securing and Sealing the Window Frame
This paragraph describes the process of securing the window element using BlauGep frame screws after leveling and plumbing checks. It specifies the need to drill holes according to substrate requirements and installation guidelines, selecting screws of appropriate length, and avoiding over-tightening to prevent frame bulging. The foil is attached to the masonry by self-adhesion, starting from the corners after removing the protective film and pressing with a roller. The lower joint is sealed with the foil, and the joints are packed with blow gap foam. The outer side is sealed using the BlauGep foil duo SL 1050 power one, which is fully adhesive on one side. The script also covers the installation of a window in accordance with the ETB guideline components, providing fall arrest protection, and referencing Dean 18008 part four for fastening spacings. It details the attachment of the BlauGep multifunctional tape trio STL 600, making holes for protection, and fastening the blacket protect at the fastening points using an integrated adjusting screw and a cordless screwdriver.
🛠️ Advanced Window Sealing Techniques
The script provides advanced techniques for sealing windows, starting with attaching the BlauGep foil basic inside to the window profile, ensuring at least 15 millimeters of the adhesive surface lies on the frame. It describes preparing the window for the outer sealing joint with masking tape and priming the soffit for a wet ceiling. The window element is temporarily positioned, and spacer blocks are used for load transfer and level adjustment. The element is fastened using BlauGep frame screws, and the joint is back-filled with cord round three sides. Sealant is applied and smoothed out using a stopping knife. The outer side is sealed with the BlauGep foil outside, and the window sill is installed after alignment. The script also mentions the use of BlauGep hybrid polymer power fix to avoid the need for holding down clamps and sound deadening strips while protecting the window sill. The final steps include removing the masking tape, packing the joint with blow foam, and sealing the inner side with the BlauGep foil basic inside. More information about the products can be obtained from the provided website.
Mindmap
Keywords
💡Blaugeld
💡Installation Guidelines
💡Soffit
💡Multifunctional Tape Trio STL 600
💡Wind Bags or Mounting Clamps
💡Blue Gap Frame Screws
💡Plowget All-Weather Foil
💡Blaugep 1C Gun Foam Premium All Season XXL
💡Blue Gap Spacer Blocks
💡Blaugep Foil Duo SL 1050 Power Plus
💡Blaugep Protect Fastenings
Highlights
Professional window installation process demonstrated by Blaugold, the customer brand of the Mason, Book Group.
Installation shown conforms to applicable regulations such as the installation guidelines under DIN 18355.
Preparation for window installation includes a general soil test and cleaning the soffit.
Verification of dimensions in the unfinished state using a suitable measuring tool.
Application of the reference marker to the masonry for accurate window placement.
Discussion of installation joint and sealing method during inspection of construction drawings.
Use of Blaugold multifunctional tape trio STL 600 for attaching to the window profile.
Important note on not using the first few centimeters of the tape for installation.
Temporary fixing of the window element in the soffit using wind bags or mounting clamps.
Use of Blaugold spacer blocks for load transfer as specified in the installation guidelines.
Fastening the window element using Blaugold frame screws with correct hole drilling and screw length selection.
Sealing the connection to the floor using the Plowget all-weather foil with proper priming and cutting.
Use of Blaugold 1C gun foam premium all season XXL for packing the lower joint.
Final sealing of the inner side of the joint with Blaugold foil duo SL 1050 power plus.
Recommendation for forming corners separately with prefabricated corners for professional finish.
Instructions for attaching the foil to the masonry with sufficient expansion loop.
Sealing the outer side of the window with Blaugold foil duo SL 1050 power one.
Installation of a window in accordance with the ETB guideline components providing fall arrest protection.
Use of Blaugold multifunctional tape trio STL 600 for the three surrounding sides of the window profile.
Fastening the blacket protect at the fastening points using the integrated adjusting screw.
Final fastening of the element using Blaugold frame screws after checking for plumb and level.
Sealing the lower joint with a blow gap foam and proper priming of the substrate.
Installation of the window sill and fastening directly to the profile using window sill screws.
Use of Blaugold hybrid polymer power fix for attaching the insulation sill profile.
Sealing the inner side of the joint with Blaugold foil basic inside and proper application of adhesive.
Transcripts
blaugeld the customer brand of the mason
book group
demonstrates the professional way to
install windows in new buildings
the installation shown here conforms to
applicable regulations
such as the installation guidelines
under dean
18355 as with all building projects
a certain amount of preparation in the
form of a general soil test
is required for new buildings as well
for professional window installation
the soffit must be cleaned in order to
remove dust and loose parts
from the substrate the dimensions in the
unfinished state
are verified using a suitable measuring
tool and the reference marker is applied
to the masonry
the installation joint and the
associated sealing method can be
discussed
when the construction drawings are
inspected and checked on site
[Music]
the blaugep multifunctional tape trio
stl 600
is attached to the three surrounding
sides of the window profile
it should be noted that the first few
centimeters of the tape
must not be used
when attaching pull off a little more
material than the length
actually required the rule of thumb
is one centimeter per meter this extra
length
is set at the end ensuring that the
corners are always filled in completely
the corners are always set edge to edge
after the multi-functional tape has been
attached place the window element in the
soffit
and fix it temporarily in position for
instance
using wind bags or mounting clamps
to achieve a uniform joint appearance
make sure the installation joint
is always in the correct position
put blaugep spacer blocks underneath in
order to transfer the load as specified
in the installation guidelines these can
be combined as required
to ensure millimeter precise level
adjustment
after checking for plumb and level
fasten the element using blue gap frame
screws
drill the holes in accordance with the
requirements for the substrate
and in line with the installation
guidelines and select screws
of the appropriate length when screwing
in
make sure that the screws are not over
tightened otherwise
the frame may bulge vertically
[Music]
the connection to the floor is sealed
using the plowget
all-weather foil the first step is to
prime the soffit
with blaugep all-weather bitumen primer
in order to improve adhesion do not
process
at under 5 degrees celsius
the foil is then cut to size allowing
overlaps of at least
50 millimeters the seal only provides
protection
against non-pressing water for a
professional corner finish
it is recommended that corners are
formed separately
with prefabricated corners
the foil must be attached to the masonry
by exerting sufficient pressure
using a pressure roller
the lower joint is then packed with a
blow gap foam
such as the blaugep 1c gun foam premium
all season xxl
[Music]
finally seal the inner side of the joint
with the blaugep
foil duosl 1050 power plus
make sure that the corners are formed
correctly here too
it is recommended that a primer is
applied to the substrate
in order to improve adhesion
[Music]
the blauget foil duo sl 1050 power plus
is attached to the three surrounding
sides of the window profile
in order to seal the inner joint at
least
15 millimeters of the adhesive surface
of the foil must lie
on the frame the corners are formed by
looping
be sure to allow for the corresponding
amount of extra material
after the foil has been attached place
the window element in the soffit and fix
it temporarily in position
for instance using wind bags or mounting
clamps
to achieve a uniform joint appearance
make sure the installation joint
is always in correct position put
laughing spacer blocks
underneath in order to transfer the load
as specified
in the installation guidelines
[Music]
these can be combined as required to
ensure millimeter precise
level adjustment after checking for
plumb and level
fasten the element using blue gap frame
screws
drill the holes in accordance with the
requirements for the substrate
and in line with the installation
guidelines
and select screws of the appropriate
length
when screwing in make sure that the
screws are not over tightened
otherwise the frame may bulge vertically
then attach the foil to the masonry by
self-adhesion
starting from the corners to do so
remove the protective film
and attach the foil after initial
pressing on with a pressure roller
the foil must be attached with a
sufficient expansion loop
the lower joint is likewise sealed by
means of the foil
the joints are then packed with a blow
gap foam such as the bloughgap
1c gun foam premium all season xxl
seal the outer side properly using the
blough foiled duo sl
1050 power one which is fully adhesive
on one side
[Music]
the installation situation illustrated
here describes how to install a window
in accordance with the etb
guideline components providing fall
arrest protection
and dean 18008 part four
refer to the installation guidelines for
the fastening spacings
for the element start installation by
drilling pilot holes
of five millimeter diameter in the
window element
note that the plastic window has a steel
core of 1.5 millimeter
with wood and wood metal windows
minimum screw in depth of 30 millimeters
must be guaranteed
[Music]
the blauget multifunctional tape trio
stl
600 is attached to the three surrounding
sides of the window profile it should be
noted that the first few centimeters of
the tape
must not be used when attaching the tape
make the holes for the protect using an
awl or
hollow punch
pull off a little more tape than the
length actually required
the rule of thumb is one centimeter per
meter
this extra length is set at the end
ensuring that the corners
are always filled in completely the
corners
are set edge to edge fasten the blacket
protect at the fastening points
using the integrated adjusting screw and
a cordless screwdriver
use the bluegap spanner for precision
adjustment
taking the joint width minus five
millimeter as the reference
[Music]
place the window element in the soffit
and fix it temporarily in position
for instance using wind bags or mounting
clamps
to achieve a uniform joint appearance
make sure the installation joint
is always in the correct position
put blue gap spacer blocks underneath in
order to transfer the load as specified
in the installation guidelines
these can be combined as required to
ensure millimeter precise
level adjustment using the adjusting
screw
now adjust the blouget protect
fastenings so that they are flush
against the wall or floor
[Music]
after checking for plumb and level
perform the final fastening of the
element
using blue gap frame screws in
combination
with the blough protect fastenings
drill the holes in accordance with the
requirements for the substrate
and in line with the installation
guidelines and select screws of the
appropriate length
the lower joint must be primed
appropriately for the substrate
the inner side of the joint is then
sealed with the blauget
foil duosl 1050 power plus
make sure that the corners are formed
correctly
stick a small piece of the foil over the
lower fastening point as well
and apply firm pressure everywhere using
a roller
the joint is then packed with a blow gap
foam
such as the blaugape 1c gun foam premium
all season
xxl seal the outer side properly
using the blough foil duo sl 1050 power
one
which is fully adhesive on one side
the blaugette multifunctional tape trio
stl 600
harmonizes perfectly with the blough
protect fastening system
[Music]
the blauget foil basic inside is
attached to the three surrounding sides
of the window profile
in order to seal the inner joint at
least 15 millimeters of the adhesive
surface of the foil
must lie on the frame
the corners are formed by looping be
sure to allow for the corresponding
amount
of extra material prepare the window for
the outer sealing joint
using a suitable masking tape
before fitting the window prime the
soffit to prepare for the wet ceiling
place the window element in the soffit
and fix it temporarily in position
for example using wind bags or mounting
clamps
to achieve a uniform joint appearance
make sure the installation joint is
always in the correct position
put loudgel spacer blocks underneath in
order to transfer the load as specified
in the installation guidelines these can
be combined as required
to ensure millimeter precise level
adjustment
after checking for plumb and level
fasten the element
using blauget frame screws drill the
holes in accordance
with the requirements for the substrate
and in line with the installation
guidelines
and select screws of the appropriate
length
when screwing in make sure that the
screws are not over tightened
otherwise the frame may bulge vertically
back fill the joint with a cord round
three sides
making sure that the joint depth created
is half the joint width
apply the blaugep sealant for example
blau-gelb
silicone alcoxy uniplus using a manual
pressure gun
or a cordless gun then level and smooth
out the sealant
using a stopping knife seal the outer
side
properly with the blough foil outside
applying the blough
foil adhesive pu25lm
again a pressure roller must be used to
do so
attach the foil to the profile with a
self-adhesive strip
and bring the foil into the desired form
apply the foil adhesive
using a manual pressure gun or a
cordless gun and press the foil firmly
to the substrate
using a roller the window sill
can then be installed after alignment
it is fastened directly to the profile
window sill screws
[Music]
before attaching the blaugep insulation
sill profile
pack the cavity with blauget foam
[Music]
the blaugep hybrid polymer power fix is
applied to the cut to size profile
avoids having to use holding down clamps
and removes the need for a sound
deadening strip
while also protecting the window sill
from slipping or being forced upwards
in subsequent work the masking tape can
now be removed from the frame
the joint is then packed with a blough
foam such as the blaugep
1c gun foam premium all season xxl
seal the inner side properly with the
blough foil basic
inside applying the blough foil adhesive
pu25lm
again a pressure roller must be used
more information about our products can
be obtained at www.blaugep.te
Weitere ähnliche Videos ansehen
Avoiding Window Leaks: How to Flash Window Jambs | ZIP System sheathing and tape
T-Joint Flashing | Mastering the Basics | ZIP System® sheathing and tape
Wall Frame Components and Construction Sequence
Tips for Installing Press-in-Place Valve Cover Gaskets | Fel-Pro Gaskets
Windows 10 Clean Install Guide | The ENTIRE process | How to Install Windows 10
Memelihara dan Memperbaiki Instalasi Listrik Bangunan Gedung - Teknik Instalasi Tenaga Listrik
5.0 / 5 (0 votes)