TLDRChandan Steel Limited's manufacturing process begins with high-quality recycled steel, ensuring thorough inspection and radioactivity testing. The steel undergoes melting and refining to remove impurities in induction furnaces and AOD vessels. Emphasis on environmental protection includes exhaust gas filtration and dust extraction. The production line features continuous casting, rolling mills, and forging divisions, all adhering to strict quality checks and employing advanced technology for precision machining. The plant also specializes in seamless tube manufacturing, with a focus on quality, environmental impact, and customer-specific packaging.
Takeaways
- π Chandan Steel Limited starts the manufacturing process with high-quality recycled steel, ensuring the steel is sourced from certified suppliers and free from hazardous elements.
- π The company performs a radioactivity test on the stainless steel scrap to confirm its quality before processing.
- π₯ The steel scrap is melted in a 20-ton induction furnace, followed by refining in a 25-ton argon oxygen decarburization vessel to remove impurities and reduce carbon content.
- πΏ Environmental protection is a priority, with exhaust gases from the furnace and AOD being filtered and dust extracted to maintain clean air standards.
- π Quality control is rigorous, with melt samples being collected and analyzed at various stages to achieve the desired chemistry.
- π© The liquid steel is cast into various sizes of billets and blooms using a double strand continuous casting machine, ensuring traceability of all heat regards.
- π¨ The billets are checked for macro structure, and samples are preserved before being transferred to versatile rolling mills for size reduction and shaping.
- π οΈ Hot-rolled round bars undergo a series of processes including straightening, peeling, drawing, grinding, and polishing in the prybar division.
- π§ͺ Post-rolling, sections are annealed, straightened, and subjected to pickling in acid tanks for further processing and quality enhancement.
- π The forging division operates with the highest capacity under one roof, ensuring strict quality checks and precision monitoring with the latest technology.
- π The final products undergo a series of quality checks, including mechanical and metallic tests, visual inspections, and non-destructive tests to meet specification compliance.
- π’ The seamless tube and pipe division is India's only fully integrated plant for manufacturing high-quality stainless steel tubes, emphasizing international standards and environmental impact.
Q & A
What type of raw material does Chandan Steel Limited start with for its manufacturing process?
-Chandan Steel Limited starts with high-quality recycled steel, which is thoroughly inspected and sourced from certified suppliers to ensure the removal of hazardous elements.
What tests are conducted to confirm the quality of the stainless steel scrap at Chandan Steel Limited?
-Radioactivity tests are carried out to confirm the quality of the stainless steel scrap, ensuring it meets the required standards.
What is the purpose of the 20-ton induction furnace in the manufacturing process at Chandan Steel Limited?
-The 20-ton induction furnace is used for melting the stainless steel scrap, which is a crucial step in the manufacturing process.
How does Chandan Steel Limited refine the melted steel to remove impurities?
-Refining is done in a 25-ton argon oxygen decarburization vessel, which helps to remove impurities and reduce carbon to the design levels.
What measures are taken to ensure environmental protection during the manufacturing process at Chandan Steel Limited?
-Environmental protection is given high importance by processing exhaust gases from the furnace and AOD into the back house, where gases are filtered and dust is extracted.
How does Chandan Steel Limited maintain traceability in the production process?
-Traceability is ensured by maintaining all heat regards and collecting and analyzing melt samples at various stages to achieve the desired chemistry.
What type of casting machine does Chandan Steel Limited use to produce various sizes of Willits and blooms?
-Chandan Steel Limited uses a six by eleven double strand continuous casting machine for producing various sizes of Willits and blooms.
How are the cast billets checked for quality at Chandan Steel Limited?
-The cast billets are checked for macro structure, and samples are preserved to ensure quality throughout the manufacturing process.
What types of products can be produced by the versatile rolling mills at Chandan Steel Limited?
-The versatile rolling mills at Chandan Steel Limited are capable of producing a wide range of products, including round, hexagon, square shapes, and sections like angles, flattened channels, and tee sections.
What is the process for quality checks on the finished products at Chandan Steel Limited?
-Finished products undergo quality checks for specification compliance, and quality and grades are rechecked using a BMI test facility, mechanical and metallic Rafi tests, followed by visual inspection.
How does Chandan Steel Limited ensure the quality of raw materials received in the forging division?
-Every order received in the forging division first goes through Quality Assurance and is monitored with an Enterprise routing program, ensuring the raw materials are suitable for further processing.
Outlines
π§ Steel Manufacturing Process at Chandan Steel Limited
Chandan Steel Limited's manufacturing process begins with the selection of high-quality recycled steel from certified suppliers. The steel undergoes a rigorous inspection to remove hazardous elements and is tested for radioactivity. The stainless steel scrap is melted in an induction furnace and refined to remove impurities using an argon oxygen decarburization vessel. Environmental protection is emphasized through the processing of exhaust gases. Melt samples are analyzed to achieve the desired chemistry, and the liquid steel is cast into various sizes using a continuous casting machine. The billets are checked for macro structure and then processed in versatile rolling mills to produce different shapes. The products undergo quality checks, including mechanical and metallic tests, before being sent to the forging division, which operates under strict quality assurance.
π High-Quality Seamless Stainless Steel Tube Production
Chandan Steel Limited also specializes in the production of high-quality seamless stainless steel tubes and pipes, being India's only fully integrated seamless tube plant. The plant receives thoroughly inspected billet bars with controlled delta ferrite content. These bars are cut and drilled to achieve a better inner diameter finish. The billets are then heated uniformly and pierced using glass lubrication and molybdenum plugs for improved surface finish. The pierced bars are straightened, pickled, and ground. High-speed cold drawing machines and decreasing setups are used for better surface finish and dimension control. The tubes undergo solution annealing, straightening, and various testing processes including ultrasonic, eddy current, hydro, and underwater testing for quality assurance. The final products are visually inspected, undergo destructive testing, and are瑬度 checked for compliance before being packed for shipment according to customer requirements.
Mindmap
Keywords
π‘Recycled Steel
π‘Radioactivity Test
π‘Induction Furnace
π‘Argon Oxygen Decarburization (AOD)
π‘Environmental Protection
π‘Continuous Casting Machine
π‘Macro Structure
π‘Versatile Rolling Mills
π‘Forging Division
π‘Seamless Tube
π‘Quality Assurance
Highlights
Chandan Steel Limited's manufacturing process begins with the selection of high-quality recycled steel from certified suppliers.
Hazardous elements and radioactivity are carefully removed and tested to ensure the quality of stainless steel scrap.
Melting of stainless steel scrap is done in a 20-ton induction furnace, followed by refining in a 25-ton argon oxygen decarburization vessel.
Environmental protection is prioritized, with exhaust gases from furnaces and AOD being filtered and dust extracted.
Melt samples are analyzed at various stages to achieve the desired chemistry and maintain traceability.
Liquid steel is cast using a six by eleven double strand continuous casting machine to produce various sizes of billets and blooms.
Ingot casting is performed depending on the end product requirements.
Billets are checked for macro structure and samples are preserved for quality assurance.
Rolling mills are capable of producing a hundred thousand metric tons of role products per annum.
Hot rolled round bars undergo straightening, peeling, drawing, grinding, and polishing processes.
Sections like angles, flattened channels, and tee sections are made from preheated billets using cross-country rolling mills.
Quality checks for specification compliance and mechanical properties are performed using BMI test facilities.
Forging division operates under the highest capacity in India, with orders monitored by an Enterprise routing program.
Raw materials undergo strict quality checks before being processed on fully automatic sharing machines.
Forgings are heat treated using a fully automatic furnace to achieve mechanical properties as per relevant specifications.
Precision machining is carried out using CNC machines to ensure close adherence to standard dimensions.
Seamless tube and pipe division is India's only fully integrated stainless steel seamless tube plant.
Bars are cut and deep hole drilled to achieve better ID finish before entering the calibrated walking beam furnace.
Hot piercing process is adapted with indigenous technology for improved surface finish and reduced stress deformation.
Tubes undergo online and offline decreasing, solution annealing, and straightening for uniform heating and desired straightness.
Final inspections include PMI tests, non-destructive tests, and dimensional checks as per applicable standards and QAP.
Quality team approval is required before the material is packed for overseas shipment or domestic supply.
Transcripts
[Music]
welcome to Chandan Steel limited
at Chandan steel manufacturing starts
with the right perches of recycled steel
only high quality scrap is bought from
certified suppliers it is thoroughly
inspected and hazardous elements are
carefully removed radioactivity test is
carried out to confirm the quality the
stainless steel scrap is then
transferred to 20-ton induction furnace
for melting refining is done in 25 ton
argon oxygen decarburization vessel to
remove impurities and carbon is brought
down to the design levels environmental
protection has given high importance by
further processing exhaust gases of
furnace and aod into the back house when
gases filter and all the dust is
extracted melt samples are collected and
analyzed at various stages to achieve
the desired chemistry all heat regards
are maintained to ensure traceability
the liquid steel is transported to six
by eleven double strand continuous
casting machine to produce various sizes
of Willits and blooms
ingot casting is also done depending on
the end product the cast billets are
been checked for macro structure and
samples are preserved the billets are
transferred to for versatile rolling
mills capable of producing a hundred
thousand metric tons role products per
am the preheated billets are rolled with
the help of cross country rolling mills
where size reduction is done and feed
his shapes like round hexagons square
and sections like angles flattened
channels and tea sections are made hot
rolled round bars are sent to prybar
division here bars are straightened
peeled drawn ground and polished and
thoroughly cleaned hot rolled sections
of an
channels flats D sections a solution
annealed straighten
[Music]
and dipped into acid tanks for pickling
and massive ation the bright or the
finished products are subjected to
quality checks for specification
compliance quality and grades are
rechecked using BMI test facility
mechanical and metallic Rafi tests this
is then followed by visual inspection
located just 100 feet away is a forging
division that has the highest capacity
under one roof
every order received first goes through
Quality Assurance and is precisely
monitored with our newly installed
Enterprise routing program once the raw
material mattes ingots and billets are
received from the mother plant they go
through a set of strict quality checks
to ensure that the material is suitable
for further processing it is loaded on
to the fully automatic sharing machine
controlled with a Siemens PLC system
and/or automatic length adjusting
bandsaw machines
enabling the right size weight and count
of the pieces while cutting is in
process the tool room prepares the dies
and rolls required to force the products
according to drawings developed and
controlled using the latest gam
software's the cut piece is then loaded
on to the digitally controlled
preheating furnaces or PLC control
induction heaters temperatures are
monitored and recorded it is then forged
using three optional roots of the glows
dye forgings
[Music]
open-die forging x' and ringed rolling
process a fully automatic heat treatment
furnace is used to heat treat the forged
material in order to achieve the
mechanical properties as with irrelevant
specifications the latest technology and
any bill approved calibrated testing
machines ensure that the results shown
are error less precise machining is done
with C and C and VMC machines ensuring
very close standard dimensions use of
special purpose machines has also done
during this process final inspections
include PMI test all non-destructive
tests visual and dimensional checks as
per applicable standards and QAP are
carried out at this stage after the
tests it is sent for stamping and then
is packed in plywood boxes ask for
customers specific packaging
requirements seamless tube and by
division the plant has been engineered
for manufacturing high quality
international standards stainless steel
seamless tubes and pipes it is India's
only fully integrated stainless steel
seamless tube and by plant the to plant
receives thoroughly inspected and build
pride bars along with the test
certificates the bars have controlled
delta ferrite content to suit the
extensive mechanical work performed on
the material they are cut as per plan
and then deep hole drill to achieve
better ID finish bars then enter
calibrated walking beam furnace and the
uniformly heated billets are ready for
piercing use of glass lubrication for
alter an inner diameter of bars minimize
surface torsional and circumferential
stress deformation with use of
molybdenum plugs
result in improved surface finish of the
product during the indigenous hot
piercing process adapted by chundan
steel the pierced hollow bar is captain
straightened pickled and grounded if
necessary for any surface imperfections
specially designed high speed Auto
feeding cold builder machines supported
by in-house tool room setup and high
cross-sectional reduction result in
better surface finish tight dimension
control and long lengths in the finished
tubes the tubes are then decreased in
the online and offline decreasing setup
our natural gas-fired solution annealing
furnace with auto set temperature
control for uniform heating it has a
minimum impact on the environment the
tubes are then passed through a tendril
straightening machine to achieve desired
straightness the tubes are then cut and
sent for final pickling in acid bath
solution the law passes through
ultrasonic machine eddy current testing
machine hydro testing machine air
underwater testing for checking leakages
and the tubes then it is visually
checked for defects and dimensions the
lock bosses destructive testing like
flaring flattening tensile and inter
granular corrosion practice a C and E it
is also checked for hardness and
microstructure once approved by the
quality team the lot is then passed to
the packing Department along with the
material test certificate the material
is packed suitably for overseas shipment
and also domestic supply based on
customer requirements