Isère : Grand'Maison, la centrale hydroélectrique la plus puissante d'Europe
Summary
TLDRThe Grand Maison dam, situated at 1700 meters in the Loison massif, is Europe's most powerful hydroelectric facility. Constructed over four years, it can simultaneously supply electricity to major cities and ramp up to full power in under three minutes. With 13 million cubic meters of materials sourced locally, the dam features advanced monitoring systems to ensure safety. The facility includes a pumped storage system that balances energy supply, storing excess power for later use. Currently under maintenance for enhancements, the station showcases the expertise and teamwork vital to its operation and the broader field of hydroelectric energy.
Takeaways
- 🌍 The Grand Maison dam is located at an altitude of 1700 meters in the Loison massif and is one of Europe's most powerful hydroelectric plants.
- 🔌 It can simultaneously supply electricity to major cities including Lyon, Grenoble, and Chambéry.
- ⚡ The dam can go from zero to maximum power in under 3 minutes, showcasing its rapid response capabilities.
- 🏗️ Construction of the dam took 4 years, starting in 1981 and finishing with water filling in 1984, utilizing materials sourced directly from the site.
- ⛏️ The construction involved significant logistical operations, including daily blasting to prepare the site for rock placement.
- 📏 Monitoring systems are in place, with over 300 devices used to measure water infiltration and other parameters to ensure safety.
- 💧 The electricity generation process starts with water traveling through a 7 km gallery, which leads to turbines for energy conversion.
- 🔄 Grand Maison operates as a pumped storage power station, balancing energy supply by storing excess energy when production exceeds demand.
- 🛠️ Maintenance is critical; the facility undergoes regular revisions to improve efficiency and ensure operational reliability.
- 🤝 The teamwork and expertise of the staff contribute significantly to the successful operation of the hydroelectric facility.
Q & A
What is the altitude of the Grand Maison dam?
-The Grand Maison dam is situated at an altitude of 1,700 meters.
What is the primary function of the Grand Maison dam?
-The dam primarily supplies water to Europe's most powerful hydroelectric power station.
How long did it take to construct the Grand Maison dam?
-The construction of the dam took four years, starting in 1981 and finishing in 1984.
What materials were used for the construction of the dam?
-The dam was built using 13 million cubic meters of local earth and rock sourced from the surrounding area.
How quickly can the Grand Maison dam reach maximum power?
-The dam can go from zero to maximum power in less than three minutes.
Which cities can be powered simultaneously by the Grand Maison dam?
-The dam can simultaneously power the cities of Lyon, Grenoble, and Chambéry.
What is a 'step' in the context of this hydroelectric facility?
-'Step' refers to a pumped storage station that helps balance the energy grid by storing excess energy and releasing it when demand increases.
What kind of monitoring systems are in place at the dam?
-There are approximately 300 monitoring devices that track water infiltration and other crucial metrics to ensure the dam's integrity.
What is the purpose of the maintenance work currently being done on the dam?
-The maintenance work aims to upgrade the facility to produce more energy and ensure ongoing operational efficiency.
Where can viewers learn more about hydroelectricity related to the Grand Maison dam?
-Viewers can visit the museum dedicated to hydroelectricity for more information and insights.
Outlines
Dieser Bereich ist nur für Premium-Benutzer verfügbar. Bitte führen Sie ein Upgrade durch, um auf diesen Abschnitt zuzugreifen.
Upgrade durchführenMindmap
Dieser Bereich ist nur für Premium-Benutzer verfügbar. Bitte führen Sie ein Upgrade durch, um auf diesen Abschnitt zuzugreifen.
Upgrade durchführenKeywords
Dieser Bereich ist nur für Premium-Benutzer verfügbar. Bitte führen Sie ein Upgrade durch, um auf diesen Abschnitt zuzugreifen.
Upgrade durchführenHighlights
Dieser Bereich ist nur für Premium-Benutzer verfügbar. Bitte führen Sie ein Upgrade durch, um auf diesen Abschnitt zuzugreifen.
Upgrade durchführenTranscripts
Dieser Bereich ist nur für Premium-Benutzer verfügbar. Bitte führen Sie ein Upgrade durch, um auf diesen Abschnitt zuzugreifen.
Upgrade durchführenWeitere ähnliche Videos ansehen
Hydroelectric energy and Hydropower Plants | Lesson 7.2 | Earth Science
Hydroelectric Power - IB Physics
The Evolution Of Renewable Energy | How Did They Built That? | Spark
Welcome to Darlington Nuclear Generating Station
Hydroelectric Power - How it Works
Chine : le barrage des Trois Gorges, chantier pharaonique aux conséquences désastreuses
5.0 / 5 (0 votes)