Solar power plant case study
Summary
TLDRThe Jones family, living in the suburbs, utilizes a 4 KW solar PV system to generate 17 kWh daily. With a battery installation, they store surplus solar power for night-time use, previously sold to the grid. Meanwhile, in Southern India, a massive solar power plant is being constructed on 2500 acres, aiming to produce 648 MW of clean energy for Tamil Nadu by March 31st, 2016. The project, led by a team from India's leading infrastructure conglomerate, showcases ambitious solar technology and engineering prowess.
Takeaways
- π‘ The Jones family, a suburban household, has a 4 KW solar PV system generating about 17 kWh of electricity daily.
- π During the day, the Joneses use half of their solar power and sell the other half back to the grid.
- π They have installed a battery to store the surplus solar power for use at night, reducing reliance on grid electricity.
- πΏ The family's initiative demonstrates a practical application of solar energy storage for residential use.
- π The script also highlights a massive solar project in Southern India, covering over 2500 acres with 2 million solar modules.
- π·ββοΈ The project employs 8500 workers, showcasing the scale of labor required for large-scale solar installations.
- β±οΈ Despite challenges like tight deadlines and natural events, the team is committed to completing the project on time.
- π The solar power plant aims to generate 648 megawatts of clean energy for the state of Tamil Nadu by March 31st, 2016.
- π§ The project is managed by a team from Adani, one of India's leading infrastructure conglomerates, emphasizing their expertise.
- π The initiative is a significant step towards sustainable energy, aiming to make one of the world's largest solar power plants in a single location.
Q & A
What is the capacity of the solar PV system installed by the Jones family?
-The Jones family has a 4 KW solar PV system.
How much electricity does the Jones family's solar system generate daily?
-The solar system generates about 17 kilowatt-hours of electricity each day.
What do the Joneses do with the solar power they don't use during the day?
-They use around half of their solar power and sell the other half back into the grid.
Why did the Jones family decide to install a battery?
-They decided to install a battery to store the extra solar power generated during the day for use at night.
What change occurs after the Jones family installs the battery?
-The solar power that was being sold to the grid during the day can now be stored in the battery instead.
What is the size of the solar power plant being constructed in Southern India?
-The solar power plant is being constructed on more than 2500 acres of land.
How many solar modules are planned to be used in the solar power plant in Southern India?
-The plant will use 2 and a half million solar modules.
What is the capacity of the solar power plant in Southern India?
-The plant will have a capacity of 648 megawatts.
To which state will the solar power plant export electricity?
-The solar power plant will export electricity to the South Indian state of Tamil Nadu.
What is the deadline for completing the solar power plant in Southern India?
-The plant is planned to be completed by March 31st, 2016.
Which company is responsible for constructing the solar power plant in Southern India?
-The construction is being handled by a team from Adani, one of India's leading infrastructure conglomerates.
Outlines
This section is available to paid users only. Please upgrade to access this part.
Upgrade NowMindmap
This section is available to paid users only. Please upgrade to access this part.
Upgrade NowKeywords
This section is available to paid users only. Please upgrade to access this part.
Upgrade NowHighlights
This section is available to paid users only. Please upgrade to access this part.
Upgrade NowTranscripts
This section is available to paid users only. Please upgrade to access this part.
Upgrade Now5.0 / 5 (0 votes)