Complete House Construction procedure step by step| 30 steps | घर बनाने का सही तरीका |

Construction Zone
2 Jul 202422:50

Summary

TLDRThis video provides a detailed step-by-step guide for building a house, covering crucial aspects from foundation to finishing. It emphasizes key stages such as the pouring and curing of concrete slabs, completing electrical and plumbing works before casting, plastering, tiling, and final installations. It also highlights the importance of proper sequencing, including the installation of doors and windows, flooring, and acid washing before hardware is fixed. The video encourages viewers to ensure all work is thoroughly checked and completed for a durable and aesthetic home, with helpful tips for overcoming common construction challenges.

Takeaways

  • 😀 Ensure proper slab curing by watering it for at least 10-14 days to strengthen the slab.
  • 😀 Always complete electrical work and check pipe points before casting the slab to avoid issues later.
  • 😀 The slab should not be removed before 14 days to ensure its integrity and strength.
  • 😀 Use chicken mesh around column joints and electrical pipes before plastering to prevent cracks.
  • 😀 The thickness of plaster for ceilings should be around 6mm, internal walls 12mm, and external walls 18mm.
  • 😀 Use a 1:4 or 1:6 cement-to-sand ratio for regular plastering work.
  • 😀 Tile work should start with completing door and window frames and kitchen counters before proceeding to flooring.
  • 😀 Acid wash the flooring before installing SS railings or door fittings to prevent staining from hard acids.
  • 😀 Complete the door installation and secure it before starting electrical wiring to prevent potential theft.
  • 😀 After finishing the plastering and flooring, apply primer and putty before using high-quality branded paint for a polished look.
  • 😀 Always consult construction guides and videos for solutions if issues arise during any construction phase.

Q & A

  • How long should the slab be cured after casting?

    -The slab should be cured by watering it for at least 10 to 14 days to ensure proper strength and durability.

  • When should the slab be opened after casting?

    -The slab should not be opened before 14 days. It needs this time to properly set and gain strength.

  • What is the importance of completing electrical and plumbing work before slab casting?

    -Electrical and plumbing work must be completed before casting the slab because making changes later becomes difficult once the slab is in place.

  • When should concealed plumbing and electrical work be completed?

    -Concealed plumbing should be completed before plastering. Electrical work, especially for pipes or fan points, should also be done before plastering to avoid difficulties in adjustments afterward.

  • What is the purpose of using chicken mesh during plastering?

    -Chicken mesh should be used at column and wall joints to prevent cracking in the plaster and ensure better adhesion.

  • What is the recommended plaster thickness for different areas?

    -The plaster thickness should be 6mm for ceilings, 12mm for internal walls, and 18mm for external walls.

  • What should be the cement-to-sand ratio for regular plaster?

    -The cement-to-sand ratio for regular plaster should be 1:4 or 1:6, depending on the requirements.

  • Why is acid washing necessary before installing stainless steel fittings?

    -Acid washing is necessary to remove cement stains from the floor. This process should be done before installing stainless steel fittings to prevent them from getting stained or discolored.

  • What is the order of installation for doors, windows, and wiring?

    -Doors should be installed first to secure the premises, followed by wiring installation. Installing wiring before doors can lead to the risk of damage or theft due to unsecured access.

  • How can the finishing touches on the house, like painting, be completed?

    -For the finishing touches, clean the walls thoroughly, apply primer, use putty, and then apply two coats of good-quality paint to achieve a polished, attractive finish.

Outlines

plate

Cette section est réservée aux utilisateurs payants. Améliorez votre compte pour accéder à cette section.

Améliorer maintenant

Mindmap

plate

Cette section est réservée aux utilisateurs payants. Améliorez votre compte pour accéder à cette section.

Améliorer maintenant

Keywords

plate

Cette section est réservée aux utilisateurs payants. Améliorez votre compte pour accéder à cette section.

Améliorer maintenant

Highlights

plate

Cette section est réservée aux utilisateurs payants. Améliorez votre compte pour accéder à cette section.

Améliorer maintenant

Transcripts

plate

Cette section est réservée aux utilisateurs payants. Améliorez votre compte pour accéder à cette section.

Améliorer maintenant
Rate This

5.0 / 5 (0 votes)

Étiquettes Connexes
Home ConstructionSlab CastingPlumbing WorkElectrical WorkPlasteringTilingFlooringHouse BuildingConstruction GuideInterior DesignHome Improvement
Besoin d'un résumé en anglais ?