Punawale Underpass की समस्या का कब होगा समाधान? New Tunnel का क्या काम? #pune #news
Summary
TLDRThe video covers various issues related to traffic congestion and infrastructure challenges in Pune. It discusses the growing frustrations of commuters due to the narrow width and low height of the Purnawale underpass, resulting in severe traffic jams. It also highlights the impact of poorly planned BRTS lanes and uneven roads in Kharadi, causing further traffic delays. Additionally, the video mentions a 28 km tunnel project from Khadakwasla to Fursungi, approved by the state government, aimed at improving water distribution. The video concludes with updates on real estate registration offices and the state government's stance on stamp duty reduction.
Takeaways
- 🚗 The commuters are frustrated due to ongoing traffic jams at the Punavale underpass, with issues like narrow width and low height being the major concerns.
- 🔧 Local authorities and NHIA are working on solutions like widening the underpass and relocating electrical infrastructure to alleviate the problems.
- 🌧️ During the rainy season, waterlogging exacerbates the traffic issues, causing significant delays in travel times.
- 🛣️ On Nagar Road, removing BRTS dividers helped reduce traffic issues from Navale to Phoenix Mall, but areas like Kharadi still face traffic problems due to unnecessary dividers and potholes.
- ⚠️ People have raised numerous complaints about road conditions in Kharadi and Chandan Nagar, with slow average speeds caused by uneven roads and lingering BRTS dividers.
- 🚇 A new 28-kilometer tunnel from Khadakwasla to Fursungi has been approved by the state government, aiming to enhance water storage and irrigation efficiency.
- 💧 The tunnel will save water from evaporation and seepage, benefiting both residents and agricultural lands, reducing transportation costs, and conserving water for up to two months.
- 🏢 Maharashtra has 519 registration offices, but many of them lack basic amenities like drinking water and seating, necessitating a revamp.
- 📉 The state government has rejected the real estate developers' request to reduce stamp duty, stating that circle rates have not been increased this fiscal year.
- 🏡 The government will consider infrastructure improvements and new registration offices in areas with high property transactions, ensuring better services in rural and urban regions.
Q & A
What is the main issue discussed in the Purle Underpass segment of the script?
-The main issue discussed is the traffic congestion at the Purle Underpass, which is continuously increasing. The script mentions that the height and width of the underpass might be contributing to the problem.
What solutions are being considered to address the traffic issues at the Purle Underpass?
-The script suggests potential solutions such as widening the underpass, shifting the electrical transformer and distribution box, and discussing the issue with the NHAI for possible solutions.
What is the impact of the traffic congestion on the residents as mentioned in the script?
-Residents are significantly affected by the traffic congestion, with some reporting that it takes half an hour to one hour to travel just 4 to 5 kilometers, which is a major inconvenience.
What is the issue with the traffic on Nagar Road as discussed in the script?
-The script discusses the traffic problem on Nagar Road, particularly after the removal of the BRTS, which has led to an increase in accidents and traffic issues.
What was the previous news coverage about the BRTS on Nagar Road?
-The script refers to a previous news coverage where the BRTS was removed after the metro work was completed, which initially reduced traffic issues but did not address the problem entirely.
What is the proposed tunnel project from Khadakwasla to Fursungi, and what are its expected benefits?
-The proposed tunnel project is expected to be 28 kilometers long and will cost approximately 00 crore rupees. It aims to reduce water evaporation, save on transportation costs, and help supply water to residents for up to two months.
How does the script describe the capacity of Khadakwasla dam and its current usage?
-The script states that the dam's capacity is 31 TMC, but it stores around 29 PMC to avoid full capacity storage. This water supply is used for residents and agricultural lands.
What are the challenges associated with building a dam instead of a tunnel as mentioned in the script?
-Building a dam would require new land acquisition, relocation of residents, and additional tasks for water transportation. The script suggests that a tunnel would be a more efficient solution.
What is the script's stance on the need for more registration offices in Maharashtra?
-The script highlights that there are 519 registration offices in Maharashtra, and it is necessary to revamp them due to a lack of basic infrastructure and drinking water supply.
What is the state government's response to the developer lobby's request regarding the Stamp Duty?
-The script mentions that the state government has not increased the ready reckoner rate for this fiscal year, so there is no question of reducing the Stamp Duty, which will remain at the current rates.
How does the script encourage viewers to stay informed and engaged with the channel?
-The script encourages viewers to like, share, and subscribe to the channel for continuous updates and information, and to comment their thoughts on the future of the real estate market.
Outlines
هذا القسم متوفر فقط للمشتركين. يرجى الترقية للوصول إلى هذه الميزة.
قم بالترقية الآنMindmap
هذا القسم متوفر فقط للمشتركين. يرجى الترقية للوصول إلى هذه الميزة.
قم بالترقية الآنKeywords
هذا القسم متوفر فقط للمشتركين. يرجى الترقية للوصول إلى هذه الميزة.
قم بالترقية الآنHighlights
هذا القسم متوفر فقط للمشتركين. يرجى الترقية للوصول إلى هذه الميزة.
قم بالترقية الآنTranscripts
هذا القسم متوفر فقط للمشتركين. يرجى الترقية للوصول إلى هذه الميزة.
قم بالترقية الآنتصفح المزيد من مقاطع الفيديو ذات الصلة
Punawale - Lohegoan वाले क्यों हैं इतने परेशान ? Dam से Release हुए पानी से क्या हुआ ? #pune #news
Know These Location - Present & Future🔥 Possession इस तरह कभी मत लो🐦🔥 #realestate #saudaghar #pune
Wakad से Hinjawadi Peak Hours में 🔥 देखिए Metro Route की असली तस्वीर, Ground Zero #Pune #development
Hujan Deras Lumpuhkan Jakarta! Kawasan Ciledug dan Fatmawati Terendam Banjir | Liputan 6
Stand for Truth: Mga naipatayong istraktura sa Build Build Build program, alamin!
Seminar Topic- Intelligent Transportation System || Priyanka Sahu (5th sem, Civil)
5.0 / 5 (0 votes)