Pune road connectivity : PMRDAचे कमिशनर डॉ.योगेश म्हसे यांची खास मुलाखत... भाग-1 | LetsUpp Marathi

LetsUpp Marathi
15 Jul 202513:24

Summary

TLDRIn this program, Dr. Yogesh Mase Patil, the Metropolitan Commissioner of Pune Metropolitan Development Authority (PM RD), discusses major infrastructure and development projects in the Pune region. He outlines plans to improve road connectivity to 11 industrial estates, including the development of concrete roads and airport connectivity, as well as plans for tourism, religious, and urban growth centers. Emphasizing sustainable, long-term infrastructure, the program covers comprehensive projects such as enhancing roads to tourist spots, religious places, and providing modern amenities like parking, toilets, and solar-powered lighting, ensuring smoother transport and better facilities for citizens and visitors.

Takeaways

  • 😀 A comprehensive Rs 700 crore PM RD plan has been approved to improve industrial connectivity around Pune by linking 11 industrial estates to National and State Highways.
  • 😀 No road within the PM RD area will be asphalted; all roads will be constructed using concrete to ensure durability and reduce maintenance needs over 25 years.
  • 😀 The CM has mandated a minimum width of 18 meters for all roads under PM RD, with some roads like the Ring Road reaching 65 meters wide.
  • 😀 Contractors will be responsible for maintaining concrete roads for a period of up to 15 years after construction, beyond the usual 2-year maintenance period.
  • 😀 Airport connectivity will be handled through a single, unified tender, ensuring smooth and continuous road development leading to the new Purandar airport.
  • 😀 The Comprehensive Mobility Plan (CMP) aims to develop 22 key roads, improving connectivity between major national and state highways outside Pune and PCMC.
  • 😀 Tourism connectivity is a priority, with concrete roads planned for popular tourist spots like Lohagad Fort, Rajmachi Fort, and others to improve accessibility.
  • 😀 Special attention is being given to parking facilities and infrastructure (e.g., toilets and water supply) at tourist spots to manage increased crowds and reduce congestion.
  • 😀 Religious connectivity projects focus on improving infrastructure at key temples, providing concrete roads, parking, and essential amenities like lighting and water.
  • 😀 The PM RD projects also include the development of underground drainage systems for urban areas, with administrative approvals already in place for these improvements.

Q & A

  • What is the main objective of the PM RD plan discussed in the transcript?

    -The PM RD plan aims to connect 11 industrial estates adjacent to Pune to the National and State Highways, with a focus on improving road infrastructure and industrial connectivity.

  • What is the total cost of the PM RD plan for industrial connectivity?

    -The total cost of the PM RD plan for industrial connectivity is Rs 700 crore.

  • What specific change has been made regarding road construction within the PM RD area?

    -The PM RD area will no longer have asphalted roads. All roads within the area will be made of concrete, ensuring long-term sustainability.

  • What is the required width for roads within the PM RD area as per the CM's orders?

    -According to the CM's orders, no road within the PM RD area should be below 18 meters in width. There is no upper limit for road width.

  • How long will the contractor be responsible for maintaining the newly constructed concrete roads?

    -The contractor will be responsible for maintaining the concrete roads for a period of 10 years, with the possibility of extending it for another 15 years if necessary.

  • What is the current status of the road development plan for airport connectivity?

    -A comprehensive airport connectivity plan has been prepared, with an estimated cost of Rs 1.5 crore. The plan aims to develop continuous, concrete roads to and from the airport, and a single tender will be issued to avoid delays.

  • What is the CMP (Comprehensive Mobility Plan) and how does it relate to the road development projects?

    -The CMP is a road development plan prepared by L&T in 2018. The PM RD aims to implement the plan by developing 22 roads that connect major national and state highways outside Pune, facilitating smoother regional connectivity.

  • What is the focus of the tourism connectivity project mentioned in the transcript?

    -The tourism connectivity project focuses on improving access to popular tourist destinations like Lohagad Fort and Bushi Dam. It involves developing concrete roads and adding infrastructure such as parking facilities, toilets, drinking water, and security measures.

  • How will the religious connectivity projects be developed?

    -Religious connectivity projects will involve developing roads leading to important temples and religious sites, along with providing essential infrastructure such as parking facilities, shelter sheds, and drinking water facilities. The roads will also be made of concrete.

  • What steps are being taken to ensure safety and prevent accidents at tourist sites?

    -The PM RD has planned to install safety features such as fences and security points at tourist sites like Tiger Point to prevent accidents and enhance safety for visitors.

Outlines

plate

このセクションは有料ユーザー限定です。 アクセスするには、アップグレードをお願いします。

今すぐアップグレード

Mindmap

plate

このセクションは有料ユーザー限定です。 アクセスするには、アップグレードをお願いします。

今すぐアップグレード

Keywords

plate

このセクションは有料ユーザー限定です。 アクセスするには、アップグレードをお願いします。

今すぐアップグレード

Highlights

plate

このセクションは有料ユーザー限定です。 アクセスするには、アップグレードをお願いします。

今すぐアップグレード

Transcripts

plate

このセクションは有料ユーザー限定です。 アクセスするには、アップグレードをお願いします。

今すぐアップグレード
Rate This

5.0 / 5 (0 votes)

関連タグ
Pune DevelopmentInfrastructureConnectivity ProjectsTourism RoadsIndustrial EstatesUrban GrowthReligious ConnectivitySustainable RoadsConcrete RoadsPM RD ProjectsAirport Connectivity
英語で要約が必要ですか?